Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4781 2004 200250 2026 Construction of Techinically & Economically Feasible 35 KMs Roads in D.I.Khan Division.-(A) /PDWP /07-02-2025 Roads 690.000 576.800 0.000 113.200 6 View
4782 2005 200252 2026 Construction of Techinically & Economically Feasible 100 KMs Roads in Mardan Division.-(A) /PDWP /19-11-2025 Roads 3279.369 1898.600 0.000 481.600 7 View
4783 2006 200326 2026 F/S, Design and Construction of 40 No. of existing steel bridges to RCC Bridges including new bridges (DFID Assisted, Acrow / NATO Canadian steel Bridges provided by Pak Army) (Phase-I)-(A) /PDWP /08-03-2022 Roads 2546.700 473.000 0.000 150.000 8 View
4784 2007 210456 2026 Construction of Roads and Bridges in Khyber Pakhtunkhwa-(A) /PDWP /23-06-2022 Roads 3000.000 1846.400 0.000 220.000 7 View
4785 2008 220398 2026 Khyber Pakhtunkhwa Roads Accessibility Projects (KP RAP) World Bank Assisted-(A) /ECNEC /14-05-2025 Roads 6986.000 120.000 0.000 70.400 7 View
4786 2009 240288 2026 Upgradation / Rehabilitation and Construction of roads in KPK.-(A) /PDWP /07-02-2025 Roads 9321.200 833.670 0.000 670.000 10 View
4787 2010 251055 2026 Strengthening of RAMS Unit in C&W Department-(A) /PDWP /06-02-2026 Roads 256.556 30.000 40.000 149.600 13 View
4788 2011 251474 2026 Acquisition of Land, Utility Shifting and Resettlement for Road connecting Indus Highway(N-55) at Take Off Bannu Link Road with Hakla-Yarak-D.I.Khan Motorway(M-14)-(A) /PDWP /18-12-2025 Roads 1868.864 260.000 0.000 176.000 13 View
4789 2012 220539 2026 Construction of leftover ongoing schemes of PERRA in Earthquake affected District of Khyber Pakhtunkhwa-(B) / / Roads 2264.600 44.000 0.000 15.000 17 View
4790 2013 251554 2026 Innovative Intervention in Road Sector-(B) / / Roads 100.000 0.000 0.000 22.000 8 View
CWD