Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4711 1942 260379 2026 Rehabilitation of Provincial Highway (S-3-B) from Bagh Dherai to Madyan (Section KM 75-88), District Swat.-(B) / / Roads 1500.000 0.000 0.000 88.000 11 View
4712 1943 260381 2026 Construction of Jehangira Bridge on Swabi-Jehangira Road District Swabi.-(B) / / Roads 4500.000 0.000 0.000 88.000 8 View
4713 1944 260382 2026 Construction of Topi Hemlet Road District Swabi (5.5 KM)-(B) / / Roads 700.000 0.000 0.000 55.000 10 View
4714 1945 260384 2026 Rehabilitation & Improvement of Abbottabad Nathiagali Barian Road (L=57.50 KMs) & Kuzagali Ayubia - Khanspur Road (6.15 KMs)-(B) / / Roads 5092.000 0.000 0.000 100.000 14 View
4715 1946 260385 2026 Construction of Jabbar Bridge along with re-habilitation of old Kandar road (1.3 KM) District Kohat.-(B) / / Roads 350.000 0.000 0.000 46.200 10 View
4716 1947 260386 2026 Design & Construction of Road from Akhagram to Chukyatan on left side of Punjkora River, Dir Upper.-(B) / / Roads 4000.000 0.000 0.000 100.000 9 View
4717 1948 260387 2026 Widening of Peshawar Warsak road from st. Marry's school to Northern Bypass S-4 Length = 9 Km (PRP)-(B) / / Roads 7000.000 0.000 0.000 100.000 7 View
4718 1949 260388 2026 Construction of Katlang Bypass Road on Provincial Highway (S-10-B) District Mardan (Mardan Package).-(B) / / Roads 4500.000 0.000 0.000 125.000 8 View
4719 1950 260390 2026 Improvement & Widening of Tajazai - Lakki Section of Provincial Highway (S-11) (12 Km) District Lakki Marwat.-(B) / / Roads 2220.000 0.000 0.000 100.000 8 View
4720 1951 260392 2026 Feasibility Study / Detailed Engineering Design and Construction of Access Controlled Link Road from Takhtbhi, Shergarh to Hathian, Lundkhwar, Katlang (Babuzai Interchange) District Mardan.-(B) / / Roads 15.000 0.000 0.000 15.000 11 View
CWD