Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4751 2239 195301 2026 Improvement and Rehabilitation of road from Pir Qala to Ghalanai (Balance portion) (14-km) (AIP)-(A) /PDWP /02-06-2020 Roads 2155.000 1718.510 0.000 436.490 10 View
4752 2240 200327 2026 Construction of Road connecting Sub Division Wazir to Bannu circular Road (AIP)-(A) /PDWP /31-10-2022 Roads 9890.500 1192.500 0.000 80.000 8 View
4753 2241 210777 2026 Rehabilitation and Improvement of Thall Parachinar road District Kurram.-(A) /PDWP /12-12-2024 Roads 9980.500 400.000 0.000 200.000 12 View
4754 2242 220613 2026 Dualization Of Bannu Miran Shah Ghulam Khan Road District North Waziristan, Phase-II (37.65 KM)-(A) /PDWP /31-10-2022 Roads 8886.700 330.200 0.000 80.000 5 View
4755 2243 210616 2026 Rehabilitation of Wana Angoor Adda Road (52 Km)- South Waziristan-(A) /PDWP /18-05-2022 Roads 3338.300 322.500 0.000 120.000 8 View
4756 2244 220939 2026 Construction and improvement of feasible roads in Merged Areas-(A) /PDWP /21-04-2025 Roads 3145.900 615.000 0.000 40.000 19 View
4757 2245 251225 2026 Improvement Widening & Rehabilitation of 28 Black Top road from Dwa Toi to Haider Kandow-(A) /PDWP /08-01-2026 Roads 8880.550 697.000 0.000 120.000 11 View
4758 2246 261319 2026 Construction of Roads and Bridges in Merged Areas-(B) / / Roads 8000.000 0.000 0.000 0.001 10 View
4759 1982 100429 2026 Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.-(A) /PDWP /22-01-2015 Roads 972.400 499.700 0.000 300.000 12 View
4760 1983 130391 2026 F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa.-(A) /DDWP /02-04-2014 Roads 100.000 26.500 0.000 73.500 12 View
CWD