Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4691 1922 210769 2026 F/S and Construction of Buner Karakar Tunnel District Buner-(A) /PDWP /31-10-2022 Roads 9582.900 2623.000 0.000 310.000 10 View
4692 1923 220397 2026 Construction of Road from Patrack to Thall Kumrat District Upper Dir (44-KMs)-(A) /PDWP /30-04-2026 Roads 9201.279 1967.900 0.000 572.400 4 View
4693 1924 220406 2026 Construction of Shaheeda Sar to Etay Khwar, Sar Kala to Bar Teraj Road and improvement of Btara to Shangra Road District Buner-(A) /PDWP /07-02-2025 Roads 1424.800 135.000 0.000 50.000 12 View
4694 1925 220606 2026 Construction of RCC bridge on DI Khan Darya Khan Road.-(A) /PDWP /03-09-2025 Roads 5186.102 200.000 0.000 150.000 9 View
4695 1926 220638 2026 Feasibility Study, Detailed Engineering Design and construction of dualization of road from Indus Highway to Bannu City (26-KM)-(A) /PDWP /31-10-2022 Roads 9958.240 10.000 0.000 55.000 8 View
4696 1927 220642 2026 Acquisition of land for Dir Motorway-(A) /PDWP /22-04-2022 Roads 3227.700 1948.800 0.000 96.800 8 View
4697 1928 220942 2026 Construction of RCC Bridge on River Indus near Kotkay Kandar, District Torghar.-(A) /PDWP /01-12-2022 Roads 9948.200 2770.000 0.000 126.000 13 View
4698 1929 220943 2026 F/S detailed Engineering design for construction of Inter District road from Torghar to Buner District (length =25 km)-(A) /PDWP /31-10-2022 Roads 4723.200 1616.000 0.000 200.000 4 View
4699 1930 221119 2026 Widening and Rehabilitation of road from Baryam Chowk to Wanai, Matta District Swat (10.3 KM)-(A) /PDWP /18-10-2023 Roads 987.100 482.800 0.000 88.000 13 View
4700 1931 240193 2026 Rehabilitation Of Batkhela Totakan Qulangy Section (Km 00-22) P-H/Way (S-3), District Malakand-(A) /PDWP /27-02-2026 Roads 1265.363 100.000 0.000 88.000 4 View
CWD