Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4681 1912 190341 2026 Widening / Improvement / Rehabilitation of road from Beer to Kalangir on Haripur - Chappar Road Section of Provincial Highway S-12 (17 Km)-(A) /PDWP /12-12-2024 Roads 1763.100 1235.000 0.000 150.000 7 View
4682 1913 190490 2026 Construction of Flyover at Kulader Chowk Charsadda.-(A) /PDWP /01-12-2022 Roads 1562.200 542.500 0.000 250.000 11 View
4683 1914 190511 2026 F/S and detailed design of Peshawar - D.I.Khan Motorway.(320 KM).-(A) /CDWP /22-07-2019 Roads 320.000 160.100 0.000 55.000 7 View
4684 1915 190556 2026 F/S, Design & Reconst: of Bridges: Arsala(S-11), Aghan Pur(S-10), Drwaza Kas(S-8), Doghi (S-12), Bada on Swabi Topi Rd(S-1), Khyali(S-1), Matra (S-4), Machni (S-4), kababian (S-4), Dehri (S-10), Aloch Puran(S-10A), Chena on Swari Ambela Rd (S-10A)-(A) /PDWP /30-04-2026 Roads 2842.674 893.900 0.000 176.000 13 View
4685 1916 190558 2026 Dualization of Swabi Jehangira Road left over portion 11 Km i/c bridge on River Indus-(A) /PDWP /29-06-2020 Roads 3367.700 1617.400 0.000 200.000 7 View
4686 1917 190566 2026 Dualization of road from katlang Bazar Doran Abad chowk (Chungi) Mardan-(A) /PDWP /27-08-2021 Roads 3344.900 906.500 0.000 264.000 7 View
4687 1918 200290 2026 F/S, Design, & Construction of Khandia Road Upper Kohistan-(A) /PDWP /02-12-2021 Roads 5543.400 606.300 0.000 176.000 11 View
4688 1919 210452 2026 Feasibility study and Construction of Chupryal Bypass road (2.5 Km) District Swat-(A) /PDWP /07-02-2025 Roads 809.400 384.800 0.000 150.000 15 View
4689 1920 210454 2026 Feasibility study and Construction of Khwazakhela Bypass District Swat.-(A) /PDWP /03-03-2022 Roads 1368.800 717.300 0.000 200.000 9 View
4690 1921 210516 2026 F/S , Design and Construction of Grade separated intersection at Shaheed Chowk Timergara.-(A) /PDWP /03-09-2025 Roads 1617.355 570.000 0.000 100.000 11 View
CWD