Address

Civil Secretariat, Peshawar

Contact Number

  091-9214039

Opening Hours

  Monday - Friday
  9:00 AM - 5:00 PM

Follow Us

Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
941 1652 193173 2023 Construction of approach roads to mineral bearing areas (A) BOD/15/09/2017 [FDA]-(A) /BOD /15-09-2017 Roads 260.059 0.000 0.000 125.587 27 View
942 1653 200173 2023 Replacement of Steel Bridges Installed by Pak Army with RCC Pre Stressed Bridges in Merged Areas-(B) / / Roads 800.000 0.000 0.000 7.200 14 View
943 1252 120362 2023 Emergent nature and Additional Construction of Office/Residential Buildings.-(A) /PDWP /26-05-2021 Roads 431.077 347.890 0.000 20.206 16 View
944 1253 120842 2023 Establishment of Project Unit for PaRRSA / PDMA for USAID Projects in C&W Department.-(A) /PDWP /17-09-2019 Roads 269.070 244.827 8.569 20.733 31 View
945 1254 120870 2023 Continuing Professional Development of Engineers-(A) /DDWP /07-04-2012 Roads 3.730 3.320 0.000 0.520 35 View
946 1255 180346 2023 Extension of Existing Facility of MIS/ GIS for Paperless Environment in C&W Department-(A) /PDWP /11-03-2022 Roads 1448.620 456.005 0.000 86.018 13 View
947 1256 200004 2023 Provision of Buildings and Department for NH&MP on Swat Expressway-(A) /PDWP /22-12-2020 Roads 749.740 32.994 0.000 41.574 11 View
948 1257 210448 2023 F/S & Designing of Mega Projects (Buildings) in Khyber Pakhtunkhwa-(B) / / Roads 500.000 0.000 0.000 10.607 37 View
949 1519 220607 2023 Feasibility Study, Detail Engineering Design and construction of Road connecting Indus Highway (N-55) at Take Off Bannu Link Road with Hakla - Yarak - D.I.Khan Motorway (M-14)-(B) / / Roads 20000.000 0.000 0.000 0.004 11 View
950 1520 220752 2023 Construction of warai bazar bypass (PPP) (Cost=700M)-(B) / / Roads 0.005 0.000 0.000 0.004 37 View
CWD