S.No | ADP Number | Scheme Code | Year | Scheme Name | Sector Name | Local Cost | Previous Expenditure | Revenue Allocation | Total Allocation | Views | Detail |
---|---|---|---|---|---|---|---|---|---|---|---|
3591 | 1647 | 251585 | 2025 | Construction of Black Topped Road from Toormandi to Spinkai Raghzai via Changhmalai (38 Km), District South Waziristan Upper-(B) / / | Roads | 2800.000 | 0.000 | 0.000 | 0.001 | 3 | View |
3592 | 1659 | 195247 | 2025 | Construction of B/Topped Road from Mastak Bridge to Shadally via Methra in Tribal District, Khyber (28-KMs) Khyber (FMR) (AIP)-(A) /PDWP /26-12-2019 | Roads | 934.418 | 891.886 | 0.000 | 42.532 | 3 | View |
3593 | 1660 | 195250 | 2025 | Construction of Black Topped Road from Sadgai village to Dewgar Sadgai Tehsil Ghulam Khan (11 KMs) (FMR) (AIP)-(A) /PDWP /29-07-2024 | Roads | 627.257 | 333.448 | 0.000 | 100.000 | 3 | View |
3594 | 1661 | 195251 | 2025 | Construction of B/T Road from Garyum Dossali Road to Dossali Village, Tehsil Dossali, Sub Divisino Razmak (5-KMs) (FMR) (AIP)-(A) /PDWP /09-01-2020 | Roads | 137.815 | 33.317 | 0.000 | 50.000 | 4 | View |
3595 | 1662 | 195255 | 2025 | Construction of Hakim Khel to Broomi Khel Road, Tehsil Mirali (3 KM) (FMR) (AIP).-(A) /PDWP /09-01-2020 | Roads | 53.000 | 30.759 | 0.000 | 22.241 | 4 | View |
3596 | 1663 | 195257 | 2025 | Construction & B/Topping of Dando Bartrass Arang Pajegram via Dherai Road (07-KMs) Bajaur (FMR) (AIP)-(A) /PDWP /09-10-2019 | Roads | 169.250 | 51.132 | 0.000 | 118.118 | 3 | View |
3597 | 1664 | 195260 | 2025 | Construction and B/Topping of Tang Khata Dherai Road (02-KMs) Bajaur (FMR) (AIP)-(A) /PDWP /04-02-2020 | Roads | 46.249 | 26.250 | 0.000 | 19.999 | 3 | View |
3598 | 1665 | 195263 | 2025 | Construction of Road from Chakai Kalai to Sakhi Ahmad Shah Killi (Thall Parachinar Main Road) Lower Kurram (2.0-KMs) (FMR) (AIP)-(A) /PDWP /09-01-2020 | Roads | 62.691 | 16.150 | 0.000 | 46.541 | 3 | View |
3599 | 1666 | 195267 | 2025 | Improvement & Widening of the existing BTR from Main Ghallany road to Sar Lara (64-KMs) (TR) (AIP)-(A) /PDWP /28-09-2022 | Roads | 1978.610 | 905.393 | 0.000 | 100.000 | 3 | View |
3600 | 1667 | 195268 | 2025 | Improvement & Rehabilitation of Parachinar Tarimangal Road (23-KMs) (TR) (AIP)-(A) /PDWP /17-04-2025 | Roads | 732.350 | 531.944 | 0.000 | 30.000 | 4 | View |