Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3581 1637 251516 2025 F/S & Construction of 05km BTR road from Khanzada korona to Jamal Kot TSD Lakki-(B) / / Roads 300.000 0.000 0.000 10.000 2 View
3582 1638 251518 2025 F/S for Construction Of 10KM Black Top Road From Bakhta Abad To Imran Khel Pewasar Ping Area TSD Jandola District Tank.-(B) / / Roads 5.000 0.000 0.000 1.000 2 View
3583 1639 251529 2025 Construction of Main Zarmilana Road to Haji Gul Suleman Khel Korona (7-KM)-(B) / / Roads 350.000 0.000 0.000 70.000 2 View
3584 1640 251566 2025 F/S for Construction of 5 KM Black Top Road from Rizwan Dani Khel Korona to Khaleem Malak khel Lower Waziristan-(B) / / Roads 5.000 0.000 0.000 0.001 3 View
3585 1641 251572 2025 Construction of BTR from main maintoy market to Abid ullah Kot SWTD (Lower)-(B) / / Roads 200.000 0.000 0.000 0.001 2 View
3586 1642 251576 2025 D-Chock Nermuhammad Road to Ser Doog Kurm Ghari 15 KM Tehsil Mirali North Wazirstan-(B) / / Roads 350.000 0.000 0.000 0.001 2 View
3587 1643 251577 2025 Construction / Rehabilitation of Road from Rescue 1122 Center Chappari to Musa Khel via Mateen Khel Killa Sub Division Wazir Bannu (10 KM).-(B) / / Roads 250.000 0.000 0.000 0.001 3 View
3588 1644 251580 2025 Construction of 5 km Main Wana bypass bamrai to mati kaka chowk South Waziristan Lower-(B) / / Roads 320.000 0.000 0.000 0.001 2 View
3589 1645 251583 2025 Construction of Black Topped Road from Smal to Ghundakal Saruna via Pangay (14 Km), including cost of dislocated machinery, District South Waziristan Upper-(B) / / Roads 1300.000 0.000 0.000 0.001 3 View
3590 1646 251584 2025 Construction and Black Topping of Road from Sam Masap Mella Dara Malik Shahi Area via Mashta (45 Km), connecting Asman Manza, District South Waziristan Upper-(B) / / Roads 2860.000 0.000 0.000 0.001 2 View
CWD