Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4511 1742 250965 2026 Construction of Gabin Jabba to Sedgai Dand Road (08-KM) in District Swat.-(B) / / Roads 400.000 0.000 0.000 10.000 6 View
4512 1743 250997 2026 F/S and design for Rehabilitation / improvement /Blacktopping of Kolai road from Pallas Sair Ghaziabad to Kolai Maidan-(B) / / Roads 5.000 0.000 0.000 5.000 5 View
4513 1744 251218 2026 Construction of Road from Karak to Charpara via Nashpa and Andi Karak Cost-(B) / / Roads 450.000 0.000 0.000 33.000 16 View
4514 1745 251390 2026 Construction, Improvement, Rehabilitation & Widening of BT Roads in D.I Khan Division.-(B) / / Roads 3800.000 0.000 0.000 150.000 11 View
4515 1746 251391 2026 Construction, Improvement, Rehabilitation & Widening of BT Roads in Kohat Division.-(B) / / Roads 3800.000 0.000 0.000 220.000 8 View
4516 1747 251426 2026 F/S, design, and construction/rehabilitation of various RCC bridges on need basis.-(B) / / Roads 1500.000 0.000 0.000 176.000 15 View
4517 1748 251429 2026 Rehabilitation/Improvement of road from: 1).Galai to Choi Kyari. 2). Construction / Improvement of Road Basroop to Ghumawan. 3). Phamba to HassanBhai.-(B) / / Roads 120.000 0.000 0.000 22.000 12 View
4518 1749 251431 2026 Rehabilitation/Improvement of road from Nara Amazai to Bait Gali.-(B) / / Roads 80.000 0.000 0.000 15.000 13 View
4519 1750 251457 2026 F/S and design for Construction of Express route (Dargai to Palai Motorway Inter Change)-(B) / / Roads 8.000 0.000 0.000 8.000 10 View
4520 1751 251475 2026 Access Roads to new Potential Tourist Sites at Malakand Division-(B) / / Roads 5000.000 0.000 0.000 88.000 14 View
CWD