Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
4261 2106 251585 2026 Construction of Black Topped Road from Toormandi to Spinkai Raghzai via Changhmalai (38 Km), District South Waziristan Upper-(A) /PDWP /24-10-2025 Roads 56.000 0.000 0.000 10.000 16 View
4262 2107 250335 2026 F/S and Construction of BTR Asona pewa Kheil TSD Tank (5Km).-(B) / / Roads 300.000 0.000 0.000 30.000 11 View
4263 2108 250996 2026 Construction of Black Top Road in Bajaur (40 KM)-(B) / / Roads 500.000 0.000 0.000 40.000 14 View
4264 2109 251399 2026 Construction, Improvement, Rehabilitation & Widening of BT Roads in District South Waziristan Lower, South Waziristan Upper & North Waziristan, TSD (DI Khan, Bannu, Tank, Lakki Marwat).-(B) / / Roads 2200.000 0.000 0.000 80.000 9 View
4265 2110 251435 2026 Rehabilitation of existing roads in SW Upper.-(B) / / Roads 500.000 0.000 0.000 25.000 18 View
4266 2111 251437 2026 F/S for Extension /Construction of Zalai - Khankot-Gulkach road 20-KMs SWD Lower.-(B) / / Roads 5.000 0.000 0.000 5.000 12 View
4267 2112 251583 2026 Construction of Black Topped Road from Smal to Ghundakal Saruna via Pangay (14 Km), including cost of dislocated machinery, District South Waziristan Upper-(B) / / Roads 1300.000 0.000 0.000 50.000 15 View
4268 2113 260378 2026 Restoration of Flood Damages in District North Waziristan (i) Rehabilitation of Boya Bridge, Tehsil Boya District North Waziristan (ii) Rehabilitation of Hassu Khel Bridge, Tehsil Mirali District North Waziristan-(B) / / Roads 210.400 0.000 0.000 20.000 18 View
4269 2114 260411 2026 Construction of Marai to Kuriz road 10-Kms District Orakzai.-(B) / / Roads 500.000 0.000 0.000 30.000 17 View
4270 2115 260412 2026 Construction of Road from Kachai to Chappar Mishti 15 Km District Orakzai.-(B) / / Roads 900.000 0.000 0.000 30.000 10 View
CWD