Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3841 1325 250965 2025 Construction of Gabin Jabba to Sedgai Dand Road (08-KM) in District Swat.-(B) / / Roads 400.000 0.000 0.000 10.000 2 View
3842 1326 250966 2025 F/S and design for Construction of indus Highway to Bannu Gate Chowki Road (Daul carrage way) 7.5 KMs-(B) / / Roads 5.000 0.000 0.000 5.000 2 View
3843 1327 250969 2025 F/S and design for Construction of Indus Highway to Surgul via Kamardand Road 14-KMs-(B) / / Roads 8.000 0.000 0.000 8.000 2 View
3844 1328 250972 2025 F/S and design for Construction, Widening & Black Topping of 21-Kms roads in Sonai Dara, Hayagy, & Khair Dara in District Dir Upper-(B) / / Roads 8.000 0.000 0.000 8.000 2 View
3845 1329 250974 2025 Construction of Durru Sheringal to Ganshal Road 7-Kms, Dir Upper-(B) / / Roads 280.000 0.000 0.000 5.000 2 View
3846 1330 250976 2025 F/S and design of Road from Shomai Usherai to Swat (Tehsil Larjam) 15 Km-(B) / / Roads 8.000 0.000 0.000 8.000 2 View
3847 1331 250979 2025 F/S and design for Black Topping of Road Kanai to Kandaw (13KM)-(B) / / Roads 7.000 0.000 0.000 7.000 2 View
3848 1332 250980 2025 F/S and design of Road from Rodh (Tehsil Wari) to Swat 15 Km -(B) / / Roads 8.000 0.000 0.000 8.000 2 View
3849 1333 250982 2025 Rehabilitation/Improvement of Chattar Kuzabanda Road -(B) / / Roads 416.000 0.000 0.000 20.000 2 View
3850 1334 250983 2025 F/S and design of Barawal to Kalpani Top Road (13 Km) -(B) / / Roads 8.000 0.000 0.000 8.000 2 View
CWD