Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3471 2017 180600 2018 F/S, Design and Reconstruction of RCC Bridges i) Pir Bala on KM-7, Peshawar, ii) Kanawer Bridge on Charsadda Tangi Road, iii) Elai Bridge on S-10 at Buner and iv) Bridge on Haripur-Beer Section S-12 (Length-160m)-(A) /PDWP /22-05-2019 Roads 668.596 0.000 0.000 10.000 177 View
3472 2059 180615 2018 Construction of Roads & Bridges on need Basis-(A) /PDWP /22-10-2020 Roads 3147.320 0.000 0.000 0.001 150 View
3473 2018 180622 2018 Feasibility studies of Oughday (Takhta Band) to Kabal Bridge & Ningolai to Allah Abad Bridge, Swat.-(A) /DDWP /28-12-2018 Roads 12.400 0.000 0.000 1.000 155 View
3474 1696 240448 2024 Construction of road Qullalai Killy - Gulono vill (4 Km)-(B) / / Roads 200.000 0.000 0.000 20.000 19 View
3475 1698 240450 2024 Construction of Mittai Valley Road till Arzano (6 Km)-(B) / / Roads 300.000 0.000 0.000 20.000 19 View
3476 1532 191707 2025 160487-Construction of Road Connecting from Bagh Adam Khel Tribe (Tirah Maidan, Khyber Agency [MA]-(A) /PDWP /17-09-2019 Roads 246.080 198.797 0.000 47.283 3 View
3477 1533 191709 2025 170140-Construction & Black Topping of Roads in Orakzai Agency. [MA]-(A) /FDWP /10-10-2017 Roads 133.027 132.027 0.000 1.000 2 View
3478 1534 191711 2025 170142- Rehabilitation of Road in Lower Sub Division of District Orakzai. (5 kms) [MA]-(A) /DDWP /28-03-2019 Roads 48.679 16.937 0.000 31.742 2 View
3479 1535 191713 2025 140332-Construction of Road from Shahoor to Toormandi via Pastai Khawazai 10 Kms in SWA. (Umbrella) [MA]-(A) /FDWP /31-05-2016 Roads 190.085 182.232 0.000 7.853 2 View
3480 1536 191722 2025 170248-Construction of BT Roads in Sub-Division Tank. [MA]-(A) /PDWP /26-12-2024 Roads 967.944 368.271 0.000 100.000 2 View
CWD