Report Date:
November 11, 2025
Infrastructure Type:
Road
Total Damages:
49
Reported by:
Engr. Sohail Idrees
(Managing Director PKHA)
Muhammad Zahid
(XEN H/W HARIPUR)
Affected Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages Overview
| S# | Road Name & Location | Total Length | Status | Damaged Length | Damage Coordinates | Date Reported |
|---|---|---|---|---|---|---|
|
1
|
Haripur - Torghar Road Section of P-H/Way (S-19)
|
24.700
(KM) |
Partially restored |
0.358
(KM) |
Sep 26, 2025
01:35 PM |
|
|
Remarks:
Road is open to traffic on one lane in critical sections, but the restoratation works must be commenced immediately to avoid further damge to road infrastructure and road closure.
Reported by:
Managing Director PKHA
|
||||||
|
2
|
Kohala Pir Sohawa Road S-5-C
|
20
(KM) |
Partially restored |
0.035
(KM) |
| |