Haripur Damages Detail - Monsoon (2026)

Reported by:
Engr. Sohail Idrees (Managing Director PKHA)
1
Damaged Roads
2
Total Damages
0.043
Damaged Length (KM)
0
Fully Restored
0
Partially Restored
2
Not Restored
Road Damages Overview
S# Road Name & Location Total Length Status Damaged Length Damage Coordinates Date Reported
1
Kohala Pir Sohawa Road S-5-C 2
20
(KM)
1 Not restored 0.008
(KM)
Start: 33.827350, 73.126070 View
End: 33.827040, 73.126905 View
Aug 05, 2026
01:45 PM
Remarks: The work order for repair work has been awarded, and the contractor is expected to mobilize shortly. Meanwhile, the road is currently fully operational and open to traffic
Reported by: Managing Director PKHA
2 Not restored 0.035
(KM)
Start: 33.792100, 73.120260 View
End: 33.791800, 73.120200 View
Aug 05, 2026
01:39 PM
Remarks: The work order for repair work has been awarded, and the contractor is expected to mobilize shortly. Meanwhile, the road is currently fully operational and open to traffic.
Reported by: Managing Director PKHA