Report Date:
August 23, 2026
Infrastructure Type:
Road
Total Damages:
1
Reported by:
Engr. Sohail Idrees
(Managing Director PKHA)
Damaged Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages Overview
| S# | Road Name & Location | Total Length | Status | Damaged Length | Damage Coordinates | Date Reported |
|---|---|---|---|---|---|---|
|
1
|
Utmanzai Bypass, Utmanzai
|
6
(KM) |
Not restored |
0.02
(KM) |
Aug 05, 2026
01:52 PM |
|
|
Remarks:
Due to torrential rains and flood from nearby nullah, storm water caused this incident. Road is through for traffic at the moment.
Reported by:
Managing Director PKHA
|
||||||