Mir Ali Causeway
Partially restoredThis activity provides a detailed overview of the operational status of the Culvert Mir Ali Causeway, recorded on 21 August, 2026. The affected site is situated within the Swabi district, operating under the administrative jurisdiction of XEN SWABI-II. The infrastructure has been primarily affected by Retaining Wall, Embankment Damages, Bed damaged, Erosion, Accumulation of boulders, encompassing a total span of 8 Meters.
Restoration and clearance efforts were facilitated by the deployment of work will be executed through contractor (x1) . In a formal assessment of the situation, the reporting officer noted with remarks: Mir Ali Causeway Downstream appron and side wall damaged.
The affected area has been mapped using geographic coordinates. The section starts at 72.347700, 34.271200 and ends at 72.354700, 34.281400. For location reference and navigation, view the route on Google Maps.
The road is now partially accessible; however, motorists are advised to proceed with caution as restoration work continues to achieve full safety and normal traffic flow.
The following photographs provide a visual record of the site conditions before and after the activity, illustrating the extent of the affected area and the improvements achieved through the executed operations.