Malkan Bridge
Not restoredThis activity provides a detailed overview of the operational status of the Bridge Malkan Bridge, recorded on 1 August, 2026. The affected site is situated within the Abbottabad district, operating under the administrative jurisdiction of XEN H/W ABBOTTABAD. The infrastructure has been primarily affected by Structure work & Approach, Bed damaged, Piles, encompassing a total span of 150 Meters.
Restoration and clearance efforts were facilitated by the deployment of Excavator (x1) . In a formal assessment of the situation, the reporting officer noted with remarks: Cut off wall is required to reduce the scouring as pile caps has been exposed..
The affected area has been mapped using geographic coordinates. The section starts at 73.195191, 34.067537 and ends at 73.195191, 34.067537. For location reference and navigation, view the route on Google Maps.
Comprehensive efforts are currently underway to arrange additional resources and manpower to ensure that the road is restored to a safe and usable condition as soon as possible.
The following photographs provide a visual record of the site conditions before and after the activity, illustrating the extent of the affected area and the improvements achieved through the executed operations.