Utmanzai Bypass, Utmanzai
Not restoredThis activity provides a detailed overview of the operational status of the Road Utmanzai Bypass, Utmanzai, recorded on 20 July, 2026. The affected site is situated within the Charsadda district, operating under the administrative jurisdiction of Managing Director PKHA. The infrastructure has been primarily affected by Retaining Wall, Embankment Damages, Shoulders, encompassing a total span of 0.02 Kilometers.
In a formal assessment of the situation, the reporting officer noted with remarks: Due to torrential rains and flood from nearby nullah, storm water caused this incident. Road is through for traffic at the moment..
The affected area has been mapped using geographic coordinates. The section starts at 71.765610, 34.205984 and ends at 71.765610, 34.205984. For location reference and navigation, view the route on Google Maps.
Comprehensive efforts are currently underway to arrange additional resources and manpower to ensure that the road is restored to a safe and usable condition as soon as possible.
The following photographs provide a visual record of the site conditions before and after the activity, illustrating the extent of the affected area and the improvements achieved through the executed operations.