23 July, 2026 Haripur Managing Director PKHA

This activity provides a detailed overview of the operational status of the Road Kohala Pir Sohawa Road S-5-C, recorded on 23 July, 2026. The affected site is situated within the Haripur district, operating under the administrative jurisdiction of Managing Director PKHA. The infrastructure has been primarily affected by Retaining Wall, encompassing a total span of 0.008 Kilometers.

In a formal assessment of the situation, the reporting officer noted with remarks: The work order for repair work has been awarded, and the contractor is expected to mobilize shortly. Meanwhile, the road is currently fully operational and open to traffic.

The affected area has been mapped using geographic coordinates. The section starts at 73.126070, 33.827350 and ends at 73.126905, 33.827040. For location reference and navigation, view the route on Google Maps.

Comprehensive efforts are currently underway to arrange additional resources and manpower to ensure that the road is restored to a safe and usable condition as soon as possible.

The following photographs provide a visual record of the site conditions before and after the activity, illustrating the extent of the affected area and the improvements achieved through the executed operations.

Before Images (1)
CWD