Qala road kalam

Qala road kalam

Fully restored
23 January, 2026 Swat XEN Swat II Matta

This activity report pertains to Road and was recorded on 23 January, 2026. The activity occurred in Swat under the jurisdiction of XEN Swat II Matta. The nature of the damage is described as Snow Clearance with a damaged length of 1.5 meters.

The average snow recorded at the site was 3.00 inches.

The approximate cost for restoration is estimated at Rs. 0.28 Million. The approximate rehabilitation cost is estimated at Rs. 0.00 Million.

The machinery used for this activity was Tractor with a total operating time of 40 hours .

Remarks: cleared

Before Images (1)
After Images (1)