Main Qalagay Road

Main Qalagay Road

Partially restored
23 January, 2026 Swat XEN Swat I Saidu Sharif

This activity report pertains to Road and was recorded on 23 January, 2026. The activity occurred in Swat under the jurisdiction of XEN Swat I Saidu Sharif. The nature of the damage is described as Snow Clearance, Accumulation of boulders with a damaged length of 2 meters.

The average snow recorded at the site was 1.00 inches.

The approximate cost for restoration is estimated at Rs. 0.12 Million. The approximate rehabilitation cost is estimated at Rs. 0.12 Million.

The machinery used for this activity was Tractor with a total operating time of 4 hours .

Before Images (1)
After Images (1)