Balokhan Main Road Maidan

Balokhan Main Road Maidan

Not restored
23 January, 2026 Dir Lower XEN H/W DIR LOWER

This activity report pertains to Road and was recorded on 23 January, 2026. The activity occurred in Dir Lower under the jurisdiction of XEN H/W DIR LOWER. The nature of the damage is described as Snow Clearance, Land Sliding, Debris Deposition, Slips with a damaged length of 4 meters.

The average snow recorded at the site was 2.00 inches.

The approximate cost for restoration is estimated at Rs. 0.50 Million. The approximate rehabilitation cost is estimated at Rs. 3.00 Million.

The machinery used for this activity was Tractor with a total operating time of 12 hours .

Before Images (1)
After Images (1)
CWD