Luqman Banda to Sheenghar Road
Not restoredThis activity report pertains to Road and was recorded on 23 January, 2026. The activity occurred in Dir Lower under the jurisdiction of XEN H/W DIR LOWER. The nature of the damage is described as Snow Clearance, Land Sliding with a damaged length of 5 meters.
The average snow recorded at the site was 3.00 inches.
The approximate cost for restoration is estimated at Rs. 0.50 Million. The approximate rehabilitation cost is estimated at Rs. 5.00 Million.