Stories
Loading...

South Waziristan Lower Damages Detail - Monsoon (2025)

Report Date: July 27, 2025 Infrastructure Type: Road Total Damages: 1
Reported by:
Ikram Ullah (XEN South Waziristan (L))
1
Affected Roads
1
Total Damages
3
Damaged Length (KM)
1
Fully Restored
0
Partially Restored
0
Not Restored
Road Damages
S# Road Name Total Length Status Damaged Length Dated
1 Tank Wana Road Via Gomal Zam Dam 100 (KM) Fully restored 3 (KM) Jul 11, 2025
Remarks: Retaining walls at various location are completely damaged. 500 m road sliding occur. 2500 m length road was blocked due sliding
Reported by: XEN South Waziristan (L)
CWD