Kurram Detail Monsoon (2025)

Report Date: July 06, 2025 Infrastructure Type: Road Total Damages: 6
5
Affected Infrastructures
6
Total Damages
2.97
Damaged Length (KM)
1
Fully Restored
4
Partially Restored
1
Not Restored
44.6 M
Total Cost (PKR)
Reporting Officers
Executive Engineer
XEN KURRAM LOWER
6 damage(s) reported
Infrastructure Damages
S# Road Name Type Total Length Status Damaged Length Restoration Cost Rehabilitation Cost Date Reported
1 Komasa to Arwaza Road Road 25 (KM) Partially restored 1.200 (KM) 2.00 M 2.00 M Jul 01, 2025
Remarks: Land slides. slips and R/wall damaged
2 Taby Khani Khel Main Road central kurram Road 12 (KM) Partially restored 0.800 (KM) 1.00 M 1.00 M Jul 01, 2025
Remarks: Land slided to the road and road was clear for the traffic on emergency basis
3 Sadda By-Pass Road Road 23.00 (KM) Fully restored 0.300 (KM) 7.00 M 7.00 M Jun 29, 2025
Remarks: R/Wall to be needed for the damaged portion and also Drain to be construct for the best flow of water from the road
4 Sadda Dogar Road (2 Damages) Road 28.00 (KM) Partially restored 0.060 (KM) 4.00 M 4.00 M Jun 29, 2025
Remarks: 200 ft R/Wall is fully damaged which needs to be urgent restoration
Partially restored 0.010 (KM) 0.30 M 0.30 M Jun 29, 2025
Remarks: Land slide and road is currently clrared for the trafic flow
5 Kemal Baza Road Central Kurram Road 05 (KM) Not restored 0.600 (KM) 10.00 M 6.00 M Jun 29, 2025
Remarks: The road is satiauted in central kurram and badly damaged in several parts icluding land slide , fall of R/Wall and shigle road washed away
CWD