Report Date:
July 27, 2025
Infrastructure Type:
Road
Total Damages:
20
Reported by:
Engr. Sohail Idrees
(Managing Director PKHA)
,
Najm Ud Din
(XEN DIR UPPER)
Affected Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages
S# | Road Name | Total Length | Status | Damaged Length | Dated |
---|---|---|---|---|---|
1 | Chukyatan Patrak S-16 (2 Damages) | 34 (KM) | 1 Fully restored | 0.7 (KM) | Jul 15, 2025 |
Remarks: Fully Restored through available contractor
Reported by:
Managing Director PKHA
|
|||||
2 Partially restored | 0.2 (KM) | Jul 06, 2025 | |||
Remarks: Slips and debris have been removed from road surface..Retaining walls previously damage in moon soon,has worsen which requires restoration
Reported by:
Managing Director PKHA
|
|||||
2 | Patrak kumrat Road (Non-P) (2 Damages) | 44 (KM) | 1 Fully restored | 0.200 (KM) | Jul 15, 2025 |
Remarks: Fully Restored through available contractor
Reported by:
Managing Director PKHA
|
|||||
2 Partially restored | 4.5 (KM) | Jul 06, 2025 | |||
Remarks: 01 culvert damage at km 28.from thall to kumrat is jeepable road.some reaches has been submerged in water when water level rises. the road section is part of the ADP scheme construction of road from Patrak to Thall kumrat 44 km district dir upper.The amount mentioned is the tentative cost for the flood damage portion
Reported by:
Managing Director PKHA
|
|||||
3 | Nihagdara Salobag Road | 7 (KM) | Partially restored | .012 (KM) | Jul 14, 2025 |
4 | Nihag Dara Phase II Road (3 Damages) | 20 (KM) | 1 Partially restored | .01 (KM) | Jul 14, 2025 |
2 Partially restored | .02 (KM) | Jul 08, 2025 | |||
3 Partially restored | 15 (KM) | Jul 07, 2025 | |||
5 | karo Dara main Pashta Balkore Road | 15 (KM) | Partially restored | 7 (KM) | Jul 14, 2025 |
6 | kakad Tangi Road Wari | 7 (KM) | Partially restored | 3 (KM) | Jul 10, 2025 |
7 | Nihagdara Bandai dolar Road Wari | 6 (KM) | Partially restored | 3 (KM) | Jul 10, 2025 |
8 | Wari Manzi road | 5 (KM) | Partially restored | 2 (KM) | Jul 09, 2025 |
9 | Gal pashta Road wari | 5 (KM) | Partially restored | 3 (KM) | Jul 09, 2025 |
10 | karo dara gulibagh karkabanj raod wari | 15 (KM) | Partially restored | 8 (KM) | Jul 09, 2025 |
11 | Daskor Badali Maskari Road Wari | 12 (KM) | Partially restored | 10 (KM) | Jul 08, 2025 |
12 | Matar Shawkand Road (2 Damages) | 8 (KM) | 1 Partially restored | 8 (KM) | Jul 07, 2025 |
2 Partially restored | 6 (KM) | Jul 07, 2025 | |||
13 | Osuri Dara Main Road | 10 (KM) | Partially restored | 5 (KM) | Jul 07, 2025 |
14 | Nihag Dara Phase I Road | 27 (KM) | Partially restored | 20 (KM) | Jul 07, 2025 |
15 | Gwaldai Dara main Road at Pingass | 0.2 (KM) | Partially restored | 0.2 (KM) | Jul 02, 2025 |
Remarks: About 200 meters road portion has been washedaway by recent flood which is temporary restored for light traffic need urgent rehabilitation
Reported by:
XEN DIR UPPER
|