Chitral Lower Damages Detail - Monsoon (2025)

Report Date: July 27, 2025 Infrastructure Type: Road Total Damages: 1
Reported by:
Muhammad Adnan (XEN LOWER CHITRAL)
1
Affected Roads
1
Total Damages
0.2
Damaged Length (KM)
0
Fully Restored
1
Partially Restored
0
Not Restored
Road Damages
S# Road Name Total Length Status Damaged Length Dated
1 Faizabad Hone road, Shiaqotak, Doomshor Orguch road 7 (KM) Partially restored 0.20 (KM) Jun 30, 2025
Remarks: Due to high flood level, the said retaining wall was damaged which was restored immediately. However rehabilitation of the retaining wall is required
Reported by: XEN LOWER CHITRAL