Report Date: July 06, 2025
Infrastructure Type: Road
Total Damages: 1
1
Affected Infrastructures
1
Total Damages
0.015
Damaged Length (KM)
0
Fully Restored
1
Partially Restored
0
Not Restored
1.3 M
Total Cost (PKR)
Reporting Officers
Executive Engineer
XEN LOWER CHITRAL
1 damage(s) reported
Infrastructure Damages
S# | Road Name | Type | Total Length | Status | Damaged Length | Restoration Cost | Rehabilitation Cost | Date Reported |
---|---|---|---|---|---|---|---|---|
1 | Faizabad Hone road, Shiaqotak, Doomshor Orguch road | Road | 7 (KM) | Partially restored | 0.015 (KM) | 0.30 M | 1.00 M | Jun 30, 2025 |
Remarks: Due to high flood level, the said retaining wall was damaged which was restored immediately. However rehabilitation of the retaining wall is required |