Chitral Lower Detail Monsoon (2025)

Report Date: July 06, 2025 Infrastructure Type: Road Total Damages: 1
1
Affected Infrastructures
1
Total Damages
0.015
Damaged Length (KM)
0
Fully Restored
1
Partially Restored
0
Not Restored
1.3 M
Total Cost (PKR)
Reporting Officers
Executive Engineer
XEN LOWER CHITRAL
1 damage(s) reported
Infrastructure Damages
S# Road Name Type Total Length Status Damaged Length Restoration Cost Rehabilitation Cost Date Reported
1 Faizabad Hone road, Shiaqotak, Doomshor Orguch road Road 7 (KM) Partially restored 0.015 (KM) 0.30 M 1.00 M Jun 30, 2025
Remarks: Due to high flood level, the said retaining wall was damaged which was restored immediately. However rehabilitation of the retaining wall is required
CWD