Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3851 1326 250966 2025 F/S and design for Construction of indus Highway to Bannu Gate Chowki Road (Daul carrage way) 7.5 KMs-(B) / / Roads 5.000 0.000 0.000 5.000 46 View
3852 1327 250969 2025 F/S and design for Construction of Indus Highway to Surgul via Kamardand Road 14-KMs-(B) / / Roads 8.000 0.000 0.000 8.000 46 View
3853 1328 250972 2025 F/S and design for Construction, Widening & Black Topping of 21-Kms roads in Sonai Dara, Hayagy, & Khair Dara in District Dir Upper-(B) / / Roads 8.000 0.000 0.000 8.000 55 View
3854 1329 250974 2025 Construction of Durru Sheringal to Ganshal Road 7-Kms, Dir Upper-(B) / / Roads 280.000 0.000 0.000 5.000 48 View
3855 1330 250976 2025 F/S and design of Road from Shomai Usherai to Swat (Tehsil Larjam) 15 Km-(B) / / Roads 8.000 0.000 0.000 8.000 55 View
3856 1331 250979 2025 F/S and design for Black Topping of Road Kanai to Kandaw (13KM)-(B) / / Roads 7.000 0.000 0.000 7.000 49 View
3857 1332 250980 2025 F/S and design of Road from Rodh (Tehsil Wari) to Swat 15 Km -(B) / / Roads 8.000 0.000 0.000 8.000 49 View
3858 1333 250982 2025 Rehabilitation/Improvement of Chattar Kuzabanda Road -(B) / / Roads 416.000 0.000 0.000 20.000 47 View
3859 1334 250983 2025 F/S and design of Barawal to Kalpani Top Road (13 Km) -(B) / / Roads 8.000 0.000 0.000 8.000 46 View
3860 1335 250985 2025 F/S and design for Rehabilitation/Improvement Battagram Shumlai Road-(B) / / Roads 5.000 0.000 0.000 5.000 49 View
CWD