Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3591 1638 251518 2025 F/S for Construction Of 10KM Black Top Road From Bakhta Abad To Imran Khel Pewasar Ping Area TSD Jandola District Tank.-(B) / / Roads 5.000 0.000 0.000 1.000 49 View
3592 1639 251529 2025 Construction of Main Zarmilana Road to Haji Gul Suleman Khel Korona (7-KM)-(B) / / Roads 350.000 0.000 0.000 70.000 69 View
3593 1640 251566 2025 F/S for Construction of 5 KM Black Top Road from Rizwan Dani Khel Korona to Khaleem Malak khel Lower Waziristan-(B) / / Roads 5.000 0.000 0.000 0.001 47 View
3594 1641 251572 2025 Construction of BTR from main maintoy market to Abid ullah Kot SWTD (Lower)-(B) / / Roads 200.000 0.000 0.000 0.001 44 View
3595 1642 251576 2025 D-Chock Nermuhammad Road to Ser Doog Kurm Ghari 15 KM Tehsil Mirali North Wazirstan-(B) / / Roads 350.000 0.000 0.000 0.001 47 View
3596 1643 251577 2025 Construction / Rehabilitation of Road from Rescue 1122 Center Chappari to Musa Khel via Mateen Khel Killa Sub Division Wazir Bannu (10 KM).-(B) / / Roads 250.000 0.000 0.000 0.001 47 View
3597 1644 251580 2025 Construction of 5 km Main Wana bypass bamrai to mati kaka chowk South Waziristan Lower-(B) / / Roads 320.000 0.000 0.000 0.001 48 View
3598 1645 251583 2025 Construction of Black Topped Road from Smal to Ghundakal Saruna via Pangay (14 Km), including cost of dislocated machinery, District South Waziristan Upper-(B) / / Roads 1300.000 0.000 0.000 0.001 45 View
3599 1646 251584 2025 Construction and Black Topping of Road from Sam Masap Mella Dara Malik Shahi Area via Mashta (45 Km), connecting Asman Manza, District South Waziristan Upper-(B) / / Roads 2860.000 0.000 0.000 0.001 57 View
3600 1647 251585 2025 Construction of Black Topped Road from Toormandi to Spinkai Raghzai via Changhmalai (38 Km), District South Waziristan Upper-(B) / / Roads 2800.000 0.000 0.000 0.001 58 View
CWD