S.No | ADP Number | Scheme Code | Year | Scheme Name | Sector Name | Local Cost | Previous Expenditure | Revenue Allocation | Total Allocation | Views | Detail |
---|---|---|---|---|---|---|---|---|---|---|---|
3561 | 1608 | 251043 | 2025 | Construction of BTR from Main N-50 Road to Soughat Domanch Road TS Darazinda-(B) / / | Roads | 101.000 | 0.000 | 0.000 | 50.000 | 49 | View |
3562 | 1609 | 251044 | 2025 | Construction of BTR from Ameer Hamza to Shamaz Khel Kalay Darazinda Sub Division-(B) / / | Roads | 279.000 | 0.000 | 0.000 | 50.000 | 51 | View |
3563 | 1610 | 251109 | 2025 | F/S and design for Improvement and Widening of Road form Fortslop Road from Kohi College to Musharaf kali via Hashim kali area (5-kms)-(B) / / | Roads | 4.000 | 0.000 | 0.000 | 4.000 | 51 | View |
3564 | 1611 | 251113 | 2025 | F/S and design for IMPROVEMENT, WIDENING AND BLACKTOPPING OF ROAD ATTARI CHOWK TO BAZGARAH KAMAR KHEL, DISTRICT KHYBER (5.5-KMS)-(B) / / | Roads | 4.000 | 0.000 | 0.000 | 4.000 | 51 | View |
3565 | 1612 | 251124 | 2025 | F/S and design for IMPROVEMENT, WIDENING AND BLACKTOPPING OF ROAD SAM GHAKHI BQK TO KOHI CHOWK MDK, DISTRICT KHYBER (4.3-KMS)-(B) / / | Roads | 3.000 | 0.000 | 0.000 | 3.000 | 57 | View |
3566 | 1613 | 251130 | 2025 | F/S for construction of Road from Babi Khel Kandaw to River Kabal-(B) / / | Roads | 8.000 | 0.000 | 0.000 | 8.000 | 53 | View |
3567 | 1614 | 251132 | 2025 | F/S for Construction of Road from Ghazi Baig to Zanawar Cheena Khwaizai-(B) / / | Roads | 5.000 | 0.000 | 0.000 | 5.000 | 51 | View |
3568 | 1615 | 251133 | 2025 | F/S for construction of Road from Main Bajaur Road to Dre Sre Safi-(B) / / | Roads | 5.000 | 0.000 | 0.000 | 5.000 | 53 | View |
3569 | 1616 | 251134 | 2025 | Construction of BTR from Main Bedmanai to Yara Khel Baizai in District Mohmand-(B) / / | Roads | 240.000 | 0.000 | 0.000 | 5.000 | 49 | View |
3570 | 1617 | 251135 | 2025 | F/S for Construction and BT of Road from Khakh Bazar to Karer Safi-(B) / / | Roads | 5.000 | 0.000 | 0.000 | 0.001 | 58 | View |