News & Events

  1. Engr. Zahid Arif assumed charge as Secretary C&W on 24-06-2011.
  2. Inspection of Nowshera roads by Chief Engineer (Centre) is scheduled on 07-09-2011.
  3. AA of the schemes discussed in the DDWP meeting held on 24-08-2011 issued.
  4. Review of ADP schemes will be starting from 21-08-2011 under the Chairmanship of Director (P&M).
  5. Engr. Farooq Azam Chief CDO issued letter to all XEN offices to submit Road Inventory data by 26-08-2011.
  6. Data Entry started in MIS Modules.
  7. Digitization of remaining Districts started.

Roads

ADP No.
District
Scheme Name
Cost
(Million)
240
Mardan
90078-Improvement & Widening of Paar Hoti-Garhi Kapoora-Dhobian-Yar Hussain road District Mardan.
546.856
245
Mardan
100057-F/S, Construction of Link Road from Motorway Wali Interchange to Toru.
404.85
249
Charsadda
100415-Widening & Rehabilitation of road from Shabqadar-Battagram Adda to village Kharakai (8 Kms).
247.83
258
Provincial
110544-Upgradation/Rehabilitation of Road from Chakdara to Madian on the Right Bank of River Swat  SH: (1) Sharif Abad to Kanjo Swat (10.5 Kms) (MDTF Assisted).
680.33
263
Peshawar
120282-Improvement and Widening of Road from Mufti Mehmood Flyover upon Budni Bridge on Povincial Highway S-I including Reconstruction of Old Budni Bridge.
0
267
Peshawar
120292-Widening & Improvement of Road from Chughalpura Road Interchange to Pir Abdul Latif Zakori Flyover on GT Road (N-5) (2.250 Km).
0
272
Nowshera
31234-Construction of bridge at Pir Sabak, Nowshera.
104.845
275
Chitral
70210-Construction of Khan Abdul Wali Khan By-pass road District Chitral.
542.665
277
Malakand
70759-Reconstruction of road alongwith bridge approach road Batkhela to Badwan (4.5-Kms) Malakand.
489.087
281
Nowshera
90069-Improvement & Widening of Pabbi Cherat Road, District Nowshera.
331.609
283
Mardan
90471-Repair, rehabilitation and improvement of Mardan Bakhshali road, Mardan.
242.831
289
Mansehra
100055-Rehabilitation of Saiful Malook Road (8.55 Km) District Mansehra.
91.995
290
Swabi
100058-Development works under Swabi Package.
612.813
295
Mardan
110648-Improvement & Rehabilitation of Mardan Katlang Road from Km 15 to Km 21 Mardan
174.031
297
Mardan
120266-Construction and Black Topping of road from Zoor Mandi to Khana Bridge including 50 m span RCC Bridge (3.50 Kms) PK-25 Distt Mardan.
122.443
298
Abbottabad
120267-Reh/Imp of Abbottabad Thandiani Road (length 25 Kms) Distt Abbottabad
25.786
299
Nowshera
120839-Imporvement and Black Topping of road from GT Road to Misri Banda Nowshera.
29.439
300
Bannu
120876-Construction of Box Culverts at Maryan Jani Khel Road Near Mali Khelk PK-72 District Bannu.
5.532
314
Abbottabad
110256-Restoration of Road damaged by flood in District Abbottabad (Phase-I).
126.161
315
Abbottabad
110257-Restoration of Road damaged by flood in District Abbottabad (Phase-II).
54.15
316
Abbottabad
110279-Rehabilitation/Repair of Pind Gali Beer Road District Abbottabad.
90.399
317
Abbottabad
110284-Rehabilitation/Repair of Roads Damaged in July 2010 in NA-18, District Abbottabad.
52.149
318
Abbottabad
110286-Rehabilitation/Repair of Roads damaged in PF-46 District Abbottabad.
123.253
320
Battagram
110289-Rehabilitation of Road damaged by flood in District Battagram (Package-II).
117.505
322
Lakki Marwat
110317-Restoration of Road damaged by flood in District Lakki Marwat
85.467
327
Swat
110378-Flood Damages Restoration of Roads/Bridges Infrasturcture in District Swat SH: (1) Kalam, Uthror, Gubral road (35-Kms) (2) Kalam, Ushu, Matilthatn, Mahodand road (35-Kms) (3) Tehsil Kalam Internal Roads (6-Kms).
107.6