Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 7.421 | 7.421 | 7.421 | 3.999 | 24.299 | 10.129 | 73% |
64% December - 2018 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 0 | 0 | 0 | 0 | 20.3 | 17.55 | - |
54% November - 2018 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 0 | 0 | 0 | 0 | 20.3 | 17.55 | - |
54% November - 2018 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
170169-Construction of Tehsil Building Haripur, Shabqadar, Charsadda and Bakka Khel, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 136.452 | 0 | 0 | 0 | 0 | 0 | 0 | 136.452 | - |
- September - 2018 |
Work order issued on 16/03/2018. Mutation of land/handing over of site under process. |
No Image |
Bannu | |||||||||||||||||||
65 (OG) |
170169-Construction of Tehsil Building Haripur, Shabqadar, Charsadda and Bakka Khel, Bannu. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 136.452 | 0 | 0 | 0 | 0 | 0 | 0 | 136.452 | - |
- July - 2018 |
Work order issued on 16/03/2018. Mutation of land/handing over of site under process. |
No Image |
Bannu | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 7.421 | 7.421 | 7.421 | 7.421 | 27.721 | 10.129 | 73% |
73% April - 2019 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 7.421 | 7.421 | 7.421 | 7.421 | 27.721 | 10.129 | 73% |
73% March - 2019 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 7.421 | 7.421 | 7.421 | 7.421 | 27.721 | 10.129 | 73% |
73% March - 2019 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 7.421 | 7.421 | 7.421 | 7.421 | 27.721 | 10.129 | 73% |
73% February - 2019 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 37.85 | 20.3 | 7.421 | 7.421 | 7.421 | 7.421 | 27.721 | 10.129 | 73% |
73% January - 2019 |
GF - flooring completed. FF - finishing stage. |
No Image |
Bannu (construction of new mohafiz khana/record rooms) | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
2 Nos Patwar Khanas identified. PC-I/DCE under preparation on MRS-2017. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.929 m on MRS-2016 submitted to SPO BOR on 02/05/2016. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.929 m on MRS-2016 submitted to SPO BOR on 02/05/2016. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.929 m on MRS-2016 submitted to SPO BOR on 02/05/2016. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
2 Nos Patwar Khanas identified. PC-I/DCE under preparation on MRS-2017. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.929 m on MRS-2016 submitted to SPO BOR on 02/05/2016. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.286 m on MRS-2017 submitted to DC on 26/03/2018. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.286 m on MRS-2017 submitted to DC on 26/03/2018. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.286 m on MRS-2017 submitted to DC on 26/03/2018. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
2 Nos Patwar Khanas identified. PC-I/DCE for Rs.10.286 m on MRS-2017 submitted to DC on 26/03/2018. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
2 Nos Patwar Khanas identified. PC-I/DCE under preparation on MRS-2017. |
No Image |
1) Tikri Mera
2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
2 Nos Patwar Khanas identified. PC-I/DCE under preparation on MRS-2017. |
No Image |
1) Tikri Mera 2) Shamlai | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Buner |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
Site not yet identified. |
No Image |
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
- | - | - | 02-11-15 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 36.281 | 28.023 | 0 | 0 | 0 | 0 | 28.023 | 8.258 | - |
77% December - 2018 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 36.281 | 28.023 | 0 | 0 | 0 | 0 | 28.023 | 8.258 | - |
77% November - 2018 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 36.281 | 28.023 | 0 | 0 | 0 | 0 | 28.023 | 8.258 | - |
77% November - 2018 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
170169-Construction of Tehsil Building Haripur, Shabqadar, Charsadda and Bakka Khel, Bannu. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.45 | 0 | 0 | 0 | 0 | 0 | 0 | 103.45 | - |
- September - 2018 |
Work order issued. Land acquisition under process. |
No Image |
Construction of Tehsil Building Shabqaddar, District Charsadda | |||||||||||||||||||
65 (OG) |
170169-Construction of Tehsil Building Haripur, Shabqadar, Charsadda and Bakka Khel, Bannu. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 103.45 | 0 | 0 | 0 | 0 | 0 | 0 | 103.45 | - |
- July - 2018 |
Work order issued. Land acquisition under process. |
No Image |
Construction of Tehsil Building Shabqaddar, District Charsadda | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
65 (OG) |
150311-Construction of new Mohafiz Khanas / Record Rooms on Need Basis. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 36.281 | 28.023 | 0 | 0 | 0 | 0 | 28.023 | 8.258 | - |
77% April - 2019 |
Completed & H/O. |
No Image |
Construction of Mohafiz Khana / Record Room in District Charsadda | |||||||||||||||||||
65 (OG) |
150289-Construction of 100 No Patwar Khanas in Khyber Pakhtunkhwa (Phase-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
PC-I/DCE submitted to SPO BOR on 21/03/2016. |
No Image |
1) Shabqadar PK-22
2) Maira Nisatta PK-17
3) Charsadda PK-17
4) Prang Safar Khel PK-17
5) Bari Band PK-20 | |||||||||||||||||||
Pages : 1 2 3 4 5 |