Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3721 1196 150961 2025 F/S,Des./const of road/street pav., Gara Jehangira, Jalsai Jagnat, Jalsai Dhok, Doba Lar, Zakria Khel, Batlasai Naray lar Ambar, Hayatabad Azim Garhi, Jehangira Mera Dhab, Lahor Gharbi, Nabi Beka, Mankai, Matani Changan Tordher, Ambar, Lahor Sharqi, Swabi-(A) /PDWP /15-09-2017 Roads 249.630 185.118 0.000 64.512 41 View
3722 1197 150965 2025 Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower.-(A) /PDWP /02-11-2015 Roads 275.308 221.937 0.000 53.371 44 View
3723 1198 150988 2025 Construction of RCC Bridges at Swausar Kasai, Gulibagh & Sromanzai Dir Upper.-(A) /PDWP /15-09-2017 Roads 157.708 82.268 0.000 75.440 45 View
3724 1199 151077 2025 Construction/ Reconstruction / Rehabilitation of road, UC Nar Jaffar, UC Kakki-I, UC Baharat, UC Kosar Fateh Khel, UC Mandan, UC Shamshi Khel & UC Mira Khel, District Bannu.-(A) /PDWP /30-05-2022 Roads 700.000 199.283 0.000 30.000 42 View
3725 1200 151078 2025 Construction/ Rehabilitation of road, UC Mira Khel, UC Kakki-II, UC Ismail Khel, UC Qalander, UC Khujare, UC Khujamad Mandan, UC Kala Khel and UC Shamsi Khel and Street Pavements along with Drain in UCs of PK-89, District Bannu.-(A) /PDWP /23-07-2020 Roads 600.000 308.409 0.000 30.000 50 View
3726 1201 160623 2025 F/S, Design & Construction of over head / Flyover and bridges in UC Gujrat UC Galyara UC Bakhshali in District Mardan-(A) /PDWP /01-12-2022 Roads 1975.619 1421.309 0.000 100.000 42 View
3727 1202 160626 2025 Feasibility Study, Design and Construction of Makhnial (Islamabad Boundary) to Changlagali via Dakhan Paisar (District Abbottabad)-(A) /PDWP /28-03-2017 Roads 1056.147 216.211 0.000 100.000 46 View
3728 1203 160628 2025 F/S, Design and Construction & Supervision of bypass road from Ayub Bridge Havellian (N-35) to Dhamtour at Abbotabad (18.325 Km)-(A) /PDWP /10-12-2019 Roads 3407.687 3283.923 0.000 30.000 44 View
3729 1204 160629 2025 F/S, Design and Construction of Link road from Shabqadar Naguman (PKHA) to Shabqadar Battagram road (PKHA) via Attakai upto Police Post Khairabad on Shabqadar Munda Head Work, Road, District Charsadda-(A) /PDWP /31-03-2021 Roads 511.584 318.991 0.000 40.000 42 View
3730 1205 170175 2025 F/S, Design and Construction / Improvement and BT of Thakot-Banna Road via Kar Kally Koz Cheena District Battagram-(A) /PDWP /28-06-2022 Roads 374.970 334.932 0.000 40.038 47 View
CWD