Stories
Loading...

Schemes

Reset
S.No ADP Number Scheme Code Year Scheme Name Sector Name Local Cost Previous Expenditure Revenue Allocation Total Allocation Views Detail
3521 1568 191824 2025 190259 - Construction of Black Topped Roads in Tribal District Orakzai. [MA]-(A) /PDWP /29-06-2020 Roads 116.015 69.927 0.000 46.088 53 View
3522 1569 191829 2025 190327 - Construction of 6-Kms Black Top Road from Dashka to Razin Haris Koroona Tehsil Makin District South Waziristan. [MA]-(A) /PDWP /01-12-2022 Roads 626.220 356.311 0.000 70.000 46 View
3523 1570 191830 2025 190351 - Construction of 6-Km B/T Road in District Khyber(CMD) [MA]-(A) /DDWP /08-11-2019 Roads 125.930 96.758 0.000 29.172 51 View
3524 1571 191832 2025 190355 - Construction of 3.5 km road from ByPass road to Sabzi Mewa Mandi via Darpa Khel Qasim Meeran Shah North Waziristan(CMD) [MA]-(A) /PDWP /07-02-2025 Roads 601.016 127.719 0.000 80.200 49 View
3525 1572 191844 2025 170402-Construction of Bara ByPasses Road from Nogazi Baba to Sheikhan Sports Stadium TD Khyber 7 KMs [MA]-(A) /PDWP /29-07-2024 Roads 929.811 929.810 0.000 0.001 47 View
3526 1573 195264 2025 Construction and Rehabilitation of Road from Tanga Bridge to Rocha Phase-II (10-Km) TSD Bannu-(A) /PDWP /01-11-2021 Roads 258.431 183.614 0.000 74.817 45 View
3527 1574 195266 2025 Construction of Road from Malik Khidmat Khan Chappari upto Dargah Shahidan TSD Bannu (10-KMs)-(A) /PDWP /01-11-2021 Roads 867.046 376.642 0.000 400.000 50 View
3528 1575 200124 2025 Construction of 9 Kms Blacktop Road Taking off Mir Ali Khaisoor Road to Thangri connecting Isha Razmak Road to Asad Khel Distt NW.-(A) /PDWP /24-01-2024 Roads 534.652 248.147 0.000 100.000 48 View
3529 1576 200125 2025 Construction of 5Km BTR from Shadman Road to Zarwar Khan Kot Ghawkha Laman Tehsil Wana-(A) /PDWP /04-02-2020 Roads 139.441 89.006 0.000 50.435 50 View
3530 1577 210581 2025 Construction of BTR from Niskora to Karha 04-Kms in Sub Division Darazinda (Phase-I)-(A) /DDWP /19-05-2025 Roads 192.789 33.610 0.000 66.740 41 View
CWD