Report Date:
September 03, 2025
Infrastructure Type:
Road
Total Damages:
7
Reported by:
Ikram Ullah
(XEN South Waziristan (L))
Affected Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages Overview
S# | Road Name & Location | Total Length | Status | Damaged Length | Damage Coordinates | Date Reported |
---|---|---|---|---|---|---|
1
|
Shakkai to Santoi Mantoi Road
|
8
(KM) |
Partially restored |
0.5
(KM) |
Aug 26, 2025
05:21 AM |
|
Remarks:
Rs. 3.000 Million required for restoration the damaged road and Rs.25.000 Million is required for proper rehabilitation of the road.
Reported by:
XEN South Waziristan (L)
|
||||||
2
|
Tank Wana Road via Gomal Zam Dam (Nelli Kach Bridge)
No coordinates available
|
.5
(KM) |
Partially restored |
0.5
(KM) |
No damage coordinates |
Aug 22, 2025
01:47 PM |
Remarks:
Rs. 0.300 Million is required to restore the road.
Reported by:
XEN South Waziristan (L)
|
||||||
3
|
Tank Wana Road via Gomal Zam Dam (Doghakh Tangi Landsliding)
No coordinates available
|
1.5
(KM) |
Partially restored |
1.5
(KM) |
No damage coordinates |
Aug 22, 2025
01:42 PM |
Remarks:
Rs.10.000 Million is required to restore the same.
Reported by:
XEN South Waziristan (L)
|
||||||
4
|
Tank Wana Road via Gomal Zam Dam (Bailey Bridge Landsliding)
No coordinates available
|
.5
(KM) |
Partially restored |
0.5
(KM) |
No damage coordinates |
Aug 22, 2025
12:48 PM |
Remarks:
Rs. 2.500 Million is required to restore the road.
Reported by:
XEN South Waziristan (L)
|
||||||
5
|
Tank Wana Road via Gomal Zam Dam (Near Pak Hotal)
|
5
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 22, 2025
12:45 PM |
Remarks:
Rs.5.000 Million is required to restore the same.
Reported by:
XEN South Waziristan (L)
|
||||||
6
|
Tank Wana Road via Gomal Zam Dam (GZD Landsliding)
|
1.5
(KM) |
Partially restored |
1
(KM) |
No damage coordinates |
Aug 22, 2025
12:38 PM |
Remarks:
Rs. 5.000 Million is required to restore the Road.
Reported by:
XEN South Waziristan (L)
|
||||||
7
|
Tank Wana Road Via Gomal Zam Dam
No coordinates available
|
100
(KM) |
Fully restored |
3
(KM) |
No damage coordinates |
Jul 11, 2025
05:17 AM |
Remarks:
Retaining walls at various location are completely damaged. 500 m road sliding occur. 2500 m length road was blocked due sliding
Reported by:
XEN South Waziristan (L)
|