South Waziristan Lower Damages Detail - Monsoon (2025)

Reported by:
Ikram Ullah (XEN South Waziristan (L))
7
Affected Roads
7
Total Damages
8
Damaged Length (KM)
1
Fully Restored
6
Partially Restored
0
Not Restored
Road Damages Overview
S# Road Name & Location Total Length Status Damaged Length Damage Coordinates Date Reported
1
Shakkai to Santoi Mantoi Road
8
(KM)
Partially restored 0.5
(KM)
Start: 32.483761, 69.627228 View
End: 32.483761, 69.627228 View
Aug 26, 2025
05:21 AM
Remarks: Rs. 3.000 Million required for restoration the damaged road and Rs.25.000 Million is required for proper rehabilitation of the road.
Reported by: XEN South Waziristan (L)
2
Tank Wana Road via Gomal Zam Dam (Nelli Kach Bridge)
.5
(KM)
Partially restored 0.5
(KM)
No damage coordinates Aug 22, 2025
01:47 PM
Remarks: Rs. 0.300 Million is required to restore the road.
Reported by: XEN South Waziristan (L)
3
Tank Wana Road via Gomal Zam Dam (Doghakh Tangi Landsliding)
1.5
(KM)
Partially restored 1.5
(KM)
No damage coordinates Aug 22, 2025
01:42 PM
Remarks: Rs.10.000 Million is required to restore the same.
Reported by: XEN South Waziristan (L)
4
Tank Wana Road via Gomal Zam Dam (Bailey Bridge Landsliding)
.5
(KM)
Partially restored 0.5
(KM)
No damage coordinates Aug 22, 2025
12:48 PM
Remarks: Rs. 2.500 Million is required to restore the road.
Reported by: XEN South Waziristan (L)
5
Tank Wana Road via Gomal Zam Dam (Near Pak Hotal)
5
(KM)
Partially restored 1
(KM)
No damage coordinates Aug 22, 2025
12:45 PM
Remarks: Rs.5.000 Million is required to restore the same.
Reported by: XEN South Waziristan (L)
6
Tank Wana Road via Gomal Zam Dam (GZD Landsliding)
1.5
(KM)
Partially restored 1
(KM)
No damage coordinates Aug 22, 2025
12:38 PM
Remarks: Rs. 5.000 Million is required to restore the Road.
Reported by: XEN South Waziristan (L)
7
Tank Wana Road Via Gomal Zam Dam
100
(KM)
Fully restored 3
(KM)
No damage coordinates Jul 11, 2025
05:17 AM
Remarks: Retaining walls at various location are completely damaged. 500 m road sliding occur. 2500 m length road was blocked due sliding
Reported by: XEN South Waziristan (L)
CWD