Report Date: July 07, 2025 Infrastructure Type: Road Total Damages: 12
10
Affected Infrastructures
12
Total Damages
49.3
Damaged Length (KM)
1
Fully Restored
8
Partially Restored
3
Not Restored
548.6 M
Total Cost (PKR)
Reporting Officers
Executive Engineer
XEN KURRAM UPPER
6 damage(s) reported
Executive Engineer
XEN KURRAM LOWER
6 damage(s) reported
Infrastructure Damages
S# Road Name Type Total Length Status Damaged Length Restoration Cost Rehabilitation Cost Date Reported
1 Various Roads In Upper Kurram Road 30.00 (KM) Partially restored 1.00 (KM) 200.00 M 200.00 M Jul 07, 2025
Remarks: i.e : Luqman Khel, Nastikot, Ahmadzai, Pewar, Burki, Zeran, Kirman, Shakh dowlat Khel etc.
2 Parachinar By-Pass Raod Road 17.00 (KM) Partially restored 0.050 (KM) 11.00 M 11.00 M Jul 07, 2025
Remarks: Road with culvert are partially damaged
3 Pewar Road Road 23.00 (KM) Partially restored 0.030 (KM) 7.00 M 7.00 M Jul 07, 2025
Remarks: Paratially Damaged. Traffic flow is on road shoulders
4 Pewar Burki Road Road 23.00 (KM) Partially restored 0.050 (KM) 7.00 M 7.00 M Jul 07, 2025
Remarks: Paratially Damaged. Traffic floww is on road shoulders
5 Zeran By-Pass Road in Main city (2 Damages) Road 1.00 (KM) Not restored 45.00 (KM) 7.00 M 7.00 M Jul 07, 2025
Remarks: Full culvert has been washed away. The link of the village with the city has been cut off due to demage.
Not restored 0.200 (KM) 20.00 M 20.00 M Jul 07, 2025
Remarks: Complete part of the Road with the R/Wall has been washed away.
6 Komasa to Arwaza Road Road 25 (KM) Partially restored 1.200 (KM) 2.00 M 2.00 M Jul 01, 2025
Remarks: Land slides. slips and R/wall damaged
7 Taby Khani Khel Main Road central kurram Road 12 (KM) Partially restored 0.800 (KM) 1.00 M 1.00 M Jul 01, 2025
Remarks: Land slided to the road and road was clear for the traffic on emergency basis
8 Sadda By-Pass Road Road 23.00 (KM) Fully restored 0.300 (KM) 7.00 M 7.00 M Jun 29, 2025
Remarks: R/Wall to be needed for the damaged portion and also Drain to be construct for the best flow of water from the road
9 Sadda Dogar Road (2 Damages) Road 28.00 (KM) Partially restored 0.060 (KM) 4.00 M 4.00 M Jun 29, 2025
Remarks: 200 ft R/Wall is fully damaged which needs to be urgent restoration
Partially restored 0.010 (KM) 0.30 M 0.30 M Jun 29, 2025
Remarks: Land slide and road is currently clrared for the trafic flow
10 Kemal Baza Road Central Kurram Road 05 (KM) Not restored 0.600 (KM) 10.00 M 6.00 M Jun 29, 2025
Remarks: The road is satiauted in central kurram and badly damaged in several parts icluding land slide , fall of R/Wall and shigle road washed away