Report Date:
September 03, 2025
Infrastructure Type:
Road
Total Damages:
12
Reported by:
Abid Khan
(XEN KURRAM UPPER)
Abbas Khan
(XEN KURRAM LOWER)
Affected Roads
Total Damages
Damaged Length
(KM)
Fully Restored
Partially Restored
Not Restored
Road Damages Overview
S# | Road Name & Location | Total Length | Status | Damaged Length | Damage Coordinates | Date Reported |
---|---|---|---|---|---|---|
1
|
Various Roads In Upper Kurram
No coordinates available
|
30.00
(KM) |
Partially restored |
3
(KM) |
Aug 27, 2025
10:52 AM |
|
Remarks:
Various roads in upper kurram has been damaged due to the flood in upper kurram at various places
Reported by:
XEN KURRAM UPPER
|
||||||
2
|
Krakhela road to Shaheed Mazar Road
|
03
(KM) |
Partially restored |
1
(KM) |
Aug 27, 2025
10:46 AM |
|
Remarks:
Main Culvert Has been washed away. Temporary diversion has been made for the traffic flow
Reported by:
XEN KURRAM UPPER
|
||||||
3
|
Dall Akakhel road
|
2.5
(KM) |
Partially restored |
1
(KM) |
Aug 27, 2025
10:40 AM |
|
Remarks:
Road has dmaged in several points such surface of road, drain , earthe work and retaining wall etc.
Reported by:
XEN KURRAM UPPER
|
||||||
4
|
Maiky Road Parachinar
|
07
(KM) |
Partially restored |
1
(KM) |
Aug 27, 2025
10:36 AM |
|
Remarks:
Road has Damaged in several points including culverts,drains earth work etc
Reported by:
XEN KURRAM UPPER
|
||||||
5
|
Zeran By-Pass Road in Main city
|
1.00
(KM) |
Partially restored |
0.2
(KM) |
Aug 27, 2025
10:07 AM |
|
Remarks:
Road Has been fully washed away in 200 meters
Reported by:
XEN KURRAM UPPER
|
||||||
6
|
Khomasa to Arwaza Road Area Makhrany Central Kurram
|
25.00
(KM) |
Partially restored |
0.2
(KM) |
No damage coordinates |
Jul 11, 2025
06:37 AM |
Remarks:
R/Wall Damaged , Land slide and some part of Road washed away
Reported by:
XEN KURRAM LOWER
|
||||||
7
|
Komasa to Arwaza Road
|
25
(KM) |
Partially restored |
1.2
(KM) |
Jul 01, 2025
05:48 AM |
|
Remarks:
Land slides. slips and R/wall damaged
Reported by:
XEN KURRAM LOWER
|
||||||
8
|
Taby Khani Khel Main Road central kurram
|
12
(KM) |
Partially restored |
0.8
(KM) |
Jul 01, 2025
05:36 AM |
|
Remarks:
Land slided to the road and road was clear for the traffic on emergency basis
Reported by:
XEN KURRAM LOWER
|
||||||
9
|
Sadda By-Pass Road
|
23.00
(KM) |
Fully restored |
0.3
(KM) |
No damage coordinates |
Jun 29, 2025
01:09 PM |
Remarks:
R/Wall to be needed for the damaged portion and also Drain to be construct for the best flow of water from the road
Reported by:
XEN KURRAM LOWER
|
||||||
10
|
Sadda Dogar Road
2
|
28.00
(KM) |
1 Partially restored |
0.06
(KM) |
Jun 29, 2025
01:01 PM |
|
Remarks:
200 ft R/Wall is fully damaged which needs to be urgent restoration
Reported by:
XEN KURRAM LOWER
|
||||||
2 Partially restored |
0.01
(KM) |
No damage coordinates |
Jun 29, 2025
12:57 PM |
|||
Remarks:
Land slide and road is currently clrared for the trafic flow
Reported by:
XEN KURRAM LOWER
|
||||||
11
|
Kemal Baza Road Central Kurram
|
05
(KM) |
Partially restored |
0.6
(KM) |
Jun 29, 2025
05:56 AM |
|
Remarks:
The road is satiauted in central kurram and badly damaged in several parts icluding land slide , fall of R/Wall and shigle road washed away.
Reported by:
XEN KURRAM LOWER
|