Haripur Damages Detail - Monsoon (2025)

Report Date: August 02, 2025 Infrastructure Type: Road Total Damages: 10
Reported by:
Muhammad Zahid (XEN H/W HARIPUR) , Engr. Sohail Idrees (Managing Director PKHA)
10
Affected Roads
10
Total Damages
56.068
Damaged Length (KM)
0
Fully Restored
8
Partially Restored
2
Not Restored
Road Damages
S# Road Name Total Length Status Damaged Length Dated
1 Main road Kahal 1 (KM) Partially restored 1 (KM) Jul 29, 2025
Remarks: Rs. 6.00 (M) required for rehabilitation.
Reported by: XEN H/W HARIPUR
2 Baghpur Dehri Road 5 (KM) Not restored 5 (KM) Jul 28, 2025
Remarks: Rs. 2.200 (M) required for rehabilitation.
Reported by: XEN H/W HARIPUR
3 S-12 Haripur Chppar Chandur Shara-e-Tanawal to 72 (KM) Partially restored 0.03 (KM) Jul 06, 2025
Remarks: Vented Causeway has been damaged and the wingwall downstream needs to be restored. The Cause Way has been opened manually by labour.
Reported by: Managing Director PKHA
4 Tarnawa to Kohala Bala 35 (KM) Partially restored 14 (KM) Jul 06, 2025
Remarks: The amount is for clearance of debris, sli[ps,ersosion and leveling of Kacha Road only. The boulders on site have been removed Primaly with help of locals,
Reported by: Managing Director PKHA
5 Ghazi-Serikot-Panian Road (S-1) 40 (KM) Not restored 0.038 (KM) Jul 06, 2025
Remarks: The restoration should be done at the earliest to avoid any damage to the remaining road structure.
Reported by: Managing Director PKHA
6 Haripur Sarai Nimat Khan road 14 (KM) Partially restored 14 (KM) Jul 02, 2025
Remarks: Retaining structure damaged.
Reported by: XEN H/W HARIPUR
7 Karrach Road 4 (KM) Partially restored 4 (KM) Jul 02, 2025
Remarks: Retaining structure damaged & road is partially opened for traffic.
Reported by: XEN H/W HARIPUR
8 Talhad Road. 3 (KM) Partially restored 3 (KM) Jul 02, 2025
Remarks: Retaining structure damaged on said road. An amount of Rs. 5.000 (M) is restoration of damaged structure.
Reported by: XEN H/W HARIPUR
9 Nartopa Road 12 (KM) Partially restored 12 (KM) Jul 02, 2025
Remarks: Retaining wall along road side damaged due to heavy rain fall. An amount of Rs. 2.500 (M) required for restoration of damaged structure.
Reported by: XEN H/W HARIPUR
10 Sahki Khenian road 7 (KM) Partially restored 3 (KM) Jul 02, 2025
Remarks: Landslide occurred at the site due to heavy rainfall. The debris has been partially cleared and the road has been restored for traffic
Reported by: XEN H/W HARIPUR