Chitral Lower Damages Detail - Monsoon (2025)

Report Date: August 02, 2025 Infrastructure Type: Road Total Damages: 2
Reported by:
Muhammad Adnan (XEN LOWER CHITRAL)
2
Affected Roads
2
Total Damages
10.2
Damaged Length (KM)
1
Fully Restored
1
Partially Restored
0
Not Restored
Road Damages
S# Road Name Total Length Status Damaged Length Dated
1 Madaklasht Road 45 (KM) Partially restored 10 (KM) Jul 30, 2025
Remarks: Road has been temporarily restored. Further work in progress
Reported by: XEN LOWER CHITRAL
2 Faizabad Hone road, Shiaqotak, Doomshor Orguch road 7 (KM) Fully restored 0.2 (KM) Jun 30, 2025
Remarks: Due to high flood level, the said retaining wall was damaged which was restored immediately. However rehabilitation of the retaining wall is required
Reported by: XEN LOWER CHITRAL