Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
- | - | - | - | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- December - 2017 |
Tender approval under process, opened on 21/12/2017. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- November - 2017 |
Tender approval under process. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- June - 2018 |
Work order issued. |
No Image |
1) Construction of Khann road Abbottabad
2) Construction of Chahan road Abbottabad
3) Construction of Bhatian road Abbottabad
4) Improvement, widening and BT of Ratigali Ghattian road UC Seer Sharqi
5) Improvement and pavement of Bara Khaier link road UC Seer Sharqi
6) Improvement and pavement of Lawran road UC Seer Sharqi
7) Improvement and pavement of Rahwal Khaiter road and Sarula road UC Seer Sharqi
8) Improvement of Dakh Doga road and Jaffer Pehlwan road UC Beerangli
9) Improvement and pavement of Nawshera Dispensary road UC Tajwal
10) Construction of Jaggian Kohalian road UC Bagh
11) Improvement and pavement of Kalas Internal roads UC Seer Sharqi
12) Improvement and pavement of Kalas Internal roads and Taror Baswer road UC Seer Sharqi
13) Improvement and pavement of Dannah Internal roads and Kalar Kundla road UC Goreeni
14) Pavement of streets, RW and Sewerage link Dheri Kholey Choonakari UC Kakul Abbottabad
15) PCC road and sewerage line near Noor Clinic Kohisar Town, Ilyasi Masjid UC Nawansher Abbottabad
16) Pavement of streets, RW and sewerage line central, Choti and Bari Sheikhulbandi UC Sheikhulbandi
17) Pavement of streets, RW and sewerage line from Bilal Town Chowk to Garga UC Cantt Abbottabad
18) Dozer/excavator work Nargal to Upper Khan via Phugial UC Pluck
19) PCC road village Chotry Mahraiz UC Kukmong | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- May - 2018 |
Work order issued. |
No Image |
1) Construction of Khann road Abbottabad
2) Construction of Chahan road Abbottabad
3) Construction of Bhatian road Abbottabad
4) Improvement, widening and BT of Ratigali Ghattian road UC Seer Sharqi
5) Improvement and pavement of Bara Khaier link road UC Seer Sharqi
6) Improvement and pavement of Lawran road UC Seer Sharqi
7) Improvement and pavement of Rahwal Khaiter road and Sarula road UC Seer Sharqi
8) Improvement of Dakh Doga road and Jaffer Pehlwan road UC Beerangli
9) Improvement and pavement of Nawshera Dispensary road UC Tajwal
10) Construction of Jaggian Kohalian road UC Bagh
11) Improvement and pavement of Kalas Internal roads UC Seer Sharqi
12) Improvement and pavement of Kalas Internal roads and Taror Baswer road UC Seer Sharqi
13) Improvement and pavement of Dannah Internal roads and Kalar Kundla road UC Goreeni
14) Pavement of streets, RW and Sewerage link Dheri Kholey Choonakari UC Kakul Abbottabad
15) PCC road and sewerage line near Noor Clinic Kohisar Town, Ilyasi Masjid UC Nawansher Abbottabad
16) Pavement of streets, RW and sewerage line central, Choti and Bari Sheikhulbandi UC Sheikhulbandi
17) Pavement of streets, RW and sewerage line from Bilal Town Chowk to Garga UC Cantt Abbottabad
18) Dozer/excavator work Nargal to Upper Khan via Phugial UC Pluck
19) PCC road village Chotry Mahraiz UC Kukmong | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- April - 2018 |
Work order issued. |
No Image |
1) Construction of Khann road Abbottabad
2) Construction of Chahan road Abbottabad
3) Construction of Bhatian road Abbottabad
4) Improvement, widening and BT of Ratigali Ghattian road UC Seer Sharqi
5) Improvement and pavement of Bara Khaier link road UC Seer Sharqi
6) Improvement and pavement of Lawran road UC Seer Sharqi
7) Improvement and pavement of Rahwal Khaiter road and Sarula road UC Seer Sharqi
8) Improvement of Dakh Doga road and Jaffer Pehlwan road UC Beerangli
9) Improvement and pavement of Nawshera Dispensary road UC Tajwal
10) Construction of Jaggian Kohalian road UC Bagh
11) Improvement and pavement of Kalas Internal roads UC Seer Sharqi
12) Improvement and pavement of Kalas Internal roads and Taror Baswer road UC Seer Sharqi
13) Improvement and pavement of Dannah Internal roads and Kalar Kundla road UC Goreeni
14) Pavement of streets, RW and Sewerage link Dheri Kholey Choonakari UC Kakul Abbottabad
15) PCC road and sewerage line near Noor Clinic Kohisar Town, Ilyasi Masjid UC Nawansher Abbottabad
16) Pavement of streets, RW and sewerage line central, Choti and Bari Sheikhulbandi UC Sheikhulbandi
17) Pavement of streets, RW and sewerage line from Bilal Town Chowk to Garga UC Cantt Abbottabad
18) Dozer/excavator work Nargal to Upper Khan via Phugial UC Pluck
19) PCC road village Chotry Mahraiz UC Kukmong | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- March - 2018 |
Work order issued. |
No Image |
1) Construction of Khann road Abbottabad
2) Construction of Chahan road Abbottabad
3) Construction of Bhatian road Abbottabad
4) Improvement, widening and BT of Ratigali Ghattian road UC Seer Sharqi
5) Improvement and pavement of Bara Khaier link road UC Seer Sharqi
6) Improvement and pavement of Lawran road UC Seer Sharqi
7) Improvement and pavement of Rahwal Khaiter road and Sarula road UC Seer Sharqi
8) Improvement of Dakh Doga road and Jaffer Pehlwan road UC Beerangli
9) Improvement and pavement of Nawshera Dispensary road UC Tajwal
10) Construction of Jaggian Kohalian road UC Bagh
11) Improvement and pavement of Kalas Internal roads UC Seer Sharqi
12) Improvement and pavement of Kalas Internal roads and Taror Baswer road UC Seer Sharqi
13) Improvement and pavement of Dannah Internal roads and Kalar Kundla road UC Goreeni
14) Pavement of streets, RW and Sewerage link Dheri Kholey Choonakari UC Kakul Abbottabad
15) PCC road and sewerage line near Noor Clinic Kohisar Town, Ilyasi Masjid UC Nawansher Abbottabad
16) Pavement of streets, RW and sewerage line central, Choti and Bari Sheikhulbandi UC Sheikhulbandi
17) Pavement of streets, RW and sewerage line from Bilal Town Chowk to Garga UC Cantt Abbottabad
18) Dozer/excavator work Nargal to Upper Khan via Phugial UC Pluck
19) PCC road village Chotry Mahraiz UC Kukmong | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- February - 2018 |
Work order issued. |
No Image |
1) Construction of Khann road Abbottabad
2) Construction of Chahan road Abbottabad
3) Construction of Bhatian road Abbottabad
4) Improvement, widening and BT of Ratigali Ghattian road UC Seer Sharqi
5) Improvement and pavement of Bara Khaier link road UC Seer Sharqi
6) Improvement and pavement of Lawran road UC Seer Sharqi
7) Improvement and pavement of Rahwal Khaiter road and Sarula road UC Seer Sharqi
8) Improvement of Dakh Doga road and Jaffer Pehlwan road UC Beerangli
9) Improvement and pavement of Nawshera Dispensary road UC Tajwal
10) Construction of Jaggian Kohalian road UC Bagh
11) Improvement and pavement of Kalas Internal roads UC Seer Sharqi
12) Improvement and pavement of Kalas Internal roads and Taror Baswer road UC Seer Sharqi
13) Improvement and pavement of Dannah Internal roads and Kalar Kundla road UC Goreeni
14) Pavement of streets, RW and Sewerage link Dheri Kholey Choonakari UC Kakul Abbottabad
15) PCC road and sewerage line near Noor Clinic Kohisar Town, Ilyasi Masjid UC Nawansher Abbottabad
16) Pavement of streets, RW and sewerage line central, Choti and Bari Sheikhulbandi UC Sheikhulbandi
17) Pavement of streets, RW and sewerage line from Bilal Town Chowk to Garga UC Cantt Abbottabad
18) Dozer/excavator work Nargal to Upper Khan via Phugial UC Pluck
19) PCC road village Chotry Mahraiz UC Kukmong | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- January - 2018 |
Tender approval under process, opened on 21/12/2017. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
- | - | - | - | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- December - 2017 |
Tender floated on 18/01/2018. |
No Image |
Construction of Community Centers in Ucs Baka Khel and Takhti Khel Bannu | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- June - 2018 |
Out of 2 units, 1 work order issued on 28/02/2018, 1 tender called on 20/03/2018. |
No Image |
1) Construction of Community Centers in UCs Baka Khel and Takhti Khel, Bannu
2) Construction/renovation of Babe Shah Muhammad Khan Narmi Khel road, Bannu | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- May - 2018 |
Out of 2 units, 1 work order issued on 28/02/2018, 1 tender called on 20/03/2018. |
No Image |
1) Construction of Community Centers in UCs Baka Khel and Takhti Khel, Bannu
2) Construction/renovation of Babe Shah Muhammad Khan Narmi Khel road, Bannu | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- April - 2018 |
Out of 2 units, 1 work order issued on 28/02/2018, 1 tender called on 20/03/2018. |
No Image |
1) Construction of Community Centers in UCs Baka Khel and Takhti Khel, Bannu
2) Construction/renovation of Babe Shah Muhammad Khan Narmi Khel road, Bannu | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- March - 2018 |
Out of 2 units, 1 work order issued on 28/02/2018, 1 tender called on 20/03/2018. |
No Image |
1) Construction of Community Centers in UCs Baka Khel and Takhti Khel, Bannu
2) Construction/renovation of Babe Shah Muhammad Khan Narmi Khel road, Bannu | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- February - 2018 |
Out of 2 units, 1 work order issued on 28/02/2018, 1 tender called on 20/03/2018. |
No Image |
1) Construction of Community Centers in UCs Baka Khel and Takhti Khel, Bannu
2) Construction/renovation of Babe Shah Muhammad Khan Narmi Khel road, Bannu | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14.4 | 0 | 0 | 0 | 0 | 0 | 0 | 14.4 | - |
- January - 2018 |
Tender floated on 18/01/2018. |
No Image |
Construction of Community Centers in Ucs Baka Khel and Takhti Khel Bannu | |||||||||||||||||||
856 (OG) |
170523-Construction of Circular Bypass road Bannu (64.90 Km). |
Bannu PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 6957.605 | 22.5 | 30 | 30 | 15 | 15 | 37.5 | 6905.105 | 1% |
1% September - 2018 |
Electronically submitted bid opened for 3 packages on 07/09/2018. Evaluation under process. |
No Image |
856 (OG) |
170523-Construction of Circular Bypass road Bannu (64.90 Km). |
Bannu PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 6957.605 | 30 | 30 | 30 | 15 | 0 | 30 | 6897.605 | 1% |
0% July - 2018 |
Feasibility study and detailed engineering design has been awarded to M/S AAA Karachi, M/S PCE (JV). Pre-qualification of contractor has been called on 13/03/2018. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
- | - | - | - | - | 76.3 | 0 | 0 | 0 | 0 | 0 | 0 | 76.3 | - |
- December - 2017 |
Tender called on 08/12/2017. Stay order issued on e-bid. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
- | - | - | - | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
PC-I/DCE under preparation. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
- | - | - | - | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
PC-I/DCE under preparation. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 0 | 0 | 0 | 0 | 0 | 76.3 | - |
- November - 2017 |
Tender called on 08/12/2017. Stay order issued. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- October - 2017 |
Approved in DDC on 26/10/2017. AA awaited. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 34.34 | 34.34 | 34.34 | 31.225 | 31.225 | 41.96 | 45% |
41% June - 2018 |
Work in progress. |
No Image |
1) Improvement of Beshkot Paiza Road Phase-II UC Thakot
2) Construction & Improvement of Donga, Tapka, Daba Bar Road UC Shamlai
3) Improvement of Battagram, Arghashori Sandasaray Road Phase-II UC Battagram
4) Construction/Widening of Zarinabad Zari Oba road UC Thakot
5) Widening & PCC Injopayen road UC Peshora
6) Construction of Shah Google Maidan road UC Gajbori
7) Construction of Karain Pora Chamgay road UC Koza Banda
8) Construction of Chamgai Ashare road UC Koza Banda
9) Construction of Jabri Nato road UC Rajdhari
10) Construction of Kharari Momand Faqir Sewan Korona road UC Bania
11) Construction of Nowsher road UC Ajmira
12) Construction of Chapargram Marhani road Phase-II UC Ajmira
13) Construction of Gada to Yaro road UC Batamori
14) Construction of Bagh Banda Jirakot road UC Paimal Sharif
15) Construction of Takhta Karain Kanshai road & PCC UC Paimal Sharif
16) Construction of Asharai Sar road UC Paimal Sharif | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 34.34 | 34.34 | 34.34 | 29.358 | 29.358 | 41.96 | 45% |
38% May - 2018 |
Work started. |
No Image |
1) Improvement of Beshkot Paiza Road Phase-II UC Thakot
2) Construction & Improvement of Donga, Tapka, Daba Bar Road UC Shamlai
3) Improvement of Battagram, Arghashori Sandasaray Road Phase-II UC Battagram
4) Construction/Widening of Zarinabad Zari Oba road UC Thakot
5) Widening & PCC Injopayen road UC Peshora
6) Construction of Shah Google Maidan road UC Gajbori
7) Construction of Karain Pora Chamgay road UC Koza Banda
8) Construction of Chamgai Ashare road UC Koza Banda
9) Construction of Jabri Nato road UC Rajdhari
10) Construction of Kharari Momand Faqir Sewan Korona road UC Bania
11) Construction of Nowsher road UC Ajmira
12) Construction of Chapargram Marhani road Phase-II UC Ajmira
13) Construction of Gada to Yaro road UC Batamori
14) Construction of Bagh Banda Jirakot road UC Paimal Sharif
15) Construction of Takhta Karain Kanshai road & PCC UC Paimal Sharif
16) Construction of Asharai Sar road UC Paimal Sharif | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 34.34 | 34.34 | 34.34 | 25.717 | 25.717 | 41.96 | 45% |
34% April - 2018 |
Work started. |
No Image |
1) Improvement of Beshkot Paiza Road Phase-II UC Thakot
2) Construction & Improvement of Donga, Tapka, Daba Bar Road UC Shamlai
3) Improvement of Battagram, Arghashori Sandasaray Road Phase-II UC Battagram
4) Construction/Widening of Zarinabad Zari Oba road UC Thakot
5) Widening & PCC Injopayen road UC Peshora
6) Construction of Shah Google Maidan road UC Gajbori
7) Construction of Karain Pora Chamgay road UC Koza Banda
8) Construction of Chamgai Ashare road UC Koza Banda
9) Construction of Jabri Nato road UC Rajdhari
10) Construction of Kharari Momand Faqir Sewan Korona road UC Bania
11) Construction of Nowsher road UC Ajmira
12) Construction of Chapargram Marhani road Phase-II UC Ajmira
13) Construction of Gada to Yaro road UC Batamori
14) Construction of Bagh Banda Jirakot road UC Paimal Sharif
15) Construction of Takhta Karain Kanshai road & PCC UC Paimal Sharif
16) Construction of Asharai Sar road UC Paimal Sharif | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 34.34 | 34.34 | 34.34 | 0 | 0 | 41.96 | 45% |
- March - 2018 |
Tender called on 15/01/2018. Stay order on opening of tender, hearing date on 04/04/2018. |
No Image |
1) Improvement of Beshkot Paiza Road Phase-II UC Thakot
2) Construction & Improvement of Donga, Tapka, Daba Bar Road UC Shamlai
3) Improvement of Battagram, Arghashori Sandasaray Road Phase-II UC Battagram
4) Construction/Widening of Zarinabad Zari Oba road UC Thakot
5) Widening & PCC Injopayen road UC Peshora
6) Construction of Shah Google Maidan road UC Gajbori
7) Construction of Karain Pora Chamgay road UC Koza Banda
8) Construction of Chamgai Ashare road UC Koza Banda
9) Construction of Jabri Nato road UC Rajdhari
10) Construction of Kharari Momand Faqir Sewan Korona road UC Bania
11) Construction of Nowsher road UC Ajmira
12) Construction of Chapargram Marhani road Phase-II UC Ajmira
13) Construction of Gada to Yaro road UC Batamori
14) Construction of Bagh Banda Jirakot road UC Paimal Sharif
15) Construction of Takhta Karain Kanshai road & PCC UC Paimal Sharif
16) Construction of Asharai Sar road UC Paimal Sharif | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 0 | 0 | 0 | 0 | 0 | 76.3 | - |
- February - 2018 |
Tender called on 15/01/2018. Stay order on opening of tender, hearing date on 14/03/2018. |
No Image |
1) Improvement of Beshkot Paiza Road Phase-II UC Thakot
2) Construction & Improvement of Donga, Tapka, Daba Bar Road UC Shamlai
3) Improvement of Battagram, Arghashori Sandasaray Road Phase-II UC Battagram
4) Construction/Widening of Zarinabad Zari Oba road UC Thakot
5) Widening & PCC Injopayen road UC Peshora
6) Construction of Shah Google Maidan road UC Gajbori
7) Construction of Karain Pora Chamgay road UC Koza Banda
8) Construction of Chamgai Ashare road UC Koza Banda
9) Construction of Jabri Nato road UC Rajdhari
10) Construction of Kharari Momand Faqir Sewan Korona road UC Bania
11) Construction of Nowsher road UC Ajmira
12) Construction of Chapargram Marhani road Phase-II UC Ajmira
13) Construction of Gada to Yaro road UC Batamori
14) Construction of Bagh Banda Jirakot road UC Paimal Sharif
15) Construction of Takhta Karain Kanshai road & PCC UC Paimal Sharif
16) Construction of Asharai Sar road UC Paimal Sharif | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Battagram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 76.3 | 0 | 0 | 0 | 0 | 0 | 0 | 76.3 | - |
- January - 2018 |
Tender called on 08/12/2017. Stay order on opening of tender. |
No Image |
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
- | - | - | - | - | 88.795 | 0 | 0 | 0 | 0 | 0 | 0 | 88.795 | - |
- December - 2017 |
Work started on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
- | - | - | - | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2017 |
PC-I/DCE for Rs.50 m submitted to SE Peshawar on 26/07/2017. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
- | - | - | - | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- August - 2017 |
PC-I/DCE for Rs.50 m submitted to SE Peshawar on 26/07/2017. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
- | - | - | - | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2017 |
PC-I/DCE for Rs.50 m submitted to SE Peshawar on 26/07/2017. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 0 | 0 | 0 | 0 | 0 | 88.795 | - |
- November - 2017 |
Technical evaluation under process (PK-17 and PK-20). |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 0 | 0 | 0 | 0 | 0 | 88.795 | - |
- October - 2017 |
Re-tender opened on 16/11/2017 (PK-17 and PK-20). |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 27.818 | 27.818 | 27.818 | 22.578 | 22.578 | 60.977 | 31% |
25% June - 2018 |
Work in progress on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 27.818 | 27.818 | 27.818 | 22.578 | 22.578 | 60.977 | 31% |
25% May - 2018 |
Work in progress on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 2.9 | 2.9 | 2.9 | 2.06 | 2.06 | 85.895 | 3% |
2% April - 2018 |
Work in progress on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 2.9 | 2.9 | 2.9 | 2.06 | 2.06 | 85.895 | 3% |
2% March - 2018 |
Work in progress on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 0 | 0 | 0 | 0 | 0 | 88.795 | - |
- February - 2018 |
Work in progress on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (New) |
170357-Special Package for Development Initiatives in Khyber Pakhtunkhwa (List of schemes at Annex-II). |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.795 | 0 | 0 | 0 | 0 | 0 | 0 | 88.795 | - |
- January - 2018 |
Work started on all 5 units. |
No Image |
1) Annex-II No.428 - Construction & Black Topping of Roads i.e. From Main Tangi Mardhand road to Torkhut U/C Behram Dheri and Road in UC Gandherhia District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
2) Annex-II No.429 - Recondition of road from Harichand to Soorkam District Charsadda (Cost Rs.20 m and Alloc Rs.1.799 m).
3) Annex-II No.430 - Recondition of road from Tower Swat canal to Tangi Head Quarter District Charsadda (Cost Rs.10 and Alloc Rs.0.899 m). | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 22 | 22 | 9.743786 | 92.136796 | 182.915 | 34% |
33% December - 2019 |
Length 22 Km - 3 Km BT completed. |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 10 | 10 | 9.744 | 92.13701 | 182.915 | 34% |
33% November - 2019 |
Length 22 Km - 3 Km BT completed. |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 10 | 10 | 9.84 | 92.23301 | 182.915 | 34% |
34% October - 2019 |
Length 22 Km - 3 Km BT completed. |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 10 | 2.5 | 2.5 | 84.89301 | 182.915 | 34% |
31% September - 2019 |
Length 22 Km - 3 Km BT completed. |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 10 | 2.5 | 0 | 82.39301 | 182.915 | 34% |
30% August - 2019 |
Length 22 Km - 3 Km BT completed. |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 30 | 30 | 18.317 | 100.71001 | 182.915 | 34% |
37% May - 2020 |
Length 22 Km - 3 Km BT completed.
Demand Rs. 20 M |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 30 | 30 | 18.317 | 100.71001 | 182.915 | 34% |
37% April - 2020 |
Length 22 Km - 3 Km BT completed.
Demand Rs. 20 M |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 30 | 30 | 18.317 | 100.71001 | 182.915 | 34% |
37% March - 2020 |
Length 22 Km - 3 Km BT completed.
Demand Rs. 20 M |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 30 | 30 | 18.317 | 100.71001 | 182.915 | 34% |
37% February - 2020 |
Length 22 Km - 3 Km BT completed.
Demand Rs. 20 M |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
856 (OG) |
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 275.308 | 82.39301 | 10 | 30 | 30 | 15.737 | 98.13001 | 182.915 | 34% |
36% January - 2020 |
Length 22 Km - 3 Km BT completed.
Demand Rs. 20 M |
No Image |
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh | |||||||||||||||||||
Pages : 1 2 |