Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 13.575 | 13.575 | 13.575 | 13.575 | 44.375 | 102.574 | 30% |
30% December - 2019 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 13.575 | 13.575 | 13.575 | 2.06 | 32.86 | 102.574 | 30% |
22% November - 2019 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 13.575 | 13.575 | 13.575 | 2.06 | 32.86 | 102.574 | 30% |
22% October - 2019 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 0 | 0 | 0 | 0 | 30.8 | 116.149 | - |
21% September - 2019 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 0 | 0 | 0 | 0 | 30.8 | 116.149 | - |
21% August - 2019 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 23.311 | 23.311 | 23.311 | 19.537 | 50.337 | 92.838 | 37% |
34% May - 2020 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 23.311 | 23.311 | 23.311 | 19.537 | 50.337 | 92.838 | 37% |
34% April - 2020 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 23.311 | 23.311 | 23.311 | 19.537 | 50.337 | 92.838 | 37% |
34% March - 2020 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 23.311 | 23.311 | 23.311 | 19.537 | 50.337 | 92.838 | 37% |
34% February - 2020 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Abbottabad |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 146.949 | 30.8 | 13.575 | 13.575 | 13.575 | 13.575 | 44.375 | 102.574 | 30% |
30% January - 2020 |
FF roof laid. |
No Image |
1) Havelian | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% December - 2019 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% November - 2019 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% October - 2019 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 6 | 6 | 6 | 6 | 243.941 | 88.675 | 73% |
73% September - 2019 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 6 | 6 | 6 | 0 | 237.941 | 88.675 | 73% |
72% August - 2019 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% May - 2020 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% April - 2020 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% March - 2020 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% February - 2020 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
D.I.Khan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 332.616 | 237.941 | 24.726 | 24.726 | 24.726 | 24.726 | 262.667 | 69.949 | 79% |
79% January - 2020 |
Daraban - main building Finishing in progress. Paharpur - tile of flooring in progress. |
No Image |
1) Tehsil Daraban
2) Tehsil Paharpur | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% December - 2019 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% November - 2019 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% October - 2019 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 4 | 4 | 4 | 4 | 45.83 | 190.868 | 19% |
19% September - 2019 |
Main building - in progress. BW 90% completed. |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 4 | 4 | 4 | 0 | 41.83 | 190.868 | 19% |
18% August - 2019 |
Main building - in progress. BW 90% completed. |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% May - 2020 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% April - 2020 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% March - 2020 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% February - 2020 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.698 | 41.83 | 14 | 14 | 14 | 14 | 55.83 | 180.868 | 24% |
24% January - 2020 |
Main building - in progress. BW 90% completed.
Demand Rs. 20 m |
No Image |
Judicial Complex at Hangu | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 2.848 | 19.409 | 89.69 | 20% |
17% December - 2019 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 1 | 17.561 | 89.69 | 20% |
16% November - 2019 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102 | 16.561 | 6 | 6 | 6 | 0 | 16.561 | 79.439 | 22% |
16% October - 2019 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102 | 16.561 | 1 | 1 | 1 | 0 | 16.561 | 84.439 | 17% |
16% September - 2019 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 102 | 16.561 | 1 | 1 | 1 | 0 | 16.561 | 84.439 | 17% |
16% August - 2019 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 6 | 22.561 | 89.69 | 20% |
20% May - 2020 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 2.848 | 19.409 | 89.69 | 20% |
17% April - 2020 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 2.848 | 19.409 | 89.69 | 20% |
17% March - 2020 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 2.848 | 19.409 | 89.69 | 20% |
17% February - 2020 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Mansehra |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 112.251 | 16.561 | 6 | 6 | 6 | 2.848 | 19.409 | 89.69 | 20% |
17% January - 2020 |
Foundation and plinth in progress. |
No Image |
Tehsil Judicial Complex, Oghi Manshera | |||||||||||||||||||
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- December - 2019 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- November - 2019 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- October - 2019 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- September - 2019 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- August - 2019 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- May - 2020 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- April - 2020 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- March - 2020 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- February - 2020 |
No Image | |
587 (OG) |
140296-F/S and Construction of Tehsil Judicial Complexes in 5 Selected Districts on Priority Basis (Paharpur, Draband, Oghi, Havelian and Hangu) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 914.988 | 331.131 | 58.301 | 58.301 | 0 | 0 | 331.131 | 0 | - |
- January - 2020 |
No Image | |
Pages : 1 2 |