Progressive Review for the month(s) of : May - 2021,

Showing Page Number : 50 of 69

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks Images
1588
(OG)
170627-Rehabilitation of Karora to Ajmir Road (12Km) District Shangla
Shangla
30-11--1 30-11--1 - 30-11--1 - 150 99.514 20 15 15 14.606 114.12 30.486 80% 76%
May - 2021
Package-1 - 5 Km, Package-2 - 7 Km - earth, Road work & S/Work in progress.
No Image
Package I (05-KM)
Package II (07-KM)
1589
(OG)
140964-F/S, Design & Rehabilitation / BT of Kalam to Gujar Gabral road (flood damaged), Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 643.877 0 100 80 80 80 80 543.877 16% 12%
May - 2021
Length 17.5 Km - 3 km asphlat completed . Additional work 4.5 km - Tendering under process
No Image
PK-85, Swat (17.5 Km)
1590
(OG)
140965-F/S, Design & improvement, Widening & BT of Mangwaltan to Toha Road (17.5 Km), District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 435.93 0 100 100 100 100 0 0
May - 2021
original Scope - 6.5 Km completed and balance work of Banjot (6 KM) and Charbagh (4 KM) earth work and strcture work is in progress
No Image
PK  -86, Swat
1. F/S, Design & Imp: Widening & B/T of Mangwaltan to Toha Road (6.5 KM) Swat Additional work
2. Manglawar to Banjot Road Swat
 
1591
(OG)
140970-F/S, Design & Rehabilitation of Mingora Jambeel Gokand road, Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 573.748 0 50 40 40 40 40 523.748 9% 7%
May - 2021
20 km out of 20.750 km asphlat completed. Balance work (structure Wrok) tendering in progress. Stay Granted by the lower courts on Pacakge -III (7km)
No Image
1) Package-1 (Km-1 to 7)
2) Package-2 (Km-8 to 14)
3) Package-3 (Km-15 to 20.75)
1592
(OG)
150805-Const/ Repr/ Reh/BTof Rahmabd chwk-Watky chwk,Main Gulkda,Sharifabd Quanj,Sharifabd Dheri,Hayatabd Internal,Shahidabd,Shahedabd frm DAEWO terml,Qambr bypas- Marghozar Twn,Bhrma Khwargi,sarinagar Twn,Yusafabd,Latifabd Mahronsh Twn,SKHA Clina,Landi K
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 199.99 168.302 40.929 16.329 16.329 16.329 184.631 0 100% 92%
May - 2021
Physically and Financially complete delete from Draft
No Image
1) Rahim Abad Chowk Amankot to Watkay Chowk road (3 Km)
2) Main Road Gulkada UC Gulkada (2 Km)
3) Sharif Abad to Qunj Road UC Gulkada (1 Km)
4) Sharif Abad to Dherai road UC Gulkada (350 mtr)
5) Hayatabad Internal roads UC Shahdara (1 Km)
6) Shahid Abad road (500 mtr)
7) Shaheed Abad road front of Daewoo Bus Terminal UC Rahim Abad (1 Km)
8) Qambar Bypass to Marghazar Town Road UC Rahim Abad (1 Km)
9) Barama Khwargai road UC Rang Mohallah (400 mtr)
10) Sarinagar Town UC Rang Mohallah (300 mtr)
11) Yousaf Abad road UC Banr (200 mtr)
12) Latif Abad road Mahronesh Town UC Banr (650 mtr)
13) Skha Chena road UC Amankot (325 mtr)
14) Landikass road UC Landikass
1593
(OG)
150817-Construction / rehabilitation/ BT of roads in UCs, Sakhra, Chuprial, Gwaleraiand, Asharay, District Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 1601.097 605.812 200 133 133 133 738.812 795.285 50% 46%
May - 2021
Length 54.95 Km & 01 Bridge (21 units) - Completed = 44 KM + Bridge
No Image
Part (A) Old work
1) Kotay to Deran Patay road (3 Km) (TS 32.393)
2) Hakeem Abad Damay road (1.50 Km) (TS 17.172)
3) Sardan road (2 Km) (TS 21.910)
4) Gamser road (2 Km)
5) Batkoo road (1 Km) (TS 10.376)
6) Azad Banda road (2.80 Km)
7) Kharkai Kot road (2 Km)
8) Mula Patay road (1.60 Km) (TS 21.524)
Part (B) New work
10
i. Package No. 1 (TS 32.545)
ii. Package No. 2  (TS 69.660)
iii. Package No. 3
11. Dandaral Road UC Chuprial 4.0 KM
12. Madyat Asharary Road UC Asharay 3.0 KM (TS 69.429)
13. Gora Painday Road 5.0 KM (TS 55.607)
14.  Qalagari Shakra Road U/C Sakhra (4.0 KM
15. Shukhdara Kandar Road U/C Chuprial 1.0 KM
16. Chuprial Katilai Road U/C Chupiral 1.0 KM (TS 1.657)
17. Garai Link Road U/C Sakhra 1.25 KM (TS 0.884 )
18. Narkat Asharary Road UC Asharary 2.0 KM
19. Jabray Road UC Asharary 1.0 KM
20. Gari Aweshah Road UC Chuprial 5 KM (TS 36.790)
21. Const: of Bridge at Shahuna Khwar UC Darmai
1594
(OG)
160645-Widening & Blacktopping of Sakra to Gabeen Jabba Road (12.55 Km) District Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 464.813 340.195 175.559 175.559 175.559 116 456.195 0 100% 98%
May - 2021
Length 12.5 Km - 9 km completed. Will be Complted by June 2021. No additional funds required.
No Image
PK-84, Swat
1595
(OG)
170177-Construction of Road namely Kohistangat Saidu Sharif to Loe Banr District Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 289.341 33.821 50 45 45 45 78.821 205.52 29% 27%
May - 2021
Earth work, Sub Base,S/S work in progress. Stay order vacated.
No Image
PK-80, 81  Swat
1596
(OG)
170180-Construction and Improvement of Sigram Bypass Road, Swat (3.25 Km)
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 174.76 36.978 50 5 5 5 41.978 87.782 50% 24%
May - 2021
Work order issued. Section - 6 sent to DC for approval.
No Image
PK-83, Swat
1597
(OG)
170568-Construction of 2 Km Bypass Road in Barikot District Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 199.896 81.63 30 80 80 55.96 137.59 88.266 56% 69%
May - 2021
Length 2.3 km + 2 briges - Road - E/W, retaining wall in progress Bridges - Grider casting in progress. Revised Dce for Rs. 249 m submitted for approval. Demand Rs. 50 M
No Image
PK-82, Swat
1598
(OG)
170669-Const of rd: Baryam, Nazrabad,Airport-Mamdhera,Gora-Tangai Shah,Totanu Bandai,Tangai Chena,Sigram,Mahak-Narngpura,Venai-Ochrai & Sijban-Sperdr,Reconst of rd Kalakaly-Nasrat Chk,Giga Shawr Gat-Landysr,Nasrtkhwr-Tarkani,Shalhand-Tarnkhwr,...Kndaw-Ska
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 850.101 511.517 100 130 130 130 641.517 238.584 72% 75%
May - 2021
03- Packages = 21 Units Length 38 out of 55 km completed.
No Image
Part (A) Old Work
1) Construction/BT of Beryum to Nazar Abad road (3 Km) Package-1
2) Construction/BT of Airport Mamdherai road (5 Km) Package-1
3) Construction/BT of Gorra Tangai Shah road (1 Km) Package-1
4) Construction/BT of Totano Bandai road (2 Km) Package-1
5) Construction/widening/BT of Tangai Cheena road (1 Km) Package-2
6) Improvement/widening/BT of Sigram Mehak Narangpura road (3 Km) Package-2
7) Construction/BT of Venai Ocharai road (3.5 Km) Package-2
8) Construction/BT of Sijbanr Sperdar road (4.275 Km) Package-2
9) Reconstruction of road Kalakalay to Nasrat Chowk (0.90 Km) Package-2
10) Reconstruction of Giga Tangbanr road (2 Km) Package-3
11) Reconstruction of Bara Bandai to Ghurijo road (2 Km) Package-3
12) Reconstruction of Shawargat Landaysar road (7.5 Km) Package-3
Part (B) New Work
1. Nasrat Khwar to Tarkanai Road 3 KM Package I
2. Nasrat Khwat to Tarkanai Road 2.4 KM Package II
3. Shalhand to Taran Khwar 3.5 KM
4. Taran to Drad us Stand Road 1.50 KM
5. Serai Chowk Dando Road 2.8 KM Package I
6. Serai Chowk Dando Road Package II
7. Kandaw Sekari Road 3 KM
8. Ashar Banr Road 1 KM
 
1599
(OG)
170670-Constructin of Roads in UCs: Barthna, Kharki, Dureshkhela, Sakhra, Darmai, Chuprial, Baidara, Asharay, District Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 981.238 607.17 200 290 290 145.917 753.087 174.068 82% 77%
May - 2021
Package-1, Package-2, Package-3, Package-4 & Package-5 work in progress on all packages. ( 29 units ). P-II : Balance funds.
No Image
1) Karenona Sakhra road (1.50 Km) Package-1 (TS 26.264)
2) Baidara Maqbara road (0.50 Km) Package-1
3) Kohistani Banda road (1 Km) Package-2 (TS 22.472)
4) Kuz Lalkoo road (0.50 Km) Pacakge-2
5) Toora Satta Bara Kharkai road, Sakhara (1.5 Km) Package-3
6) Bagh Sar road (1 Km) Package-3 (TS 23.465)
7) Matta Shomai Mandai Dag raod (1 Km) Package-4
8) Said Abad Chuprial road (1 Km) Package-4
9) Ragastoon road Darmai (1 Km) Package-4
10) Said Koma road Kakakot  (1 Km) Package-5
11) Madyat road Asharay (1 Km) Package-5
Part (B) Older Works
12 Kabal road UC Barthana 5 KM
13 Saidara Road UC Barthana 3 KM
14 Nallo Bodigram Road UC Baidara 1.5 KM
15 Kass Duraskhela to Brinjal Road 3 KM
16  Kharirai Park to Mandoor Road UC Matta Khariari 1 KM
17 Sinpora to Tangai Band UC Matta Kharirai 1 KM
18 Bazkhela Teetay Road UC Durashkhela 3 KM
19 Fazil Baig Road UC Sakhra 5 KM
20 Manza Sakhra Road UC Sakhra 3 KM
21 Rahat Kot Ragas Kota UC Darmai 3 KM
22  Rahat Kot to Janimar Road 3 KM
23 Hussain Abad Sorbat Road 2 KM
24 Kuza Bamakhela Road Uc Matta 1.5 KM
25
I Rahat to Sakhra Road UC Sakhra 10 KM Package I
ii  Package II
26 Nasapari Road 2 KM
27 Mandoor Road UC Matta 1 KM
28 Lek Patai Road UC Barthana 1 KM
29 Const: of PCC in Ucs Ashrary, Sakhra, Barthana, Durashekela, Baidara, Kharirai, Shuprial etc 9.6 KM
Part ( C) New works
1 Sabzi Mandi Road UC Matta 0.375 KM
2 Khyber Hotel Road UC Matta 0.225 KM
3 Bahadar Khan Road UC Matta 0.375 KM
4 Hanafi Hotel Road 0.10 KM
5 Hussain Abad Sorbat Road (Balance work) 1 KM
6 Kass Durashkhela to Brinjai Road (Balance work) 0.650 KM
7  Dandarai Road UC Barthana (Balance work) 0.40 KM
1600
(OG)
190459-Construction/ Rehabilitation/ Widening/ PCC/ BT of internal roads in UCs Sakhra, Darmai, Ashray, Durushkhela, Baidara, Khairari, Chuprial, Barthana & adjoining areas of District Swat..
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 1999.983 0 200 537 537 537 537 1799.983 10% 27%
May - 2021
42 Packages Work in progress on all units.
No Image
Package I
Package 2
Package 3
Package 4
Package 5
Package 6
Package 7
Package 8
Package 9
Package 10
Package 11
Package 12
Package 13
Package 14
Package 15
Package 16
Package 17
Package 18
Package 19 (TS 50.879)
Package 20
Package 21
Package22 (TS 23.680)
Package 23
Package  24
Package 25
Package 26 (TS 36.382)
Package 27
Package 28
Package 29
Package 30
Package 31
Package 32 (TS 24.675)
Package 33
Package 34
Package 35
Package 36 (TS 44.952)
Package 37
Package 38
Package 39
Package 40
Package 41
Package 42
Part (B) New Works
1 Kamr Gala top Noorani Masjid Kanwo 2 KM
2 Sindanai to Dandarai Road 2 KM
3 Sindano Road 2 KM
4 Telia to Dalo Masjid Road 1.5 KM
5 Main Road Shahona to Loi Masjid Road 2 KM
6 Const: of Retaining wall at Muslim Abad Soorbat, Charai, Mandoor & Kohistan Banda Road 0.400 KM
7 Janimar Road to Ragastoon 2.5 KM
8 Kamran Chinar Road 0.40 KM
9 Charai Bar Mandoor road 0.50 KM
10 Bara Kharkai Chamanary Road 2 KM
11 Garband Masjid & Drab Jai Shekhan Road
12 Azad Banda Barogai Road 2 KM
13 Shorogara Mairamai Road 1. 6 KM
14 Bankara to Jaberai Road 2 KM
15 Soray Road 2.5 KM
16 Dagari Bazkhela Internal Link road 1.10 KM
1601
(OG)
190509-Construction/ Rehabilitaion and repair of roads in Tehsil Kabal District Swat.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 1000 0 50 225 225 225 225 950 5% 23%
May - 2021
13 - Units Work in progress on all units.
No Image
Part (A) Old Work
1 Deolai Sarkhazana raod 4 km (TS 54.148)
2 Package I Totano Bandai to Ghakhi Banda 3 km
3 Package II Totano Bandai to Ghakhi Banda 3 km
4 Janazgah Road Kabal Village 1 KM & Guljiba Kandaro Road 2 Km
5 Hazara Tootbanri Road 2 km (TS 29.374)
6 Banda to bela road 2 km
7 shalhand to tagma road 2 km & Chinaclay to shalhand road 1.5 km
8 Kalakalay to Nasrat Road 3 km (TS 40.327)
9 Akhoon kalay to Melaga road 4 km
10 Malooka to Asho Barai Narang Pora road 2 km
11 Dhero to Damber Road 1 kM &  Tango Peouchar road 1.2 km
12 Totani Bandai road 3 km
13  Totani Bandai to Ghakhi Bandai Package 1 KM 01 to 03 Balance work
14 Totano Bandi to Ghaki Bandai Package II Km 04 to 06 (3 km balnce work
15 Hazara tootbanri road
16 kalakalay to Nasrat ROad
17 Malooka to Ashor Bari Narang Pora
18 Totano Bandai Road 3 KM
Part (B) New Work
1 Dhero to Khemdara Road 3 Km
2 Kara to Godha Road 3 KM
3 Kotlai Melagah rd 4 KM
4 Mulano Cham Road 1 KM
5 Sherifey Road 1.75 KM
6 Sarbala to Shagai Road 2 Km
7 Sarbalal to Shagai Road 2 KM
8 Talib Shaheed i/c Hospital Road 1.2km
9 Kalakalay to Mahak road 3 Km
10 Kuza Bandai to Ghwarija Road 2 KM
1602
(OG)
190517-Const of Rds Sorpatu-Shunyal-Talkr, JafarAbad-Cheno Barai, Mato Shomi Rd, Salend Sardan Rema Dando Rd, Sherpalm-Amlok Banr rd Gwalri-Kwaro Cham Kamrtai Balirkis a/w Bridge, Sarbnda Dop rd, Dero Zyartkhpa rd, Weni Dagi Manro Paty rd, Nilagram rd. S
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 480.622 0 50 70 70 70 70 430.622 10% 15%
May - 2021
10 - Units- Earth work, Sub Base & Structure work in progress.
No Image
1 Surpatu to Shunyal to Talkar Road 2 KM
2 Jafar Abad to Cheeno Barrai Road 5 km
3 Mato Shomi/ Charma Kandawgai Road 3 km
4 Salend to Sardan, Rema Dando Road 5 km
5 Sher Palam to Amlook Banr road 2 km
6 Gwalerai to Kwaro cham kamtalai, balirkass road  3km
7 Sarbanda to Dop Dero Zyarat Kha road 7 km
8 Wenai Dagai to Manro Patati Road  4 km
9 Nilagram Road  4km
 
1603
(OG)
190572-Const of Rds Pya Chnchry Rd, Kedm-Gorni Rd,Bdali-Dbrgy rd, Ayn-Ashoka rd,Behran-Gantr Rd,Bshigrm Deri-Kardial Rd,Mshigl (Bagh Deri),Alrgly (Bahran) Rd,Barani Rd(Mdyn),Droli(Bahran) Brdg,Kuza Aryni(Bodai Kmar) Brdg,Osho(Motli) Brdg,Ayn(Bahran) Brdg,
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 781.03 0 50 110 110 110 110 731.03 6% 14%
May - 2021
14- Components Earth work, Sub Base & Structure work in progress.
No Image
1 Peya Chancharary road 4 km
2 Kidam Gurani road  5km
3 A;ar Ga;aro IC Behrain 5km
4 Badalai Dabargary Road 6 km
5 Ayin to Ashoka road 3 km
6 Behrain to Gamtar road 4 km
7 Bashigram Dherai to Kardial road 3 km
8 Mashigi (Baghderai) road 4 km
9 Bravee U/C Madyan road 4km
10 Darolai (Behrain) Bridge
11 Kuza Aryani (Bodai Kamra) Bridge
12 Osho (Motali) Bridge
13 Ayin (Behrain) Bridge
 
1604
(OG)
190574-FS and Design of road from Odigram to Guligram, Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 8 0 20 1.6 1.6 0 0 0 100% -
May - 2021
PC-II approved for Rs.8 m. Survery for Studying Feasibility in progress. EIA report sent to Director General EPA Peshawar. Dce for Rs. 700 M under preparation. Cannot be complted as the construction phase will be included in this ADP
No Image
FS and Design of road from Odigram to Guligram, Swat
1605
(OG)
190576-Construction of roads a) Kandak - Jehangir Malikdam Road Barikot, b) Rangilla Shamozai to Segawali, c) Talang-Churkhai, d) Najigram - Samsari, District Swat
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 300 0 40 68 68 65.323 65.323 260 13% 22%
May - 2021
4 - Units- Earth work, Sub Base, B/Course & Structure work in progress.
No Image
1 Const: of kandak Jehangir Malkidam Road Barikot 4.5 Km
2 Package I Const: of Rangila Shamozai to Sewgalai Road Km 1 to 5
3 Package 2 Const: of Rangila Shamozai to Swegalai road KM 4 to 6
4 Talang-Churkhai Road  2 km and Najigram Samsari Road 1 Km
 
1606
(OG)
140830-F/S, Design & Construction of BT roads a) Mian Kalay to Kambat, b) Link road to Ghwara Banda, Gawardesh, Janpassa, Parata, Nawkoto and Hisarak District Dir (Lower).
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 1210.57 316.956 50 60 60 54.573 371.529 843.614 30% 31%
May - 2021
07 Units 03 Units Completed 04 Units in progress Total 13/18 KM completed Demand Rs: 15 M
No Image
1) Mian Kalay to Kambat
2) Link road Ghwara Banda
3) Link road Gawardesh
4) Link road Janpassa
5) Link road Pratta
6) Link road Nawo Koto
7) Link road Hisarak
1607
(OG)
140900-F/S, Design, Improvement & BT of Kumber to Gumbat Banda Road (15 Km) Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 162.54 97.249 50 40 40 40 137.249 15.291 91% 84%
May - 2021
Length 18 Km - Completed 9 KM In progrtess 9 KM Demand Rs: 15 M
No Image
1) Package-1
2) Package-2
3) Package-3
4) Package-4
1608
(OG)
140901-F/S, Design & Construction of Talash Kalpanai Bypass road (10 Km), Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 683.495 347.949 50 50 50 50 397.949 285.546 58% 58%
May - 2021
03- Packages Land acquisition completed Earth & Sub base work in progress. TS under prep by Consultant Demand Rs; 30 M
No Image
1) Package-1 (3 Km)
2) Package-2 (3 Km)
3) Package-3 (4 Km)
1609
(OG)
140989-F/S, Design and Construction of 4 Nos. of RCC Bridges a) Aghiraly and Arif b) Darangal Khwar c) Markhanai Maidan, Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 174.826 166.84 8.784 8.784 8.784 8.784 175.624 0 100% 100%
May - 2021
Out of 4 bridges, 2 completed. 2 in progress. Cannot be completed revised PC-I submitted to P&D Departt:
No Image
1) Agherlay bridge
2) Arif Kalay bridge
3) Darangal Khwar bridge
4) Markhanai Maidan bridge
1610
(OG)
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano,Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 450.485 109.737 15 15 15 15 124.737 325.748 28% 28%
May - 2021
06- Components. Munjai Bridge - working pile in progress. Demand Rs: 15 M
No Image
1) RCC Bridges in Dir Lower (4 Nos)
2) RCC Bridge at Munjai (210 mtr)
3) Haji Abad (210 mtr)
4) Nasafa (140 mtr)
5) Kano (70 mtr)
1611
(OG)
150837-Construction & Black Topping of Gudhar Takurro road UC Munda and Danjarri to Ijjara, Nawey Kallay, Bota & Qaziabad Tatar road Dir Lower
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 199.796 128.344 15 30 30 30 158.344 56.452 72% 79%
May - 2021
Length 12 Km - work in progress on all 6 units.
No Image
1) Gudar road
2) Takurro road
3) Denjarai to Ijara road
4) Naway Kalay road
5) Bota road
6) Qazi Abad Tatar road
1612
(OG)
150838-Construction of RCC bridges Raidgay (Kotkay) & Gul Khawarr Maidan Dir Lower
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 190.549 87.251 20 20 20 20 107.251 83.298 56% 56%
May - 2021
02/02 units Work in progress Girdar & 4 pilers completed.
No Image
1) RCC Bridge at Raidgay (Kotkay) PK-96 (span 210 mtr)
2) RCC Bridge at Gul Khawar MaidanPK-96 (span 35 mtr)
1613
(OG)
150839-Const of a) Swat-Asbarn road, Asbarn-Shursheen and Rabial Ghazijatt pat road, Doga Gaz Dara Khadagzai road, Gulabad Asbarn road Khairabad kotigram laram road Khadagzai link road Chakdara Kamala Raod (Badwan), Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 550 299.673 10 28.557 28.557 28.577 328.25 240.327 56% 60%
May - 2021
21 Units (30 KM Total Length) 10 units (19 KM) completed. 06 Unit in progress. P-II Demand Rs: 60 M
No Image
1) Swat Asbanr road
2) Asbanr Shorshing road
3) Ramial Ghazo road
4) Chat Pat road
5) Jawro Kashmir road (2 Km)
6) Osakai road (1 Km)
7) Liko road (1 Km)
8) Nawa Kalay Bochake road (2 Km)
9) Ramora Dara road (1.8 Km)
10) Hamza Banda road (1 Km)
11) Asbanr Ali Dadai road (1 Km)
12) Asbar But Qilla Shadam road (1 Km)
13) Donga Kass-Kasai road (1 Km)
14) Brimkay road (1 Km)
15) Dherai Tesso Khunano Baba road
16) Doga Ghaz Dara road (1 Km)
17) Gul Abad Asbanr/Shah Alam Baba road (3 Km)
18) Khair Abad Kotigram Laram road (2 Km)
19) Khadagzai link/Obokhwar Shaheed road (1.65 Km)
20) Chakdara Kamal Badwan road (3 Km)
21) Swat Asbanr Raghbanai road (3 Km)
1614
(OG)
150963-Const/Reh: of roads Pato Atak & Bari kot, Rbt Asegay Larm Danda, Sarbnda, Dod Khana, Shati, Mali, Watngay, Mlknd Kohry, Gadla, Banda, Kram Khel, Spary, Danwa, Rani & Ghwago, Khungi SaroGai, Dehri Shagai Talash,Asegay Rbt,Malai rd, Safary Mlknd, Dir
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 369.278 318.233 10 29 29 12.572 330.805 41.045 89% 90%
May - 2021
17 units Completed 16 Units 01 in progress Length 30 Km - 12 Km BT, work in progress in progress. Demand Rs: 40 M
No Image
1) Patto Attak road
2) Bari Kot road
3) Rabat Assigay road
4) Laram Danda road
5) Sar Banda road
6) Dood Khana road
7) Malai road
8) Watangai road
9) Gadala road
10) Malakand Kohery road
11) Karam Khail Malakand road
12) Safarai Malakandroad
13) Danwa road
14) Ghawgo Siar road
15) Rani road
16) Banda road
17) Shatay road
1615
(OG)
150964-Const/ Reh: of roads Shaney, Masho-Chinarona, Banda Khonko Cheno Dhery, Chinar Tangy, A/Gali, Macho, Katon, Gumbat AmlokDara, ChamanAbad, SeyarGay, Yar Khan Banda & Nagri-Gumbat Kay, Anangro Khwr&Hajiabad, Banda Mlknd, Otala Manzai, Asselo Rbt, Dir
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 367.574 298.335 10 11 11 11 309.335 59.239 84% 84%
May - 2021
Length 31 Km (20 units) - 12 Km BT completed, P-II : balance funds
No Image
1) Shaneey road
2) Mashoo road
3) Chinarono road
4) Banda road
5) Chinoo road
6) Dehrai road
7) Chinar Tangai road
8) Machoo road
9) Gumbat road
10) Katan road
11) Khonako road
12) Ahmad Galai road
13) Amlook Dara road
14) Siar Gatt road
15) Chaman Abad road
16) Yar Khan Banda road
17) Nagrai road
18) Gumbat Gai road
19) Anangoro road
20) Haji Abad road
1616
(OG)
150965-Construction/ Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 275.308 126.672 10 11.5 11.5 11.5 138.172 138.636 50% 50%
May - 2021
18 Units Completed 05 Units (5.6 KM) Length 20.6 Km - 3 Km BT completed. Demand Rs. 30 M
No Image
1) Construction/BT of Raindlay road UC Miskini
2) Construction/BT of Kakass road UC Miskini
3) BT of Zardar Banda raod UC Mayar
4) BT of Markhano to Nasir road UC Mayar
5) BT of Adam Shah and Juni Kalay road UC Mayar
6) BT of Khwar to Inzaro (Chaghrabs) road UC Mayar
7) BT of Pattan to Batoro raod UC Mayar
8) BT of Jabagai to Batoro road UC Mayar
9) Construction of PCC road Khara UC Kambat
10) Construction of PCC road Gatano UC Kambat
11) BT of Mandizo Damtal Malkano road UC Kambat
12) BT of Damtal Nekhan Bandaroad UC Kambat
13) BT of Asharkore Bala road UC Samarbagh
14) Construction of PCC road Shontala UC Samarbagh
15) BT of Gular road UC Samarbagh
16) BT of Qashodali road UC Samarbagh
17) BT of Dandono road UC Samarbagh
18) BT of Tatar Bala and Gul Dherai road UC Samarbagh
1617
(OG)
150966-Construciton of RCC Bridges at approach road Matako Rahim Abad, Shukarta Mayar Bridge, Dir Lower.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 170 82.96001 10 10 10 10 92.96001 77.04 55% 55%
May - 2021
02 Units Strcture work completed approches in progress Length 110 mtr - piling completed, pile caping completed. Demand Rs: 15 M
No Image
1) Construction of RCC Bridges at approach road Matako Rehim Abad (span 140 mtr)
2) Shukarta Mayar Bridge, Dir Lower (span 210 mtr)
1618
(OG)
150967-Construction of roads from Odigram to Haya Sairay, Odigram to Lajbook & Shahko, Kadh road and Shudas to Fazal Abad, Maimai road, Kumbatar to Burkhanay Nambaty Dir Lower
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 278.061 230.713 27.348 27.348 27.348 27.347 258.06 20 93% 93%
May - 2021
Length 20 (6 units) - 3 Km BT completed, 17 Km in progress. P-II
No Image
1) Odigram to Hayaserai road
2) Odigram to Lajbook road
3) Kadh to Shahko road
4) Shahko to Lajbook road
5) Shadas to Fazal Abad Meramai road
6) Kumbar to Burkhanay Nambatai road
1619
(OG)
170573-Construction/ Rehabilitation of Road Bakht Bilanda, Atack, Nagrai Payeen, Pangral Shati Chinar, Kano Ghumbat Kai and Zual Baba Hajiabad Road Asilo District Dir Lower
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 174.85 46.5 20 20 20 20 66.5 108.35 38% 38%
May - 2021
10 Units (12.8 KM) Completed 07 units (8.8 KM) In progress 4 KM Sub base, base course, shoulder, earth work in progress Demand Rs: 20 M
No Image
1) Bakht Biland road (2 Km)
2) Attack road (2 Km)
3) Nagrai Payeen road (1 Km)
4) Pingal road (2 Km)
5) Shatai road (2 Km)
6) Chinar road (1 Km)
7) Kano Gumbat Kai road (1 Km)
8) Zual Baba road (1 Km)
9) Haji Abad road (0.8 Km)
10) Asilo road (1 Km)
1620
(OG)
190450-Construction of Chakdarra Bypass Road (6 Km), Dir Lower
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 448.952 25 50 79 79 79 104 373.952 17% 23%
May - 2021
02 Units (6 KM) all in progresss E/Work 85 % completed S/Work 35% completed. Demand Rs: 165 M Cost of land to be paid 160.770 M
No Image
Package 1
Package 2
1621
(OG)
100382-Construction of Sairay Kalkot to Thall Kumrat road, 10-km ,Dir Upper
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 255.368 178.804 20 15 15 0 178.804 56.564 78% 70%
May - 2021
Original scope - 10 Km (PCC 14 ft wide) - complete. Revision in progress. Snow Bound TS submitted to CE
No Image
PK-92 Dir Upper (Km-1 to 10)
1622
(OG)
140903-Construction of PCC Road Samang Gulwadai Dara and Shaoor, District Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 300 70.308 40 40 40 36.961 107.269 189.692 37% 36%
May - 2021
Length 10 Km - cutting of 10 Km completed. Demand RS. 40 M Liability
No Image
Dir Upper (Km-1 to 10)
1623
(OG)
140905-Construction, Widening and BT of Usherai Dara and its missing links, Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 450 124.608 40 50 50 45 169.608 285.392 37% 38%
May - 2021
Length 10 Km - 4 Km BT completed. Demand RS. 60 M Liability
No Image
Package-1 (Km-1 to 5)
Package-2 (Km-6 to 10)
1624
(OG)
140906-F/S, design and Widening & Rehabilitation of Nehagadra road, (Phase-I) (27 km) Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 380.856 243.247 100 100 100 61.467 304.714 37.609 90% 80%
May - 2021
Length 27 Km - cutting of 27 Km completed, WBM in progress.
No Image
PK-93, Dir Upper (Gogyalto Karpat Abla 27 Km)
1625
(OG)
140979-F/S & Design of a) Improvement & Rehabilitation of Dodba to Sheringal Swany Road (15 KM) including 3 Nos Bridges, b) Construction of RCC Bridge at Kotkay UC Sultan Khel District Dir Upper
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 597.77 263.48 30 36 36 36 299.48 304.29 49% 50%
May - 2021
Length 31.75 Km - ew 80 % COMPLTED , Structure Work 30 % . Road Work Started. Deamnd Rs. 40 m liability Demad Rs. 50 M
No Image
1) PK-91, Dir Upper (17.75 Km road)
2) RCC bridge Kotkay
1626
(OG)
150827-a) Rehabilitaiton/ Reconstruction of roads Ala Salamkot, Dobando Dara, Nasrat Dara, Darora sharamkand & b) Const of Maj General Sanullah Shaheed road at Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 393.737 179.558 30 34 34 34 213.558 184.179 53% 54%
May - 2021
5 units - work in progress. Demand Rs. 40 M Liability
No Image
1. Ala Salamkot Road (06 Km)
2. Dobando Dara Road (10 km)
3. Nusrat Dara Road (9.80 Km)
4. Sharamkand Raod (4 Km)
5. Maj. General Sanaullah Shaheed Road (02 km)
1627
(OG)
150829-Rehabilitation/ Reconstruction of a) RCC roads Kumrat, Badgoai & Jandrai Road b) Doag Dara, Usorai Dara, Kadi Khel Dara Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 325.5 115.081 50 50 50 20.877 135.958 160.419 51% 42%
May - 2021
6 units (34.5 Km) - all in progress.
No Image
1) Kumrat road (8 Km)
2) Badgoai road (7 Km)
3) Jandrai road (4.5 Km)
4) Doog Dara road (7 Km)
5) Osorai Dara road (4 Km)
6) Kadi Khel Dara road (4 Km)
1628
(OG)
150833-Rehab/Reconstn of Sultan Khail Dara (left & right), Roghano Darra, & Karro Darra road (left & Right), Lugman Banda via Adhokay and Safaray Qamar Tall Distt: Dir Upper.
Dir Lower
HW
30-11--1 30-11--1 - 30-11--1 - 122.898 16.337 7.009 7.009 7.009 7.009 23.346 99.552 19% 19%
May - 2021
04 Units (10 KM) all in progress Demand: Rs: 25 M
No Image
1 Lukman Banda Adhokay Payeen and Bala Road
2 Luqman Banda Safary Road
3 Luqman Banda Man and Kamar Tall Road
4 Luqman Band Road
1628
(OG)
150833-Rehab/Reconstn of Sultan Khail Dara (left & right), Roghano Darra, & Karro Darra road (left & Right), Lugman Banda via Adhokay and Safaray Qamar Tall Distt: Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 336.821 65.293 7.991 7.991 7.911 7.911 73.204 263.537 22% 22%
May - 2021
Work in progress. Demand Rs. 15 M
No Image
1628
(OG)
150833-Rehab/Reconstn of Sultan Khail Dara (left & right), Roghano Darra, & Karro Darra road (left & Right), Lugman Banda via Adhokay and Safaray Qamar Tall Distt: Dir Upper.
Provincial
30-11--1 30-11--1 - 30-11--1 - 336.821 65.362 15 15 15 0 65.362 0 - -
May - 2021
No Image
1629
(OG)
150988-Construction of RCC Bridges at Swausar Kasai, Gulibagh & Sromanzai Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 157.708 10 15 15 15 10.385 20.385 132.708 16% 13%
May - 2021
3 units -2 unit Work in progress. 1 units - Site dispute
No Image
1) Swauser Kasai
2) Gulbagh
3) Sromanzai
1630
(OG)
151076- Construction of Nehag Dara Road (Phase-II) District Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 200 173.151 24.5 24.5 24.5 0 173.151 2.349 99% 87%
May - 2021
Length 13 Km - earth work completed. Cannot be Completed. Contractor Served Notice for resind.
No Image
PK-93, Dir Upper (13 Km)
1631
(OG)
190564-Construction/ BT/Rehabilitation/ widening of sultan khel darra roads, chapper dara roads, karro dara roads (L/R) bandai serai arrimanzai road, galkorr karbadai via shalgah road and construction of RCC bridge at village sadiq abad wari Dir Upper.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 120 0 50 50 50 36.05 36.05 70 42% 30%
May - 2021
Work in progress.
No Image
1632
(OG)
140984-F/S, Design and Construction of RCC Bridge at Ayun, Chitral.
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 99.592 87.657 11.872 11.872 11.872 8.3374 95.9944 0.063 100% 96%
May - 2021
RCC Bridge - completed . Delete fraom Draft ADP
No Image
RCC Bridge at Ayun, Chitral.
1633
(OG)
150824-Construction/ rehabilitation/ widening/ completion of incomplete Molkoh road,Boni bridge to Boni Bazar via Bazar to Government Guest House in Tehsil Mastuj District Chitral
Chitral Upper
30-11--1 30-11--1 - 30-11--1 - 125.302 85.458655 34.428 34.428 34.428 9.354 94.812655 5.415 96% 76%
May - 2021
Length -03Km E/W completed, S/B, WBM in progress. Cannot be complted due to the installation of the asphlat plant.
No Image
1) Construction of incomplete Mulkow road
2) Boni Bridge to Boni Bazar Chowk
3) Boni Bazar Chowk to Govt Rest House road
1634
(OG)
150844-Construction/ widening of roads Varijun to Terich, Jinjarit to Jinjarit Koh and Kosht to Loan District Chitral.
Chitral Lower
30-11--1 30-11--1 - 30-11--1 - 423.018 86.064 46 46 46 31.804 117.868 290.954 31% 28%
May - 2021
E. W , cutting in progress Bridge- Piling in progress. Demand Rs. 10 M
No Image
1634
(OG)
150844-Construction/ widening of roads Varijun to Terich, Jinjarit to Jinjarit Koh and Kosht to Loan District Chitral.
Chitral Upper
30-11--1 30-11--1 - 30-11--1 - 76.888 57.481 15 15 15 13.217 70.698 4.407 94% 92%
May - 2021
Scheme complted. Delete from Darft ADP.
No Image
1 Warijan Terich ROad
2 Kosht to Lone Road