Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 60 | 20 | 20 | 20 | 0 | 60 | 8.837 | 90% |
68% December - 2020 |
02- Units
Foundation in progress
TS Submitted to SE for Rs. 68.644 M |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 60 | 20 | 20 | 20 | 0 | 60 | 8.837 | 90% |
68% December - 2020 |
02- Units
Foundation in progress
TS Submitted to SE for Rs. 68.644 M |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 60 | 0 | 0 | 0 | 0 | 60 | 28.837 | - |
68% October - 2020 |
02- Units Site not handed over. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 60 | 0 | 0 | 0 | 0 | 60 | 28.837 | - |
68% September - 2020 |
02- Units Site not handed over. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 0 | 30 | 30 | 30 | 24.239 | 0 | 0 |
May - 2021 |
02- Units
1. Plaster in progress
2. Plaster in progress |
No Image | |
1 Reha: of Sub Jail Khar
2 Reha: of Sub Jail Nawagi | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 0 | 30 | 30 | 30 | 20 | 0 | 0 |
April - 2021 |
02- Units
Foundation in progress
TS Submitted to SE for Rs. 68.644 M |
No Image | |
1 Reha: of Sub Jail Khar
2 Reha: of Sub Jail Nawagi | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 0 | 20 | 20 | 20 | 18.513 | 0 | 0 |
March - 2021 |
02- Units
Foundation in progress
TS Submitted to SE for Rs. 68.644 M |
No Image | |
1 Reha: of Sub Jail Khar
2 Reha: of Sub Jail Nawagi | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 0 | 20 | 20 | 20 | 9.815 | 0 | 0 |
February - 2021 |
02- Units
Foundation in progress
TS Submitted to SE for Rs. 68.644 M |
No Image | |
1 Reha: of Sub Jail Khar
2 Reha: of Sub Jail Nawagi | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Bajaur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 88.837 | 60 | 20 | 20 | 20 | 0 | 60 | 8.837 | 90% |
68% January - 2021 |
02- Units
Foundation in progress
TS Submitted to SE for Rs. 68.644 M |
No Image |
1 Reha: of Sub Jail Khar
2 Reha: of Sub Jail Nawagi | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 45.074 | 60 | 0 | 0 | 0 | 0 | 60 | 0 | - |
100% October - 2020 |
03- Units
1- Rehab: work started.
2- Work order issued.
3- Rehab: work started. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 45.074 | 60 | 0 | 0 | 0 | 0 | 60 | 0 | - |
100% September - 2020 |
03- Units
1- Rehab: work started.
2- Work order issued.
3- Rehab: work started. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 45.074 | 60 | 0 | 0 | 0 | 0 | 60 | 0 | - |
100% August - 2020 |
03- Units
1- Rehab: work started.
2- Work order issued.
3- Rehab: work started. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Khyber |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 159.57 | 60 | 0 | 0 | 0 | 0 | 60 | 99.57 | - |
38% July - 2020 |
Work started. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 60 | 0 | 0 | 0 | 0 | 60 | 0 | - |
100% October - 2020 |
02 Units.
Work in progress. |
No Image |
1) Sub Jail Para Chinar
2) Sub Jail Sadda | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 60 | 0 | 0 | 0 | 0 | 60 | 0 | - |
100% September - 2020 |
02 Units.
Work in progress. |
No Image |
1) Sub Jail Para Chinar
2) Sub Jail Sadda | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 60 | 0 | 0 | 0 | 0 | 60 | 0 | - |
100% August - 2020 |
02 Units.
Work in progress. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 60 | 300 | 0 | 0 | 0 | 60 | 0 | 100% |
100% July - 2020 |
Work started. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 0 | 14.961 | 14.961 | 14.961 | 0 | 0 | 0 |
May - 2021 |
01- Unit
Tube well Completd & Rehab: in progress, Type-III Residence Finishing |
No Image | |
1) Sub Jail Para Chinar
| |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 0 | 36 | 36 | 36 | 36 | 0 | 0 |
April - 2021 |
02 Units.
1 Tube well Completd & Rehab: in progress
2 Rehab: in progress & Type-III Residence Finishing |
No Image | |
1) Sub Jail Para Chinar
2) Sub Jail Sadda | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 0 | 36 | 36 | 36 | 36 | 0 | 0 |
March - 2021 |
02 Units.
1 Tube well Completd & Rehab: in progress
2 Rehab: in progress & Type-III Residence Finishing |
No Image | |
1) Sub Jail Para Chinar
2) Sub Jail Sadda | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 0 | 36 | 36 | 36 | 27.572 | 0 | 0 |
February - 2021 |
02 Units.
1 Tube well Completd & Rehab: in progress
2 Rehab: in progress & Type-III Residence Finishing |
No Image | |
1) Sub Jail Para Chinar
2) Sub Jail Sadda | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Kurram |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 57.629 | 60 | 36 | 36 | 36 | 27.572 | 87.572 | 0 | 100% |
100% January - 2021 |
02 Units.
Work in progress. |
No Image |
1) Sub Jail Para Chinar
2) Sub Jail Sadda | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 7 | 7 | 7 | 0 | 0 | 21.075 | 25% |
- December - 2020 |
work order issued. Auction and dismentling of existing building under process. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 7 | 7 | 7 | 0 | 0 | 21.075 | 25% |
- December - 2020 |
work order issued. Auction and dismentling of existing building under process. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 7 | 7 | 7 | 0 | 0 | 21.075 | 25% |
- October - 2020 |
work order issued. Auction and dismentling of existing building under process. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 7 | 7 | 7 | 0 | 0 | 21.075 | 25% |
- September - 2020 |
work order issued. Auction and dismentling of existing building under process. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 0 | 0 | 0 | 0 | 0 | 28.075 | - |
- August - 2020 |
work order issued. Auction and dismentling of existing building under process. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 14.035 | 14.035 | 14.035 | 0 | 0 | 14.04 | 50% |
- May - 2021 |
02 Units
1 Main building upto DPC level
2 Site not handed over |
No Image |
1 Sub Jail at Ghallanai
2 Sub Jail at Ekkaghund
Scope of work:
| |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 14.035 | 14.035 | 14.035 | 3.252 | 3.252 | 14.04 | 50% |
12% April - 2021 |
02 Units
1 Main building upto DPC level
2 Site not handed over |
No Image |
1 Sub Jail at Ghallanai
2 Sub Jail at Ekkaghund | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 14.035 | 14.035 | 14.035 | 3.252 | 3.252 | 14.04 | 50% |
12% March - 2021 |
02 Units
1 Main building upto DPC level
2 Site not handed over |
No Image |
1 Sub Jail at Ghallanai
2 Sub Jail at Ekkaghund | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 14.035 | 14.035 | 14.035 | 0 | 0 | 14.04 | 50% |
- February - 2021 |
02 Units
1 Main building upto DPC level
2 Site not handed over |
No Image |
1 Sub Jail at Ghallanai
2 Sub Jail at Ekkaghund | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Mohmand |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.075 | 0 | 7 | 7 | 7 | 0 | 0 | 21.075 | 25% |
- January - 2021 |
work order issued. Auction and dismentling of existing building under process. |
No Image |
1 Sub Jail at Ghallanai
2 Sub Jail at Ekkaghund | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% December - 2020 |
Site indentification is awaited. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% December - 2020 |
Site indentification is awaited. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% October - 2020 |
Site indentification is awaited. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% September - 2020 |
Site indentification is awaited. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% August - 2020 |
Site indentification is awaited. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% July - 2020 |
Site indentification is awaited. |
No Image |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 0 | 8 | 8 | 8 | 0 | 0 | 0 |
May - 2021 |
site recently identified |
No Image | |
Lookup at Mir Ali NWA | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 0 | 8 | 8 | 8 | 0 | 0 | 0 |
April - 2021 |
site recently identified |
No Image | |
Lookup at Mir Ali NWA | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 0 | 8 | 8 | 8 | 0 | 0 | 0 |
March - 2021 |
site recently identified |
No Image | |
Lookup at Mir Ali NWA | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 0 | 8 | 8 | 8 | 0 | 0 | 0 |
February - 2021 |
site recently identified |
No Image | |
Lookup at Mir Ali NWA | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
North Waziristan |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 21.939 | 20 | 0 | 0 | 0 | 0 | 20 | 1.939 | - |
91% January - 2021 |
Site indentification is awaited. |
No Image |
Lookup at Mir Ali NWA | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 24.948 | 0 | 5 | 5 | 5 | 2.176 | 2.176 | 19.948 | 20% |
9% May - 2021 |
02 units - all in progress |
No Image |
1 Sub Jail Head Quarter Baber Mela
2 Sub Jail Kalaya | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 24.948 | 0 | 5 | 5 | 5 | 2.176 | 2.176 | 19.948 | 20% |
9% April - 2021 |
02 units - all in progress |
No Image |
1 Sub Jail Head Quarter Baber Mela
2 Sub Jail Kalaya | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 24.948 | 0 | 5 | 5 | 5 | 2.176 | 2.176 | 19.948 | 20% |
9% March - 2021 |
02 units - all in progress |
No Image |
1 Sub Jail Head Quarter Baber Mela
2 Sub Jail Kalaya | |||||||||||||||||||
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 24.948 | 0 | 5 | 5 | 5 | 2.176 | 2.176 | 19.948 | 20% |
9% February - 2021 |
02 units - all in progress |
No Image |
1 Sub Jail Head Quarter Baber Mela
2 Sub Jail Kalaya | |||||||||||||||||||
1061 (New) |
180589-Feasibility Study on Khyber Pakhtunkhwa Rural Roads Improvement & Rehabilitation Project (JICA Assisted) (Phase-II). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | Line Deptt | 10 | 0 | 5 | 5 | 0 | 0 | 0 | 0 | - |
- December - 2018 |
No Image | |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 817.59 | 60 | 300 | 300 | 0 | 0 | 60 | 0 | - |
- December - 2020 |
No Image | |
1061 (OG) |
195237-Improvement of existing Political lockups (Sub Jails) and providing Arms & Ammunitions along with other necessary equipments (AIP) |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 817.59 | 60 | 300 | 300 | 0 | 0 | 60 | 0 | - |
- December - 2020 |
No Image | |