1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.81 | 20 | 20 | 15 | 0 | 10.81 | 69.19 | 31% |
11% December - 2018 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14594.25 | 12652.99 | 159.997 | 75.7 | 0 | 0 | 12652.99 | 1781.263 | 88% |
87% December - 2018 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
18 districts of Khyber Pakhtunkhwa Upto till Release Jan-2016 Rs.1304.09 m | |||||||||||||||||||
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.81 | 20 | 20 | 15 | 0 | 10.81 | 69.19 | 31% |
11% November - 2018 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14594.25 | 12652.99 | 159.997 | 159.997 | 0 | 0 | 12652.99 | 1781.263 | 88% |
87% November - 2018 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
18 districts of Khyber Pakhtunkhwa Upto till Release Jan-2016 Rs.1304.09 m | |||||||||||||||||||
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.81 | 20 | 20 | 15 | 0 | 10.81 | 69.19 | 31% |
11% November - 2018 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14594.25 | 12652.99 | 159.997 | 159.997 | 0 | 0 | 12652.99 | 1781.263 | 88% |
87% November - 2018 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
18 districts of Khyber Pakhtunkhwa Upto till Release Jan-2016 Rs.1304.09 m | |||||||||||||||||||
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 100 | 10.81 | 20 | 20 | 15 | 0 | 10.81 | 69.19 | 31% |
11% January - 2019 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
1042 (OG) |
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted). |
F. Aided PMU |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 14594.25 | 12652.99 | 159.997 | 75.7 | 0 | 0 | 12652.99 | 1781.263 | 88% |
87% January - 2019 |
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed. |
No Image |
18 districts of Khyber Pakhtunkhwa Upto till Release Jan-2016 Rs.1304.09 m | |||||||||||||||||||
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
08-06-15 | - | - | 15-09-17 | - | 284 | 173.47 | 19.994 | 10.996 | 10.996 | 7.098 | 180.568 | 90.536 | 68% |
64% December - 2017 |
Length 10 Km - 9 Km completed. 1 Km in progress. |
No Image |
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 173.47 | 19.994 | 14.996 | 7.098 | 7.098 | 180.568 | 90.536 | 68% |
64% November - 2017 |
Length 10 Km - 9 Km completed. 1 Km in progress. Revised scope tender approval under process. |
No Image |
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 173.47 | 19.994 | 19.994 | 7.098 | 7.098 | 180.568 | 90.536 | 68% |
64% October - 2017 |
Length 10 Km - 9 Km completed. 1 Km in progress. Revised scope tender approval under process. |
No Image |
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
08-06-15 | - | - | - | - | 284 | 173.47 | 19.994 | 19.994 | 7.098 | 1.768 | 175.238 | 90.536 | 68% |
62% September - 2017 |
Length 10 Km - earth work, sub-base 7 Km, WBM 7 Km, WC 7 Km, structure work 95% completed. Revised scope tendering in progress, opening on 01/11/2017. |
No Image |
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
08-06-15 | - | - | - | - | 194.914 | 173.47 | 19.994 | 19.994 | 7.098 | 1.768 | 175.238 | 1.45 | 99% |
90% August - 2017 |
Length 10 Km - earth work, sub-base 7 Km, WBM 7 Km, WC 7 Km, structure work 95% completed. Revised PC-I/DCE for Rs.284 m submitted to SOR on 01/08/2017. |
No Image |
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
08-06-15 | - | - | - | - | 194.914 | 173.47 | 19.994 | 19.994 | 7.098 | 0 | 173.47 | 1.45 | 99% |
89% July - 2017 |
Length 10 Km - earth work, sub-base 7 Km, WBM 7 Km, WC 7 Km, structure work 95% completed. Revised PC-I/DCE for Rs.284 m submitted to SOR on 01/08/2017. |
No Image |
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 172.57 | 19.994 | 41.808 | 41.808 | 41.808 | 214.378 | 91.436 | 68% |
75% June - 2018 |
Original scope - completed (10 Km). Revisded scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 172.57 | 19.994 | 41.808 | 41.808 | 39.871 | 212.441 | 91.436 | 68% |
75% May - 2018 |
Original scope - completed (10 Km). Revisded scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 172.57 | 19.994 | 41.808 | 41.808 | 39.871 | 212.441 | 91.436 | 68% |
75% April - 2018 |
Original scope - completed (10 Km). Revisded scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 172.57 | 19.994 | 41.808 | 41.808 | 37.361 | 209.931 | 91.436 | 68% |
74% March - 2018 |
Original scope - completed (10 Km). Revisded scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 172.57 | 19.994 | 39.118 | 39.118 | 14.823 | 187.393 | 91.436 | 68% |
66% February - 2018 |
Original scope - completed (10 Km). Revisded scope in progress. |
No Image |
Nowshera | |||||||||||||||||||
1042 (OG) |
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km). |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 284 | 173.47 | 19.994 | 10.996 | 10.996 | 10.9936 | 184.4636 | 90.536 | 68% |
65% January - 2018 |
Original scope - completed (10 Km). Revisded scope in progress. |
No Image |
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 23.22 | 5.45 | 0 | 53.31 | 0 | 100% |
82% December - 2020 |
13- Units
All units in finishing stage. |
No Image |
Upper orakzai
1) Neerak A Khel
2) Bridge Ghozogda
3) Banda Mamozai Khyber Border
4) Tango Ali Zherzai Kurram Agency
5) Owl Kurram Agency Border
LOWER ORAKZAI
1) Oblan
2) Chapri Feroz Khel
3) Dbo Ghakhi
4) Sra Khawara Spoya
5) Mandara Khel
6) KandiMishti Sampog area.
7) Wam Pange near GMS
8) Ghuzdara Stori Khel | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 23.22 | 5.45 | 0 | 53.31 | 0 | 100% |
82% December - 2020 |
13- Units
All units in finishing stage. |
No Image |
Upper orakzai
1) Neerak A Khel
2) Bridge Ghozogda
3) Banda Mamozai Khyber Border
4) Tango Ali Zherzai Kurram Agency
5) Owl Kurram Agency Border
LOWER ORAKZAI
1) Oblan
2) Chapri Feroz Khel
3) Dbo Ghakhi
4) Sra Khawara Spoya
5) Mandara Khel
6) KandiMishti Sampog area.
7) Wam Pange near GMS
8) Ghuzdara Stori Khel | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 23.22 | 0 | 0 | 53.31 | 0 | 100% |
82% October - 2020 |
13- Units
All units in finishing stage. |
No Image |
Upper orakzai
1) Neerak A Khel
2) Bridge Ghozogda
3) Banda Mamozai Khyber Border
4) Tango Ali Zherzai Kurram Agency
5) Owl Kurram Agency Border
LOWER ORAKZAI
1) Oblan
2) Chapri Feroz Khel
3) Dbo Ghakhi
4) Sra Khawara Spoya
5) Mandara Khel
6) KandiMishti Sampog area.
7) Wam Pange near GMS
8) Ghuzdara Stori Khel | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 23.22 | 0 | 0 | 53.31 | 0 | 100% |
82% September - 2020 |
13- Units
All units in finishing stage. |
No Image |
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 23.22 | 0 | 0 | 53.31 | 0 | 100% |
82% August - 2020 |
13- Units
All units in finishing stage. |
No Image |
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 41.91 | 23.22 | 0 | 0 | 0 | 41.91 | 0 |
July - 2020 |
No Image | ||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 9.335 | 9.335 | 0 | 53.31 | 0 | 100% |
82% May - 2021 |
13 Units
1 work in porgress
2 Super structure
3 Finishing
4 Finishing
5 Finishing
6 Finishing
7 Finishing
8 Finishing
9 Finishing
10 Finishing
11 Finishing
12 Finishing
13 Finishing |
No Image |
Upper orakzai
1) Neerak A Khel ? Rs: 5.00 M
2) Bridge Ghozogda ? Rs: 5.00 M
3) Banda Mamozai Khyber Border ? Rs: 5.00 M
4) Tango Ali Zherzai Kurram Agency ? Rs: 5.00 M
5) Owl Kurram Agency Border ? Rs: 5.00 M
LOWER ORAKZAI
1) Oblan ? Rs: 5.00 M
2) Chapri Feroz Khel ? Rs: 5.00 M
3) Dbo Ghakhi ? Rs: 5.00 M
4) Sra Khawara Spoya ? Rs: 5.00 M
5) Mandara Khel ? Rs: 5.00 M
6) KandiMishti Sampog area. ? Rs: 5.00 M
7) Wam Pange near GMS ? Rs: 5.00 M
8) Ghuzdara Stori Khel ? Rs: 5.00 M | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 5.45 | 5.45 | 0 | 53.31 | 0 | 100% |
82% April - 2021 |
13 Units - units in progress
1 work in porgress
2 Super structure
3 Finishing
4 Finishing
5 Finishing
6 Finishing
7 Finishing
8 Finishing
9 Finishing
10 Finishing
11 Finishing
12 Finishing
13 Finishing |
No Image |
Upper orakzai
1) Neerak A Khel ? Rs: 5.00 M
2) Bridge Ghozogda ? Rs: 5.00 M
3) Banda Mamozai Khyber Border ? Rs: 5.00 M
4) Tango Ali Zherzai Kurram Agency ? Rs: 5.00 M
5) Owl Kurram Agency Border ? Rs: 5.00 M
LOWER ORAKZAI
1) Oblan ? Rs: 5.00 M
2) Chapri Feroz Khel ? Rs: 5.00 M
3) Dbo Ghakhi ? Rs: 5.00 M
4) Sra Khawara Spoya ? Rs: 5.00 M
5) Mandara Khel ? Rs: 5.00 M
6) KandiMishti Sampog area. ? Rs: 5.00 M
7) Wam Pange near GMS ? Rs: 5.00 M
8) Ghuzdara Stori Khel ? Rs: 5.00 M | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 5.45 | 5.45 | 0 | 53.31 | 0 | 100% |
82% March - 2021 |
13 Units - units in progress
1 work in porgress
2 Super structure
3 Finishing
4 Finishing
5 Finishing
6 Finishing
7 Finishing
8 Finishing
9 Finishing
10 Finishing
11 Finishing
12 Finishing
13 Finishing |
No Image |
Upper orakzai
1) Neerak A Khel ? Rs: 5.00 M
2) Bridge Ghozogda ? Rs: 5.00 M
3) Banda Mamozai Khyber Border ? Rs: 5.00 M
4) Tango Ali Zherzai Kurram Agency ? Rs: 5.00 M
5) Owl Kurram Agency Border ? Rs: 5.00 M
LOWER ORAKZAI
1) Oblan ? Rs: 5.00 M
2) Chapri Feroz Khel ? Rs: 5.00 M
3) Dbo Ghakhi ? Rs: 5.00 M
4) Sra Khawara Spoya ? Rs: 5.00 M
5) Mandara Khel ? Rs: 5.00 M
6) KandiMishti Sampog area. ? Rs: 5.00 M
7) Wam Pange near GMS ? Rs: 5.00 M
8) Ghuzdara Stori Khel ? Rs: 5.00 M | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 5.45 | 5.45 | 0 | 53.31 | 0 | 100% |
82% February - 2021 |
13 Units - units in progress
1 work in porgress
2 Super structure
3 Finishing
4 Finishing
5 Finishing
6 Finishing
7 Finishing
8 Finishing
9 Finishing
10 Finishing
11 Finishing
12 Finishing
13 Finishing |
No Image |
Upper orakzai
1) Neerak A Khel ? Rs: 5.00 M
2) Bridge Ghozogda ? Rs: 5.00 M
3) Banda Mamozai Khyber Border ? Rs: 5.00 M
4) Tango Ali Zherzai Kurram Agency ? Rs: 5.00 M
5) Owl Kurram Agency Border ? Rs: 5.00 M
LOWER ORAKZAI
1) Oblan ? Rs: 5.00 M
2) Chapri Feroz Khel ? Rs: 5.00 M
3) Dbo Ghakhi ? Rs: 5.00 M
4) Sra Khawara Spoya ? Rs: 5.00 M
5) Mandara Khel ? Rs: 5.00 M
6) KandiMishti Sampog area. ? Rs: 5.00 M
7) Wam Pange near GMS ? Rs: 5.00 M
8) Ghuzdara Stori Khel ? Rs: 5.00 M | |||||||||||||||||||
1042 (OG) |
191121-170131-M&R / Rehab and Construction Rehabilitiation of Levy Picquets in Orakzai Agency. [MA] |
Orakzai |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 65.13 | 53.31 | 23.22 | 5.45 | 5.45 | 0 | 53.31 | 0 | 100% |
82% January - 2021 |
13- Units
All units in finishing stage. |
No Image |
Upper orakzai
1) Neerak A Khel
2) Bridge Ghozogda
3) Banda Mamozai Khyber Border
4) Tango Ali Zherzai Kurram Agency
5) Owl Kurram Agency Border
LOWER ORAKZAI
1) Oblan
2) Chapri Feroz Khel
3) Dbo Ghakhi
4) Sra Khawara Spoya
5) Mandara Khel
6) KandiMishti Sampog area.
7) Wam Pange near GMS
8) Ghuzdara Stori Khel | |||||||||||||||||||
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- December - 2019 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- November - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- October - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- September - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- August - 2019 |
No Image | |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- May - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- April - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- March - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0.001 | 0 | 0.001 | 0.001 | 0 | 0 | 0 | 0 | - |
- February - 2020 |
Concept paper submitted to CDWP. |
No Image |
1042 (New) |
190220-Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project (JICA Assisted). |
Provincial |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 25400 | 0 | 100 | 100 | 0 | 0 | 0 | 0 | - |
- January - 2020 |
Concept paper submitted to CDWP. |
No Image |
Pages : 1 2 |