Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
29-02-16 | 30-06-18 | - | 10-09-15 | - | 90 | 43.835 | 45.905 | 45.905 | 34.428 | 24.681 | 68.516 | 0.26 | 100% |
76% December - 2017 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
29-02-16 | 30-06-18 | - | 10-09-15 | - | 90 | 43.835 | 45.905 | 45.905 | 16.296 | 11.499 | 55.334 | 0.26 | 100% |
61% September - 2017 |
Length 6 Km - 2 Km asphalt completed. |
No Image |
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
29-02-16 | 30-06-18 | - | 10-09-15 | - | 90 | 43.835 | 45.905 | 45.905 | 16.296 | 0 | 43.835 | 0.26 | 100% |
49% August - 2017 |
Length 6 Km - 2 Km asphalt completed. |
No Image |
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
29-02-16 | 30-06-18 | - | 10-09-15 | - | 90 | 43.835 | 45.905 | 45.905 | 16.296 | 0 | 43.835 | 0.26 | 100% |
49% July - 2017 |
Length 6 Km - 2 Km asphalt completed. |
No Image |
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 34.428 | 16.296 | 60.131 | 0.26 | 100% |
67% November - 2017 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 27.772 | 16.296 | 60.131 | 0.26 | 100% |
67% October - 2017 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 0 | 16.281 | 16.281 | 16.281 | 16.281 | 16.281 | 62.376 | 21% |
21% October - 2020 |
Pc-IV & Handing Taking Certificate submitted? all components completed. |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 0 | 16.281 | 16.281 | 16.281 | 16.281 | 16.281 | 62.376 | 21% |
21% September - 2020 |
Pc-IV & Handing Taking Certificate submitted. |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 0 | 16.281 | 16.281 | 16.281 | 6.691 | 6.691 | 62.376 | 21% |
9% August - 2020 |
Pc-IV & Handing Taking Certificate submitted. |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 0 | 0 | 0 | 0 | 0 | 0 | 78.657 | - |
- July - 2020 |
Work in progress (Barracks). Office block, Admn bl |
No Image |
Sub Jail Charsadda | |||||||||||||||||||
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 42.548 | 42.458 | 41.114 | 84.949 | 0.26 | 100% |
94% June - 2018 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1. Umarzai to Yakh Koi ( 2km - Width 12 ft )
2. Damadam to Hayat Gul kallya 9 4km - width 12 ft ) | |||||||||||||||||||
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 45.905 | 33.082 | 76.917 | 0.26 | 100% |
85% May - 2018 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1. Umarzai to Yakh Koi ( 2km - Width 12 ft )
2. Damadam to Hayat Gul kallya 9 4km - width 12 ft ) | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 62.376 | 16.281 | 16.281 | 16.281 | 16.281 | 78.657 | 0 | 100% |
100% May - 2021 |
01- Unit
Completed & H/O |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 45.905 | 33.082 | 76.917 | 0.26 | 100% |
85% April - 2018 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1. Umarzai to Yakh Koi ( 2km - Width 12 ft )
2. Damadam to Hayat Gul kallya 9 4km - width 12 ft ) | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 62.376 | 16.281 | 16.281 | 16.281 | 16.281 | 78.657 | 0 | 100% |
100% April - 2021 |
Completed & H/O |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 34.428 | 33.082 | 76.917 | 0.26 | 100% |
85% March - 2018 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1. Umarzai to Yakh Koi ( 2km - Width 12 ft )
2. Damadam to Hayat Gul kallya 9 4km - width 12 ft ) | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 62.376 | 16.281 | 16.281 | 16.281 | 16.281 | 78.657 | 0 | 100% |
100% March - 2021 |
Completed & H/O |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 34.428 | 32.62 | 76.455 | 0.26 | 100% |
85% February - 2018 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
1. Umarzai to Yakh Koi ( 2km - Width 12 ft )
2. Damadam to Hayat Gul kallya 9 4km - width 12 ft ) | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 62.376 | 16.281 | 16.281 | 16.281 | 16.281 | 78.657 | 0 | 100% |
100% February - 2021 |
Completed & H/O |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 90 | 43.835 | 45.905 | 45.905 | 34.428 | 27.772 | 71.607 | 0.26 | 100% |
80% January - 2018 |
Length 6 Km - 4.5 Km asphalt completed. |
No Image |
Charsadda | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Charsadda |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 78.657 | 62.376 | 16.281 | 16.281 | 16.281 | 16.281 | 78.657 | 0 | 100% |
100% January - 2021 |
Completed & H/O |
No Image |
Sub Jail Charsadda.
| |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 0 | 0 | 0 | 0 | 0 | 0 | 3.193 | - |
- October - 2020 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 0 | 0 | 0 | 0 | 0 | 0 | 3.193 | - |
- September - 2020 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 0 | 0 | 0 | 0 | 0 | 0 | 3.193 | - |
- August - 2020 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 0 | 0 | 0 | 0 | 0 | 0 | 3.193 | - |
- July - 2020 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 3.193 | 0 | 0 | 0 | 0 | 3.193 | 0 | - |
100% May - 2021 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 3.193 | 0 | 0 | 0 | 0 | 3.193 | 0 | - |
100% April - 2021 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 3.193 | 0 | 0 | 0 | 0 | 3.193 | 0 | - |
100% March - 2021 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 3.193 | 0 | 0 | 0 | 0 | 3.193 | 0 | - |
100% February - 2021 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Chitral Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 3.193 | 3.193 | 0 | 0 | 0 | 0 | 3.193 | 0 | - |
100% January - 2021 |
Completed. |
No Image |
District Jail Chitral | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 0 | 0 | 0 | 0 | 0 | 0 | 33.36 | - |
- October - 2020 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 0 | 0 | 0 | 0 | 0 | 0 | 33.36 | - |
- September - 2020 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 0 | 0 | 0 | 0 | 0 | 0 | 33.36 | - |
- August - 2020 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 0 | 0 | 0 | 0 | 0 | 0 | 33.36 | - |
- July - 2020 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% May - 2021 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% April - 2021 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% March - 2021 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% February - 2021 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Dir Lower |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 33.36 | 28.394 | 0 | 0 | 0 | 0 | 28.394 | 4.966 | - |
85% January - 2021 |
Completed & H/O. |
No Image |
1) Condemned Prisioners barrack for 50 prison | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 0 | 0 | 0 | 0 | 0 | 0 | 38.996 | - |
- October - 2020 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 0 | 0 | 0 | 0 | 0 | 0 | 38.996 | - |
- September - 2020 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 0 | 0 | 0 | 0 | 0 | 0 | 38.996 | - |
- August - 2020 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 0 | 0 | 0 | 0 | 0 | 0 | 38.996 | - |
- July - 2020 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% May - 2021 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% April - 2021 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% March - 2021 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% February - 2021 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 38.996 | 31.665 | 0 | 0 | 0 | 0 | 31.665 | 7.331 | - |
81% January - 2021 |
Completed & H/O (2 units). |
No Image |
Centeral Prison Haripur (BW and Sewarage Syst | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 0 | 0 | 0 | 0 | 0 | 0 | 28.602 | - |
- October - 2020 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||
1024 (OG) |
110131-Improvement of Existing Jails in Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 28.602 | 0 | 0 | 0 | 0 | 0 | 0 | 28.602 | - |
- September - 2020 |
Completed & H/O (1 unit). |
No Image |
Sub Jail Karak | |||||||||||||||||||