Code | Scheme Name | District of Location | Commen. | Comple. | PC - I Status | Status Date |
Where Pending |
Cost Orignnal / Revised |
PFY Expenditure | Original Alloc. |
Revised Alloc. |
Releases | Expenditure | Acc. Expenditure | Throw Forward | Targets | Achievements | Remarks | Images |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 49.997 | 0 | 0 | 0 | 0 | 0 | 0 | 49.997 | - |
- September - 2018 |
Tender floated on 13/09/2018. |
No Image |
1) Construction/rehabilitation of BTR of Tablighi Markaz Bannu Airport 2) Construction/rehabilitation of BTR Landy Killa Narmi Khel 3) Construction/rehabilitation of BTR from Marwat Canal to Ghora road Narmi Khel 4) Construction/rehabilitation of BTR of Main Jani Khel road 5) Construction/rehabilitation of BTR of Ghora Bakka Khel road from Mani Koroona to Bazid Koroona | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Bannu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 49.997 | 0 | 0 | 0 | 0 | 0 | 0 | 49.997 | - |
- July - 2018 |
Approved. |
No Image |
1) Construction/rehabilitation of BTR of Tablighi Markaz Bannu Airport 2) Construction/rehabilitation of BTR Landy Killa Narmi Khel 3) Construction/rehabilitation of BTR from Marwat Canal to Ghora road Narmi Khel 4) Construction/rehabilitation of BTR of Main Jani Khel road 5) Construction/rehabilitation of BTR of Ghora Bakka Khel road from Mani Koroona to Bazid Koroona | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 19.15 | 19.15 | 19.15 | 339 | 648.67 | 34% |
34% December - 2019 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 20 | 5 | 5 | 324.85 | 648.67 | 34% |
33% November - 2019 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 20 | 5 | 5 | 324.85 | 648.67 | 34% |
33% October - 2019 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 20 | 5 | 5 | 324.85 | 648.67 | 34% |
33% September - 2019 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 20 | 5 | 5 | 324.85 | 648.67 | 34% |
33% August - 2019 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 19.15 | 19.15 | 19.15 | 339 | 648.67 | 34% |
34% May - 2020 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 19.15 | 19.15 | 19.15 | 339 | 648.67 | 34% |
34% April - 2020 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 19.15 | 19.15 | 19.15 | 339 | 648.67 | 34% |
34% March - 2020 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 19.15 | 19.15 | 19.15 | 339 | 648.67 | 34% |
34% February - 2020 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
140829-Improvement of 25 KM left over portion of Chukiyatan - Barawal - Shahi Road, District Dir (Upper). |
Dir Upper PKHA |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 988.52 | 319.85 | 20 | 19.15 | 19.15 | 19.15 | 339 | 648.67 | 34% |
34% January - 2020 |
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started. |
No Image |
Package-1 (Barawal Bandi to Jan Bati)
Package-2 (Jan Bati to Shaltalo)
Package-3 (Shaltalo to Marawaro)
Package-4 (Marawaro to Shahi Top) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
16-06-15 | - | - | 10-09-15 | - | 150 | 36.301 | 24.647 | 21.073 | 14.912 | 14.912 | 51.213 | 89.052 | 41% |
34% December - 2017 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
16-06-15 | - | - | 10-09-15 | - | 150 | 36.301 | 24.647 | 24.647 | 8.75 | 8.75 | 45.051 | 89.052 | 41% |
30% September - 2017 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
16-06-15 | - | - | 10-09-15 | - | 150 | 36.301 | 24.647 | 24.647 | 8.75 | 8.75 | 45.051 | 89.052 | 41% |
30% August - 2017 |
4 units - Bangash Chapper road, link road at Shenawari - sub base in progress. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
16-06-15 | - | - | 10-09-15 | - | 150 | 36.301 | 24.647 | 24.647 | 8.75 | 0 | 36.301 | 89.052 | 41% |
24% July - 2017 |
4 units - Bangash Chapper road, link road at Shenawari - sub base in progress. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 36.301 | 24.647 | 21.073 | 14.912 | 14.022 | 50.323 | 89.052 | 41% |
34% November - 2017 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 36.301 | 24.647 | 24.647 | 14.912 | 8.75 | 45.051 | 89.052 | 41% |
30% October - 2017 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 35.12 | 24.647 | 29.313 | 29.313 | 29.313 | 64.433 | 90.233 | 40% |
43% June - 2018 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 35.12 | 24.647 | 29.313 | 29.313 | 29.313 | 64.433 | 90.233 | 40% |
43% May - 2018 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 35.12 | 24.647 | 29.313 | 29.313 | 29.313 | 64.433 | 90.233 | 40% |
43% April - 2018 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 35.12 | 24.647 | 26.623 | 26.623 | 26.623 | 61.743 | 90.233 | 40% |
41% March - 2018 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 35.12 | 24.647 | 26.623 | 26.623 | 21.761 | 56.881 | 90.233 | 40% |
38% February - 2018 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
ADP's Images |
1) Bangash Chapper road (4.50 Km - 12 ft)
2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft)
3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft)
4) Mula Tabi road Samana (1 Km - 18 ft)
5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu. |
Hangu |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 150 | 36.301 | 24.647 | 26.623 | 26.623 | 14.912 | 51.213 | 89.052 | 41% |
34% January - 2018 |
4 units - 1.5 Km BT completed. WBM in progress on rest. |
No Image |
1) Bangash Chapper road (4.50 Km - 12 ft) 2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft) 3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft) 4) Mula Tabi road Samana (1 Km - 18 ft) 5) Navai Killay Samana road (1 Km - 12 ft) | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 8.662 | 8.661 | 226.345 | 7.271 | 97% |
96% December - 2018 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 8.662 | 8.66 | 226.344 | 7.271 | 97% |
96% November - 2018 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 8.662 | 8.66 | 226.344 | 7.271 | 97% |
96% November - 2018 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.55 | 11.55 | 11.55 | 229.234 | 7.271 | 97% |
97% April - 2019 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. Demand Rs.7.27 m over TS. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 11.55 | 11.55 | 229.234 | 7.271 | 97% |
97% March - 2019 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. Demand Rs.7.27 m over TS. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 11.55 | 11.55 | 229.234 | 7.271 | 97% |
97% March - 2019 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. Demand Rs.7.27 m over TS. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 8.6615 | 8.661 | 226.345 | 7.271 | 97% |
96% February - 2019 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. Demand 7.27 M over TS |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
160627-F/S, Design and Construction of (a) Akunbandi bridge (b) from Rehana to Chapra (c) Rehana to Tachar (d) Noordi to Pind Jamal Khan (e) Talkar road, District Haripur. |
Haripur |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 236.504 | 217.684 | 11.549 | 11.549 | 8.662 | 8.661 | 226.345 | 7.271 | 97% |
96% January - 2019 |
4 units - 1 bridge (210 mtr) - 3030 piles completed. 3 units (roads) - earth work, masonry in progress. |
No Image |
1) Akhoon Bandi Bridge
2) Rehana to Chappra road 3.5 Km
3) Rehana to Techar (Chitri) road 2.20 Km
4) Noordi to Pind Jamal Khan + Talokar road 2.20 Km
5) Talokar road 2.20 Km | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 8.778 | 0 | 0 | 0 | 0 | 8.778 | 1.222 | - |
88% September - 2018 |
BTR Wanki Siraj Khel - earth work 90%, sub base 95%, WBM 70%, structure work 90% completed. BTR Mandawa - completed. |
No Image |
1) BTR from Wanki Siraj Khel to Zarki Nasratti via Mohallah Zargaran (0.579 Km)
2) BTR Mandawa (1.25 Km) | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Karak |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 10 | 8.778 | 0 | 0 | 0 | 0 | 8.778 | 1.222 | - |
88% July - 2018 |
BTR Wanki Siraj Khel - earth work 90%, sub base 95%, WBM 70%, structure work 90% completed. BTR Mandawa - completed. |
No Image |
1) BTR from Wanki Siraj Khel to Zarki Nasratti via Mohallah Zargaran (0.579 Km)
2) BTR Mandawa (1.25 Km) | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 0 | 0 | 0 | 0 | 0 | 0 | 50 | - |
- September - 2018 |
Approved. |
No Image |
1) Construction/rehabilitation of Pai Daraki road
2) Construction/rehabilitation of Muhammad Akbar Amakhel road
3) Construction of bridge for village Kotkat
4) Construction/rehabilitation of Marma Gul Nawaz
5) Construction of 1 Kmroad for Main City Bazar | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Kohat |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 50 | 0 | 0 | 0 | 0 | 0 | 0 | 50 | - |
- July - 2018 |
Approved. |
No Image |
1) Construction/rehabilitation of Pai Daraki road
2) Construction/rehabilitation of Muhammad Akbar Amakhel road
3) Construction of bridge for village Kotkat
4) Construction/rehabilitation of Marma Gul Nawaz
5) Construction of 1 Kmroad for Main City Bazar | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- September - 2018 |
PC-I/DCE for Rs.293.536 m submitted to Secretary LGRD Deptt on 03/05/2018. |
No Image |
Construction of Suigas road MC Nowshera Kalan | |||||||||||||||||||
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Nowshera HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | - |
- July - 2018 |
PC-I/DCE for Rs.293.536 m submitted to Secretary LGRD Deptt on 03/05/2018. |
No Image |
Construction of Suigas road MC Nowshera Kalan | |||||||||||||||||||
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- December - 2020 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- December - 2020 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- October - 2020 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- September - 2020 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- August - 2020 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 0 | 0 | 0 | 148 | 0 | - |
- July - 2020 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- May - 2021 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- April - 2021 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- March - 2021 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- February - 2021 |
No Image | |
1000 (OG) |
140263-F/S & Construction of Headquarters for Counter Terrorism Department at District Peshawar(Ternab) |
Peshawar |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 231.573 | 148 | 58.574 | 58.574 | 0 | 0 | 148 | 0 | - |
- January - 2021 |
No Image | |
1000 (OG) |
140711-Improvement of Municipal Roads in Urban Areas of Khyber Pakhtunkhwa. |
Peshawar HW |
30-11--1 | 30-11--1 | - | 30-11--1 | - | 98.906 | 0 | 0 | 0 | 0 | 0 | 0 | 98.906 | - |
- September - 2018 |
Approved. |
No Image |
1) Construction of Municipal Urban Road in UC Gulbela Peshawar 2) Construction/rehabilitation of Pyari Bala and Payan road at Peshawar (1.50 Km) 3) Construction/rehabilitation of Garhi Imran road at Peshawar (1.50 Km) 4) Construction/rehabilitation of Batyan to Karyana road at Peshawar (3 Km) 5) Construction/rehabilitation of Internal Dub road at Peshawar (0.600 Km) 6) Improvement/construction of Rehatabad road 7) Improvement/construction of Warsakroad (Iqra street) 8) Improvement/construction of Arbab road | |||||||||||||||||||
Pages : 1 2 |