  1. Constn: of Drain, Pavement of Streets Chief Engineer Centre

  2. Constn: of Drains, Pavement of Street Chief Engineer Centre.

  3. Constn: of Drain, Pavement of streets Chief Engineer Centre

  4. Constn: of Drains, Pavement of Street & Internal Roads Chief Engineer Centre

  5. Constn: of Drain, Pavement of Streets Chief Engineer Centre

  6. F/S Design & Rehab: of C&W Road Chief Engineer Centre

  7. Technical Evaluation of Contractors/Firms Chief Engineer Centre

  8. F/S, Design Widening of Road from Akora Khattak Chief Engineer Centre

  9. F/S, Design Widening of Road from Akora Khattak Chief Engineer Centre

  10. F/S, Design Widening of Road Chief Engineer Centre

  11. F/S, Design & Impvt:/Black Topping of 18-Km Internal Roads Chief Engineer Centre

  12. F/S, Design & Rehab: of C&W Roads Chief Engineer Centre

  13. Special Repair of Roads Chief Engineer Centre

  14. Notice Inviting Tenders XEN C&W Divn: Charsadda

  15. F/S, Design & Impvt:/Black Topping of 16-Km Internal Roads Chief Engineer Centre

  16. Rehab: of Rural Roads in Selected Districts Chief Engineer Centre

  17. Constn: of Administrative Blocks & Barracks for Prison Chief Engineer Centre

  18. Constn: of Drains, Pavement of Street & Internal Roads Chief Engineer Centre

  19. Technical Qualification of Contractors/Firms Chief Engineer Centre

  20. Notice Inviting Tenders XEN Bldg: Divn:-II Peshawar

  21. Notice Inviting Tenders XEN Bldg: Divn:-II Peshawar

  22. Corrigendum XEN C&W Divn: Swat

  23. NOTICE INVITING TENDERS XEN C&W DIVISION CHARSADDA

Energy & Power

ADP No.
District
Scheme Name
Cost (Million)
287
Peshawar
Operationalization of Re-Designed Energy & Power Department
89.32
288
Shangla
Construction of Karora HPP in District Shangla (11.80 MW)(Rs. 4620.06 m) (HDF Funded)
462.01
289
Swat
Construction of Matiltan-Gorkin HPP Swat (84MW) Total Cost of Project Rs20722.940 (HDF Funded) (PDWP 17-04-2014)
4114.59
290
Swat
Purchase of Land for Matiltan HPP Swat (84 MW) (HDF Funded)
128
291
Dir (Upper)
Construction of Sharmai HPP (150 MW) (HDF Funded) (PDWP 12-04-2012)
3584
292
Dir (Upper)
Construction of Koto HPP (40.8 MW) (HDF Funded). (PDWP 09-01-2012)
1425.28
293
Chitral
Construction of Shushghai-Zhendoli HPP (144 MW) (HDF Funded) (PDWP 09-01-2012)
2878.69
294
Chitral
Construction of Shogo Sin HPP (132 MW) (HDF Funded)(PDWP 09-01-2012)
2695.59
295
Chitral
Purchase of land for Lawi HPP (69 MW) Chitral (HDF Funded)
317.595
296
Chitral
Construction of Lawi HPP (69 MW) Chitral Total Cost of Project. Rs. 21586.890 m (HDF Funded) (ECNEC 17-04-2014)
2158
297
Mansehra
Construction of Jabori HPP (10 MW) Total cost of project 3798.260 m (HDF Funded)
379.383
298
Provincial
Development of Renewable Energy in Khyber Pakhtunkhwa (REDSIP). (ADB Assisted/HDF).
8055.15
299
Provincial
Creation of Planning & Monitoring Cell.
56.82
300
Provincial
Purchase of Land for Hydel Projects (Total cost of project Rs. 2678.6513 m) (HDF Funded).
2144.711
301
Provincial
F/S of Potential Raw Sites in Khyber Pakhtunkhwa Phase-II, Total 03 Schemes (Total Capacity 965 MW) (Kari Mushkur Chitral 446 MW, Gabral Kalam 110 MW, Torcamp Godubar Chitral 409 MW) (HDF Funded)
123.79
302
Provincial
Solarization of Civil Secretariat (for remaining Departments of Civil Secretariat) (HDF Funded)
200
303
Provincial
Electrification of 100 Villages through Solar/ Alternate Energy. (HDF Funded)
301.095
304
Provincial
Restructuring of Electric Inspectorate of Energy & Power Department, Khyber Paktunkhwa.
79
305
Provincial
Construction of 356 Mini/Micro Hydro Power stations in Khyber Pakhtunkhwa (Total capacity 35.6 MW) Total Cost 5524.83 million (HDF Funded)
1657.75
306
Provincial
Electrification of Un-Electrified villages through Solar/Alternate Energy in remaining Districs of Khyber Pakhtunkhwa Phase-II (HDF Funded)
241.758
307
Provincial
Hiring of Services / Consultancies for Oil & Gas Sector. (HDF Funded)
59
308
Provincial
Construction of 10 Mini & Micro HPP on Canals (HDF Funded)
20
309
Provincial
Software Development for Mointoring and Video Conferencing System to attract foreign investment. (HDF Funded)
7.572
310
Provincial
solarization of Chief Minister's Secretariat\ Chief Minister's House (HDF Funded)
100
311
Tor Ghar
F/S of Hydel site in Mujahidin at Barando River District Tor Ghar (HDF Funded)
30
312
Dir (Upper)
Construction of 22 MW Patrak-Shringal HPP District Dir (20% ADP & 80 % HDF)
827.6
313
Dir (Upper)
Construction of 47 MW Barikot Patrak HPP District Dir (20% ADP & 80 % HDF)
1477.8
314
Provincial
Establishment of Technical Lab (HDF Funded)
500
315
Provincial
Detailed design of HPPs in KPK (Balakot HPP, Mujigram-Shoghore HPP,Istaro-Bonni, Barikot Patrak HPP, Patrak-Shringal, Arkari-Gol HPP) (HDF Funded)
160
316
Provincial
Rehabilitation of Reshun HPP (HDF Funded)
160
317
Provincial
Access to Energy - Construction of MHP on Rivers and Tributeries (ADB/HDF Funded)
9900
318
Provincial
Access to Energy - Construction of MHP on Canals (ADB/HDF Funded)
3500
319
Provincial
Access to Energy - Solarization of Schools and BHUs (ADB/HDF Funded)
2000
320
Provincial
Contruction of Head office of KPOGCL (HDF Funded)
150
321
Provincial
Generation of 60 MW Electricity from Canal Water (Total Cost=7200) (HDF Funded).
0.001