Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2018,

Showing Page Number : 43 of 46

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 20 21 0.4 0.4 0.4 0 21 0 100% 100%
January - 2018
Completed.
1) Tehsil Battagram PK-59 (7 Roads) 2) Tehsil Allai PK-60 (4 Roads)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Buner
30-11--1 30-11--1 - 30-11--1 - 61.9 59.731 9 0 0 0 59.731 0 100% 96%
January - 2018
7 Km - 6 Km completed.
PK-77 (Rs.10 m), PK-78 (Rs.41.900 m), PK-79 (Rs.10 m)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 80 82.323 0 0 0 0 82.323 0 - 100%
January - 2018
Completed (9.65 Km).
1) RCC road from Shabqadar Matta road to Khawaja Was 600 m PK-22
2) Main Mansoka to Mian Essa 1.5 Km and Sohta to Gunda 1.25 Km PK-22
3) Motorway under pass to Kably Koroona UC Dosehra 900 m and Shah Pasand Killy to Londa 500 m PK-17
4) Main Charsadda Tangi road Solay Kamar PK-18
5) Agra Maina road 1.5 Km PK-19
6) Ziam to Dado Killy 1.5 PK-20
7) Gujarano Killy Talasha to Imam Said Killy 400 m Battagram Police Station to Allah Dad Khel 1 Km PK-21
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Chitral
30-11--1 30-11--1 - 30-11--1 - 10 9.7 0 0 0 0 9.7 0.3 - 97%
January - 2018
Completed.
Booni Gole road
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 209.7 136.7 1 1 1 1 137.7 72 66% 66%
January - 2018
Completed (23.52 Km).
1) PK-64 2) PK-65 3) PK-66 4) PK-67 5) PK-68
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 138.408 122.074 9.52 9.52 9.52 9.373 131.447 6.814 95% 95%
January - 2018
Completed (13.2 Km).
1) PK-94 2) PK-95 3) PK-96 4) PK-97
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 178.627 114.349 3 3 3 3 117.349 61.278 66% 66%
January - 2018
11/21 components, 11 completed, 10 in progress.
1) PK-91 - 5 roads (5.40 Kms) 2) PK-92 - 5 roads (4.30 Kms) 3) PK-93 - 7 roads (5.75 Kms) 4) Barkan Usherai Dara PK-92 (special repair of suspension bridge) 5) Chukyatan to New Sheringal Bypass road Gateway Dir Upper
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Hangu
30-11--1 30-11--1 - 30-11--1 - 40 40.7 0 0 0 0 40.7 0 - 100%
January - 2018
Completed (4 Km BT).
1) BTR from Pongi Banda to Tari Banda PK-42 (1 Km) 2) BTR Baboo Tang PK-42 (1 Km) 3) BTR Sarak Dana PK-42 (1 Km) 4) BTR Tora Wari PK-43 (1 Km)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Haripur
30-11--1 30-11--1 - 30-11--1 - 432.876 301.71 0 0 0 0 301.71 131.166 - 70%
January - 2018
Completed (6 units).
1) Various road in PK-50 Distt Haripur (Phase-I, II and III)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Karak
30-11--1 30-11--1 - 30-11--1 - 60 61.88 0 0 0 0 61.88 0 - 100%
January - 2018
Completed (7.8 Km BT).
1) BTR from Deli Mela to Dhandi Edel Khel (3 Km and 1.8 Km new)
2) Indus Highway Khojaki Killa Alam Sheri road (1 Km new)
3) Topi Killa to Inzar Banda raod (2 Km new)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Kohat
30-11--1 30-11--1 - 30-11--1 - 123.5 119.42 0 0 0 0 119.42 4.08 - 97%
January - 2018
13.18 Km completed.
1) PK-37 (3.47 Km) 2) PK-38 (2.89 Km) 3) PK-39 (5.39 Km)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Kohistan
30-11--1 30-11--1 - 30-11--1 - 30 21.81 0 1.6 1.6 0 21.81 8.19 - 73%
January - 2018
Length 3 Km - 1 Km completed. 2 Km sub base completed.
1) BT Janchal road (1 Km) PK-61 2) BT Kund Sher Valley road (1 Km) PK-62 3) BT Dog Nullah (1 Km) PK-63
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Lakki Marwat
30-11--1 30-11--1 - 30-11--1 - 29.677 30.247 0 0 0 0 30.247 0 - 100%
January - 2018
Completed (3 Km).
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Malakand
30-11--1 30-11--1 - 30-11--1 - 67.437 60.75 0 0 0 0 60.75 6.687 - 90%
January - 2018
6/6 Km completed.
Zangal Patty road (0.500 Kms) in PK-98
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 66.508 63.95 3 3 3 0 63.95 0 100% 96%
January - 2018
Completed (11.85 Km).
1) MNJ road to Kaghan Hospital (0.5 Km) Tehsil Balakot 2) PCC road Qazi Abad
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 286.877 276.35 0 0.55 0.55 0.496 276.846 10.527 - 97%
January - 2018
Completed (27.64 Km).
1) PK-23 (0.500 Kms) 2) PK-24 (3.710 Kms) 3) PK-25 (2.300 Kms) 4) PK-26 (2.450 Kms) 5) PK-27 (3.000 Kms) 6) PK-28 (1.200 Kms) 7) PK-29 (1.812 Kms) 8) PK-30 (11.580 Kms)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Nowshera
HW
30-11--1 30-11--1 - 30-11--1 - 342.6 330.459 3.792 3.792 3.792 3.106 333.565 8.349 98% 97%
January - 2018
Completed (33 Km).
1) Repair of Rigid Pavement at Ghazi Abad Dag Ismail Khel (PK-12) 2) (a)Const/Rehab  of road from GT Road to Babi Qadeem upto Ali Baig village road (PK-12) (b) Const of rigid pavement from Cherat Road Haliki Banda (PK-12) (c)Const of rigid pavement in village Jaroba (PK-12) District Nowshera 3) Impovt/ Rehab of road from Mian Ishaq Dheri to Mohib Banda (PK-13) Distt Nowshera 4) Impovt/Rehab of road Cherat road to Spin Kani Const of 2 Nos RCC Box Culverts & R/Wall at Nullah in Madina Colony (Haji Abad) (PK-13) 5) Impovt/Rehab of Ali Abad Road at Behram Killi (PK-14) 6) (a) Impovt/Rehab of road from Muslim Bazar to Samandar Garhi (PK-14) (b) Impovt/Rehab of road from Nawan Killi Chowk to Samandar Garhi (PK-14) (c) Impovt/Rehab of road from GT Road to Manjawaran Amangarh (PK-14) Nowshera 7) Impovt/Rehab of road from GT Road to Nari Road Jehangira (PK-15) 8) (a) Impovt/Rehab of road from Abubakar Masjid to Hassan Dara (Dang Dang) Akora Khattak (PK-15) (b) Impovt/Rehab of road from GT Road to Khushal Khan Khattak Mazar (PK-15) (c) Impovt/Rehab of road from Jehangira Station road to Katti Maina (PK-15) Nowshera
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 400.352 384.3 1.5 1.5 1.5 1.5 385.8 14.552 96% 96%
January - 2018
Completed (54 Km).
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Provincial
30-11--1 30-11--1 - 30-11--1 - 253.778 2953.063 100 108.532 58.532 0 2953.063 0 100% 100%
January - 2018
Work in progress.
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Shangla
30-11--1 30-11--1 - 30-11--1 - 54 40.2 2 2 2 1.26 41.46 11.8 78% 77%
January - 2018
Work in progress (4 Km).
1) Dherai Chakesar road PK-88 2) Chowga to Machkandai road 3) Kankar to Mandoria road 4) KKH to Danda and Losar rod PK-87 5) PCC road Brain UC Ismail Khel 6) PCC road Kohay UC Aloch 7) PCC road Awari Ashar Kot Uc Aloch 8) PCC road Bagyard Dunkacha UC Aloch 9) PCC road Khadang UC Chakisar 10) PCC road Bar Serai Martung UC Behlol Khel 11) PCC road Bar Kabal Gram to Pul UC Martung 12) PCC road Sabono Shomano UC Martung 13) PCC road Causeway Geer UC Behlol Khel
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Swabi
30-11--1 30-11--1 - 30-11--1 - 225.05 226.914 2 2 2 0 226.914 0 100% 100%
January - 2018
Road work, structure work in progress.
PK-31 (Rs.44 m), PK-33 (Rs.34 m)
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Swat
HW
30-11--1 30-11--1 - 30-11--1 - 282.81 281.442 0.635 0.635 0.635 0.635 282.077 0.733 100% 100%
January - 2018
Completed (28 Km).
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Tank
30-11--1 30-11--1 - 30-11--1 - 10 10 0 0 0 0 10 0 - 100%
January - 2018
Completed (1 Km).
Rehabilitation of road from Nasran to Daud Khel
1303
(OG)
130574-Impt / Rehabilitation & Upgradation of 300 Km roads in Khyber Pakhtunkhwa.
Tor Ghar
30-11--1 30-11--1 - 30-11--1 - 10 10 0 0 0 0 10 0 - 100%
January - 2018
Completed.
1) Zeezari Bala to Payee Basi Khel shifted to Zeezar Bala to Soral (1 Km)
1304
(OG)
130575-Emergent nature works in roads (Khyber Pakhtunkhwa).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 13.097 14.5 0 0 0 0 14.5 0 - 100%
January - 2018
Completed (2 units).
1) Restoration of RW at Qalandarabad Turnawal road 2) Shifting of Asphalt Batching Plant Gohar Abad Havelian to Mangal site
1304
(OG)
130575-Emergent nature works in roads (Khyber Pakhtunkhwa).
Chitral
30-11--1 30-11--1 - 30-11--1 - 16.077 0 4.5 4.5 4.5 4.5 4.5 11.577 28% 28%
January - 2018
Work in progress. Road temporary restored. Work on structure in progress.
1) Restoration of Washed away portion (610 mtr) Mastuj Broghal Pass road at Onawouch due to glacial lake outburst flood (Glof) on 26/06/2017, District Chitral
1304
(OG)
130575-Emergent nature works in roads (Khyber Pakhtunkhwa).
Mardan
HW
30-11--1 30-11--1 - 30-11--1 - 11.3 11.3 0 0 0 0 11.3 0 - 100%
January - 2018
Completed.
1304
(OG)
130575-Emergent nature works in roads (Khyber Pakhtunkhwa).
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 13.39 6.5 5 5 5 5 11.5 1.89 86% 86%
January - 2018
Bridge Bashirabad Pachagaye, bridge work completed. Road work in progress.
1304
(OG)
130575-Emergent nature works in roads (Khyber Pakhtunkhwa).
Provincial
30-11--1 30-11--1 - 30-11--1 - 75 29.5 40.5 22.375 12.25 0 29.5 5 93% 39%
January - 2018
Completed (Umbrella).
1305
(OG)
130576-Completion of left over incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II).
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
January - 2018
PC-I/DCE for Rs.3.568 m is being submitted.
1305
(OG)
130576-Completion of left over incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II).
Bannu
30-11--1 30-11--1 - 30-11--1 - 163.477 154.53 7 7 7 0 154.53 1.947 99% 95%
January - 2018
RCC bridge completed. Approach road completed.
1305
(OG)
130576-Completion of left over incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II).
Chitral
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
January - 2018
PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016.
Chitral
1305
(OG)
130576-Completion of left over incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II).
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 3.466 2.666 0 0 0 0 2.666 0.8 - 77%
January - 2018
Completed.
1305
(OG)
130576-Completion of left over incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II).
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 20.55 18.986 0 0 0 0 18.986 1.564 - 92%
January - 2018
Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched.
1) Sundal bridge PK-93 2) RCC bridge Patrak PK-92
1305
(OG)
130576-Completion of leftover incomplete Schemes of Roads and Bridges in Khyber Pakhtunkhwa (Phase-II).
Provincial
30-11--1 30-11--1 - 30-11--1 - 216.417 161.073 27.905 13.977 7 0 161.073 0 - -
January - 2018
Bannu + Dir Lower: Completed Dir Upper: Sundal bridge PK-93 - completed. RCC bridge Patrak PK-92 - RW in progress, girders launched. Chitral: PC-I/DCE for Rs.34.330 m submitted to SOR on 25/10/2016.
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Abbottabad
30-11--1 30-11--1 - 30-11--1 - 240 107.586 20 20 20 4.531 112.117 112.414 53% 47%
January - 2018
Work in progress.
Various road in PK-48 Abbottabad
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Bannu
30-11--1 30-11--1 - 30-11--1 - 50 39.202 6 6 6 1 40.202 4.798 90% 80%
January - 2018
4/5 Km completed.
1) Balalay Adda to Hindi Khel (3 Km) 2) Dheray to Muhammad Khel (2 Km)
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Battagram
30-11--1 30-11--1 - 30-11--1 - 50 0 0 0 0 0 0 50 - -
January - 2018
Work started (3 units).
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Buner
30-11--1 30-11--1 - 30-11--1 - 187.05 73.81 0 3 3 3 76.81 113.24 - 41%
January - 2018
Out of 10 units, all in progress.
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 43.64 33.416 0 0 0 0 33.416 10.224 - 77%
January - 2018
Bacha Bridge to Taufiq Abad - completed. Various roads in Shabqadar - in progress. Procurement under process.
1) (a) Road from Bacha Bridge to Taufiq Abad (b) Various roads in Shabqadar (Construction of 5 Nos roads in PK-22(1) Mian Qilla to Dhando Pul 0.1 Km
2) Yakka Ghund road to Said Wali Koroona Gunar Colony 0.1 Km
3) Ali Khani Qazristan to Kabli 0.7 Km
4) Charai School ot Malik Abad Matta 1.30 Km
5) Pir Qilla taking off from Amir Abad Hussain House to Dalazak 700 mtr)
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Chitral
30-11--1 30-11--1 - 30-11--1 - 10 11 0 0 0 0 11 0 - 100%
January - 2018
Completed.
Garam Chashma road Singoor/Drosh Area
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
D.I.Khan
HW
30-11--1 30-11--1 - 30-11--1 - 49.752 40.7 0 0 0 0 40.7 9.052 - 82%
January - 2018
Completed (11.56 Km).
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Dir Lower
30-11--1 30-11--1 - 30-11--1 - 114.161 0 8 16 16 16 16 106.161 7% 14%
January - 2018
3 Km - 2 Km BT completed.
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Dir Upper
30-11--1 30-11--1 - 30-11--1 - 80.103 17 0 0 0 0 17 63.103 - 21%
January - 2018
Khall Kozkaly road PK-93, Garawonai road PK-91 - work order issued. Suspension bridge Sahib Abad - post-qualification of contractor under process.
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Hangu
30-11--1 30-11--1 - 30-11--1 - 45 0 2 2 2 2 2 43 4% 4%
January - 2018
8/12 completed. 2/12 units in progress, earth work, structure work, sub base, WBM in progress. 2 units re-tendering in progress.
12 units
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Haripur
30-11--1 30-11--1 - 30-11--1 - 68.5 0 0 0 0 0 0 68.5 - -
January - 2018
Work in progress (5 units).
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Karak
30-11--1 30-11--1 - 30-11--1 - 76.63 23.08 3.5 3.5 3.5 2.209 25.289 50.05 35% 33%
January - 2018
Length 5 Km - out of 8 units,1 completed, 7 in progress.
1) BTR from Ambiri Killa Chowk Takhti Nasratti road to Ashraf Khan Koroona and Mukhkam Khel Chowkara (0.5 Km)
2) BTR from Takhte Nasrati to Zarki (0.7 Km)
3) BTR from Khoraki Killa to Alamsheri (1 Km)
4) BTR from Chokara to village Dawala (0.9 Km)
5) BTR from Lashti Killa to Inzar Banda (700 mtr)
6) BTR main Shakardara road to Makh Banda (1 Km)
7) BTR from Highway to Aya Khel Koroona road (452 mtr)
8) BTR from Malagi to Wargha Banda (1.12 Km)
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Kohat
30-11--1 30-11--1 - 30-11--1 - 40 16 7 7 7 3.767 19.767 17 58% 49%
January - 2018
Length 4 Km (9 units) - 4 units work not started, 5 units work in progress.
1) BTR Zyar Koi Shakardar Rural-II 2) PCC road Qabristan road Chambai 3) Jabar Hafti Kandao BTR Pakka Shakardara Rural-II 4) PCC road Darozai Banda Shakardara Rural-II 5) PCC road Bamaqam Gra Kalay Shakardara Rural-I 6) PCC rpad Faqir Hafti to Bara Talab Pakka Shakardara Rural-II 7) BTR Eid Gah road Shakardara
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Lakki Marwat
30-11--1 30-11--1 - 30-11--1 - 0 0 0 0 0 0 0 0 - -
January - 2018
PC-I/DCE submitted to SE Bannu.
1306
(OG)
140974-Construction / Widening / Improvement / Rehabilitation of Roads and Bridges (on need basis) in Khyber Pakhtunkhwa.
Mansehra
30-11--1 30-11--1 - 30-11--1 - 46.3 10.288 3 3 3 0 10.288 33.012 29% 22%
January - 2018
4 units - 2 units completed, 2 units work started.
1) Mohallah Zafar Abad road village Janglan District Mansehra 2) Village Kamal Ban on River Kunhar at Lohar Banda (270 sft) UC Kaghan PK-54 Phase-II Tehsil Balakot
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46