Progressive Review for the month(s) of : June - 2017,

Showing Page Number : 40 of 46

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks
1130
(OG)
120284-Dualization of Mardan Charsadda Road i/c Dargai Bypass and Rehabilitation of existing dual carriageway to Charsadda City Phase-II (14.5 Km), District Charsadda.
Charsadda
PKHA
14-05-13 - - 14-12-12 - 1394 1225 70 66.5 66.5 66.5 1291.5 99 93% 93%
June - 2017
10/14 Km completed, Dargai bypass (3 Km) in progress.
1131
(OG)
120295-Dualization of Charsadda - Tangi Road i/c Utmanzai Road Bypass District Charsadda (23 Kms).
Charsadda
PKHA
30-05-13 - - 14-12-12 - 1979.638 1646.151 40 448 448 448 2094.151 293.487 85% 100%
June - 2017
Length 23 Km - 18 Km sub base, 12 Km WBM, 13 Km asphaltic base completed. 3 bridges completed, 1 in progress.
1132
(OG)
140621-Dualization of Naguman Shabqadar Section of Provincial Highway S-A, District Charsadda (13 Km).
Charsadda
PKHA
19-02-16 - - 25-03-15 - 1609.96 280 100 227 227 227 507 1229.96 24% 31%
June - 2017
Land acquisition in progress. 6 Nos culverts, clearing and grubbing in progress.
1133
(OG)
150287-Improvement of Takht-e-Bhai Rajjar Road from Ghani Khan road to Saro Shah (14 Km), District Charsadda.
Charsadda
PKHA
- - - 21-01-16 - 1498.019 0 50 47.5 47.5 47.5 47.5 1448.019 3% 3%
June - 2017
Work in progress on 2 Nos culverts. Trees and stumps removed. 5 Nos culverts in progress.
1134
(OG)
130680-Improvement and widening of Malang Baba - Nizampur Road, Nowshera.
Nowshera
PKHA
15-09-14 - - 02-11-15 - 1726.703 995.999 150 212.5 212.5 212.5 1208.499 580.704 66% 70%
June - 2017
Length 21 Km - earth work 60%, sub base, base course, structure work in progress. Bridge and culverts in progress.
1135
(OG)
150764-F/S, Design and Construction of Swabi By-pass Road (12 Km).
Swabi
PKHA
- - - - Line Deptt 2266.44 0 15 0 0 0 0 0 - -
June - 2017
Feasibility study and detailed engineering design in porgress. PC-I/DCE submitted to competent forum for approval. Pre-PDWP held. Summary Submiited to CA for funding of scheme from ADP instead of ADB portfolio.
1136
(OG)
140620-Re-construction of Bridge at Tor Warsak Daggar & widening / improvement & BT of 18 Km leftover portion of Swarai Pir Qilla Puran Road, District Buner.
Buner
PKHA
21-10-15 - - 02-12-16 - 1017.223 30 53.39 49.871 49.871 49.871 79.871 933.833 8% 8%
June - 2017
Length 25 mtr - diversion, load test pile, pile 16/16, pile cape 3/3, pier shaft 5/5, transum 3/3, abutment A&B, RCC beam 12/12, deck slab 2/2, diaphragm 24/24, RW 44/240 completed.
1137
(OG)
140629-Construcction of Swat Motorway (Land Acquisition).
Swat
PKHA
10-06-14 - - 29-07-16 - 5850 4668.987 10 0 0 0 4668.987 1171.013 80% 80%
June - 2017
Land payment of all the mozas of all districts made to the concerend revenue officers. 56 Km land acquired and handed over to FWO.
1138
(OG)
140623-Construction of road from Balambat Timergara to Kalpani Maidan Link road District Dir Lower.
Dir Lower
PKHA
04-09-15 - - 07-01-15 - 318.69 145 50 47.5 47.5 47.5 192.5 123.69 61% 60%
June - 2017
Pack-1 - earth work 90% completed, structure work in progress. Pack-2 - earth work 85% completed, structure work in progress.
1139
(OG)
90397-F/S and Construction of road from Chukiathan to Sheringal and Patrak by FHA (36 Km) Dir Upper.
Dir Upper
PKHA
31-01-11 - - 07-01-15 - 1798.521 1251.587 50 407.5 407.5 407.5 1659.087 496.934 72% 92%
June - 2017
Length 32 Km - earth work 70%, sub-base 50%, WBM 50% completed, asphalt wearing course 1 Km completed.
1) Package-1 Km-0 to 9 (9 Kms)
2) Package-2 Km-9 to 16 (7 Kms)
3) Package-3 Km-17 to 24 (7 Kms)
4) Package-4 Km-24 to 31+797 m (7.8 Kms)
5) Package-5 3 Nos bridges
1140
(OG)
140829-Improvement of 25 Km leftover portion of Chukiyatan - Barawal - Shahi Road, District Dir Upper.
Dir Upper
PKHA
08-10-15 - - 19-02-15 - 988.52 200 50 47.5 47.5 47.5 247.5 738.52 25% 25%
June - 2017
Length 25 Km. Pack-1 - earth work 6.2/8 Km completed. Pack- 2 - earth work 6.2/8 Km completed. Pack-3 and 4 - earth work started.
1141
(OG)
150890-Rehabilitation / Black Topping of Chukyatan to Barawal Bandai Road, District Dir Upper.
Dir Upper
PKHA
- - - - - 344.978 0 50 167.5 167.5 167.5 167.5 294.978 14% 49%
June - 2017
Structure/road work in progress.
1142
(OG)
140619-Widening / Dualization of Muree Chowk - Thandiani Chowk and Nawasher Link Road District Abbottabad.
Abbottabad
PKHA
29-12-15 - - 07-01-15 - 983.904 357 50 97.5 97.5 97.5 454.5 576.904 41% 46%
June - 2017
Length 7.1 Km - Pack-1, 2 and 3 - work started. Shifting of utilities in progress.
1143
(OG)
140877-Construction of Haripur Bypass Road (23 Km).
Haripur
PKHA
30-09-15 - - 28-01-15 - 3712.05 980 500 675 675 675 1655 2232.05 40% 45%
June - 2017
Length 23 Km - Pack-1 to 6 work started. Land acquisition payment completed. P&D directed DG M&E to examine revised PC-I and submit recommendations.
1144
(OG)
20665-Construction / Supervision of new Road Works.
Provincial
PKHA
20-06-06 - - 20-03-06 - 1104.58 870.354 40 38 38 38 908.354 194.226 82% 82%
June - 2017
Construction supervision of new road works.
1145
(OG)
20675-F/S and Design of Projects of Various Roads.
Provincial
PKHA
15-10-10 - - 23-08-11 - 253.57 153.496 25 23.75 23.75 23.75 177.246 75.074 70% 70%
June - 2017
Conusltancy services for feasilbility study and design and framing PC-I.
1146
(OG)
130198-Establishment of Axle Load Control Regime on Provincial Highways at 5-Stations.
Provincial
PKHA
21-11-15 - - 17-04-14 - 498.16 131.25 10 9.5 9.5 9.5 140.75 356.91 28% 28%
June - 2017
8 weight station as per revised PC-I. Work started at 5 Nos sites. Work order issued for 3 additional sites.
1147
(OG)
140624-Dualization of Sherkot Hangu Section of Provincial Highway S-7 (24 Km), District Kohat and Hangu.
Hangu
PKHA
21-10-15 - - 25-03-15 - 2759.858 220 40 289.99 289.99 289.99 509.99 2499.858 9% 18%
June - 2017
Pack-1 (6 Km) - embankment, in progress Km-1, 3, 4, 5, clearing/grubbing and NGC 90% completed. Pack-2 (6 Km) - Km-9, 10, 11 hillside cutting, RW in progress. Pack-3 (6 Km) - embankment in progress Km-16, 17, clearing/grubbing and NGC 80% completed. Pack-4 (6 Km) - clearing/grubbing Km-19, 20, embankment in progress. Pack-5 (4 bridges) - contractor machinery and staff mobilized on site. Design awaited for bridge pile from design consultant.
1148
(OG)
140878-Improvement & Widening of Nizampur - Kohat road (64 Kms), District Nowshera & Kohat.
Nowshera
PKHA
04-09-15 - - 28-01-15 - 2796.766 427.25 50 279.43 279.43 279.43 706.68 2319.516 17% 25%
June - 2017
Pack-1 (7.3 Km) - earth work in progress, culverts and bridges in progress. Pack-2 (11.05 Km) - earth work, bridge and culverts in progress. Pack-3 (10 Km) - hillside cutting 90% completed. Pack-4 (8.55 Km) - earth work and culverts in progress. Pack-5 (10 Km) - earth work in progress.. Pack-6 (12.553 Km) - earth work in progress. Km-52 to 55 - clearing, grubbing and NGC in progress. Bridge at Km-52+600, 54+360 and 64+100 - confirmatory bore in progress.
1149
(OG)
160193-Project Directorate for Swat Expressway.
Swat
PKHA
01-08-16 - - 05-08-16 - 67.401 0 16.67 15.837 15.837 15.837 15.837 50.731 25% 23%
June - 2017
Project directorate setup.
1150
(OG)
160248-Project Implementation Unit (PIU) ADB Assisted "Provincial Road Rehabilitation Project".
Provincial
PKHA
- - - 02-12-16 - 59.318 0 15 14.25 14.25 14.25 14.25 44.318 25% 24%
June - 2017
PIU setup, staff deputed. Revised AA approved.
1151
(OG)
160251-Construction of Swat Motorway Phase-I VGF Component for 2016-17.
Swat
PKHA
- - - 29-07-16 - 6000 0 3000 6000 6000 6000 6000 3000 50% 100%
June - 2017
56 Km land handed over for physical work. Topographic survey for design completed in 56 Km. Concrete batch plant created in 2 Km.
1152
(New)
160630-F/S, Design and Construction of Flyover from Kanju Bridge to Mingora, District Swat.
Swat
PKHA
- - - - Line Deptt 30 0 20 0 0 0 0 10 67% -
June - 2017
PC-II for Rs.30 m approved in DDWP-I on 19/07/2016. Consultant selected. Feasibility/survey completed. Option finalized, detail design in progress.
1153
(New)
160631-F/S and Design of Expressway from Chakdara to Mingora City, District Swat.
Swat
PKHA
- - - - - 50 0 20 0 0 0 0 30 40% -
June - 2017
PC-II for Rs.50 m approved in DDWP-I on 19/07/2016. Consultant selected. Feasibility/survey completed. Alignment finalized. Detail survey in progress.
1154
(New)
160442-Constrcution of New RCC Bridge at Khazana Bypass over River Panjkora District Lower Dir (SDG).
Dir Lower
PKHA
- - - - Line Deptt 3.75 0 30 0 0 0 0 0 100% -
June - 2017
PC-II for Rs.3.750 m approved in DDWP-I on 19/07/2016. Consultant selected. Survey completed. PC-I/DCE under preparation.
1155
(New)
160249-Provincial Roads Rehabilitation Project "Under PKHA Portfolio" (ADB Assisted).
Peshawar
PKHA
- - - - Line Deptt 2250 0 20 0 0 0 0 0 - -
June - 2017
Under process with ADB. Meeting with ADB held on 07/12/2016 and finalized portfolio.
1155
(New)
160249-Provincial Roads Rehabilitation Project "Under PKHA Portfolio" (ADB Assisted).
Peshawar
PKHA
- - - - Line Deptt 15351 0 200 0 0 0 0 0 - -
June - 2017
Under process with ADB. Meeting with ADB held on 07/12/2016 and finalized portfolio.
1156
(New)
160450-Feasibility Study for Project Preparatory and Technical Assistance for Provincial road Rehabilitation Project (ADB Assisted).
Peshawar
PKHA
- 30-06-17 - - Line Deptt 0.01 0 0.01 0.01 0.01 0.01 0.01 0 - -
June - 2017
PPTA consultancy TOR will be submitted by ADB. PC-II for 1 million USD submitted to Chief Infra on 19/01/2017.
1156
(New)
160450-Feasibility Study for Project Preparatory and Technical Assistance for Provincial road Rehabilitation Project (ADB Assisted).
Peshawar
PKHA
- 30-06-17 - - Line Deptt 1000 0 1000 0 0 0 0 0 - -
June - 2017
PPTA consultancy TOR will be submitted by ADB. PC-II for 1 million USD submitted to Chief Infra on 19/01/2017.
1157
(OG)
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted).
F. Aided
PMU
15-03-11 - - 22-04-04 - 14594.25 12652.99 2553.84 2553.84 1703.55 1055.305 13708.295 0 100% 94%
June - 2017
Total 522 Km - Provl Highways 100.81 Km, 100.85 Km, Distt road 425.55 Km, 405.89 Km, Bridges length 699.55 mtrs (10 Nos), 482.25 mtr (9 Nos) completed.
18 districts of Khyber Pakhtunkhwa
Upto till Release Jan-2016 Rs.1304.09 m
1157
(OG)
31038-Emergency Rural Roads Rehabilitation Project (JICA Assisted).
F. Aided
PMU
15-03-11 - - 22-04-04 - 100 10.81 5 0 0 0 10.81 84.19 16% 11%
June - 2017
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Bannu
15-04-13 - - 25-10-11 - 114.982 131.482 0 0 0 0 131.482 0 - 100%
June - 2017
Completed.
1) RCC Bridge Ghundakai (PK-72)
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Battagram
01-11-12 - - 25-10-11 - 48.69 52.91 2.5 2.5 2.5 2.5 55.41 0 100% 100%
June - 2017
Completed (bridge span 45 mtr).
RCC Bridge on Nandehar Khawar at Deshan Hotel PK-59
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Buner
- - - 11-03-16 - 100.651 28 28 28 28 28 56 44.651 56% 56%
June - 2017
Bridge structure completed, approaches in progress.
1) RCC bridge on Barundu Khawar
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Dir Lower
06-12-12 - - 25-10-11 - 103.908 122.015 0 0 0 0 122.015 0 - 100%
June - 2017
Completed.
a) RCC Bridge at Badin Khawar Summer Bagh
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Lakki Marwat
15-09-15 - - 25-10-11 - 116.283 97.265 31.19 31.19 31.19 31.19 128.455 0 100% 100%
June - 2017
Completed.
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Mansehra
06-12-11 - - 25-10-11 - 59.85 68.02 0 0 0 0 68.02 0 - 100%
June - 2017
Completed.
1) Mansehra City Bridge PK-53
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Mardan
HW
29-09-11 - - 25-10-11 - 349.12 295.181 3.003 3.003 3.003 3.003 298.184 50.936 85% 85%
June - 2017
4/5 bridges completed, 1 in progress (Mayar Bridge) lauching in porgress.
1) RCC bridge over Kalpani Nullah on main road between village Mayar & village Shamat Pur PK-25 (120 m span) 3 span
2) RCC bridge in Gidder Mehmood Abad PK-25 (30 m span)
3) Bridge linking Shamilat Zarifee and Safi Abad PK-27 (50-M span)
4) RCC bridge at Kaudoro PK-27 (27 m span) 2 span
5) RCC bridge at Hamza Kot RD-157000 Machi Branch PK-29 (24 m span) 4 span
6) Bridge on under construction Malandray Masoom Baba road PK-29 (24 m span) 2 span
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Nowshera
HW
01-08-12 - - 25-10-11 - 45 48.737 0 0 0 0 48.737 0 - 100%
June - 2017
Completed.
1) RCC bridge at Qasim Ali Baig (Taru)
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
Provincial
29-09-11 - - 22-01-15 - 918.425 898.308 80 64.693 64.693 64.693 963.001 0 100% 100%
June - 2017
Work in progress (Umbrella).
1158
(OG)
100429-Construction of 13 Nos RCC Bridges in Khyber Pakhtunkhwa.
PS
- - - 25-10-11 - 0 2.2 0 0 0 0 2.2 0 - -
June - 2017
1159
(OG)
110388-Constn: of Abutments and Lauching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).
D.I.Khan
HW
28-02-12 - - 23-12-16 - 49.569 38.5 0 0 0 0 38.5 11.069 - 78%
June - 2017
Completed.
1) Diyal bridge (200 feet span)
1159
(OG)
110388-Constn: of Abutments and Lauching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).
Dir Lower
- - - 23-12-16 - 2.515 18.78 0 0 0 0 18.78 0 - 100%
June - 2017
1) Payment to Pak Army for launching of ACROW Steel Bridges at Distt Dir Upper and Lower
1159
(OG)
110388-Constn: of Abutments and Lauching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).
Dir Upper
14-08-12 - - 23-12-16 - 22.285 18.78 0 0 0 0 18.78 3.505 - 84%
June - 2017
Completed.
1) Shomai bridge
2) Payment to Pak Army for launching of ACROW Steel Bridges at Distt Dir Upper and Lower
1159
(OG)
110388-Constn: of Abutments and Lauching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).
Provincial
02-02-12 - - 23-12-16 - 764 279.438 45 13.464 13.464 13.464 292.902 0 - -
June - 2017
1159
(OG)
110388-Constn: of Abutments and Lauching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).
Swat
HW
05-01-12 - - 23-12-16 - 174.45 155.188 0.515 0.515 0.515 0.515 155.703 18.747 89% 89%
June - 2017
Out of 7 bridges, 6 completed, 1 launching under process (Rahim Abad Bridge).
1) Mula Baba Bridge
2) Amankot (Rahim Abad) Bridge
3) Rahim Abad Bridge
4) Barikot (Babaji Baba) Bridge
5) Faiz Abad Bridge
6) Kuz Kalay Khwaza Khela Bypass bridge
7) Chinkolai Faqira Bridge
8) Payment to Pak Army for launching of ACROW Steel Bridges at Distt Swat
1159
(OG)
110388-Constn: of Abutments and Lauching of Canadian Steel Bridges provided to Pak Army for Khyber Pakhtunkhwa (CIDA Assisted).
Tank
01-10-12 - - 23-12-16 - 67.825 17.902 12.95 12.95 12.95 12.95 30.852 36.973 45% 45%
June - 2017
18/18 piles completed. Both abutments completed.
1) Shah Alam bridge (180 feet)
1160
(OG)
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa.
Lakki Marwat
- - - 02-05-14 - 6.05 3.635 1.633 1.633 1.633 1.633 5.268 0.782 87% 87%
June - 2017
PC-II approved. Consultant selected.
1160
(OG)
130391-F/S, Detailed Design and Supervision for RCC Bridges in Khyber Pakhtunkhwa.
Provincial
- - - 02-04-14 - 100 4.135 10 1.632 1.632 1.632 5.767 0 - -
June - 2017
PC-II approved.
1161
(OG)
130510-Feasibility Study, Detailed Designing and Supervision of various roads of C&W Khyber Pakhtunkhwa.
Provincial
- - - 23-12-13 - 100 2.473 10 0 0 0 2.473 0 - -
June - 2017
PC-II approved.