Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : February - 2017,

Showing Page Number : 37 of 45

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks
1017
(OG)
150835-Construction of RCC Bridges at Hajiabad, Munjai & Nasafa, Kano, Dir Lower.
Dir Lower
- - - 03-11-16 - 99.296 0 5 5 0 0 0 94.296 5% -
February - 2017
Pre-qualification invited on 28/12/2016. Tender called on 20/02/2017. Tender submitted for approval to CE North.
RCC Bridges in Dir Lower (4 Nos) (a) RCC Bridge at Munjai
1018
(OG)
150837-Construction & Black Topping of Gudhar Takurro road UC Munda and Danjarri to Ijjara, Nawey Kallay, Bota & Qaziabad Tatar road Dir Lower.
Dir Lower
- - - 02-11-15 - 199.796 10 5 16.36 16.25 16.25 26.25 184.796 8% 13%
February - 2017
Length 12 Km - work in progress on all 6 units.
1019
(OG)
150838-Construction of RCC bridges Raidgay (Kotkay) & Gul Khawarr Maidan Dir Lower.
Dir Lower
- - - 03-11-16 - 190.549 0 5 5 0 0 0 185.549 3% -
February - 2017
Tender called on 20/02/2017. Financial bid submitted to CE for approval.
RCC Bridges in Dir Lower (a) RCC Bridge at Raidgay (Kotkay) (b) RCC Bridge at Gul Khawar Maidan
1020
(OG)
150839-Const of (a) Asband Swat (3 Km) (b) Shursheen (c) Joro Kashmir (2 Km) (d) Ghazo Chat Pat (e) Deghan (1 Km) (f) Dheri Tesko (3 Km) (g) Oskai (1.5 Km) (i) Laiko (1 Km) (j) Naw Kalay Bochake (2 Km) (k) Mayar Dogha (2 Km) Dir Lower.
Dir Lower
- - - 02-12-16 - 400 8.75 250 224.579 162.079 67.891 76.641 141.25 65% 19%
February - 2017
27 Km road. 6 Km completed. 5 Km in progress. Work order issued for 16 Km.
1021
(OG)
150963-Construction / Rehabiliation of roads Pato Atak & Barikot, Rabat Assigay Laram Danda, Sarbanda, Dod Khana, Shati, Mali, Watangay, Malakand Kohrey, Gadla, Banda, Karam Khel, Sparay, Danwa, Rani & Ghwaago Distt Dir Lower.
Dir Lower
- - - 02-11-15 - 369.278 15 20 78.886 68.886 60.136 75.136 334.278 9% 20%
February - 2017
Out of 17 units, 3 Km BT work in progress in all 17 units.
1022
(OG)
150964-Construction / Rehabiliation of roads Shaneey, Masho-Chinaroona, Banda Khonko Cheeno Dherey, Chinar Tangay, Ahmad Gali, Macho, Katon, Gumbat Amlok Dara, Chaman Abad, Seyar Gay, Yar Khan Banda & Nagri-Gumbat Kay, Anangro Khwar & Hajiabad Distt Dir Lower.
Dir Lower
- - - 02-11-15 - 367.574 15 20 73.424 63.424 54.674 69.674 332.574 10% 19%
February - 2017
Out of 20 units, all in progress. 4 Km BT.
1023
(OG)
150965-Construction / Black Topping of roads Raindalay & Kakas road UC Miskini, Union Council Mayar road, Union Council Samar Bagh and UC Kambat Road Dir Lower.
Dir Lower
- - - 02-11-15 - 275.308 5 5 13.193 11.943 11.943 16.943 265.308 4% 6%
February - 2017
Out of 18 units, all in progress.
1024
(OG)
150966-Construciton of RCC Bridge at Matako Rahim Abad District Dir Lower.
Dir Lower
- - - 08-08-16 - 49.733 0 15 15 11.25 11.25 11.25 34.733 30% 23%
February - 2017
Test pile 18/24 completed. Girder in progress.
1025
(OG)
150967-Construction of roads from Odigram to Haya Sairay, Odigram to Lajbook & Shahko, Kadh road and Shudas to Fazal Abad, Maimai road, Kumbatar to Burkhanay Nambaty Dir Lower.
Dir Lower
- - - 02-11-15 - 278.061 12.5 5 29.579 29.579 29.578 42.078 260.561 6% 15%
February - 2017
Out of 6 units, work in progress on all units.
1026
(OG)
100382-Construction of Sairay Kalkot to Thall Kumrat road 10 Km, Dir Upper.
Dir Upper
11-10-12 - - 11-02-15 - 255.368 157.004 5 5 3.75 3.75 160.754 93.364 63% 63%
February - 2017
10 Km - earth, structure, road work completed. 10 Km road surfacing PCC completed.
PK-92 (Km-1 to 10)
1027
(OG)
130577-Construction of 3 Nos RCC Bridges i.e. Surbat, Dogai and Garonai District Dir Upper.
Dir Upper
- 30-06-17 - 03-12-14 - 81.095 57.176 23.919 23.919 17.937 17.884 75.06 0 100% 93%
February - 2017
All 3 bridges completed except approaches.
1) Surbat bridge
2) Dogal bridge
3) Garawonai bridge
1028
(OG)
140648-Construction of RCC Bridge at Khal Barkalay Bazaar PK-93 District Dir Upper.
Dir Upper
- 30-06-17 - 16-12-14 - 53.699 43.158 10.541 10.541 7.905 7.905 51.063 0 100% 95%
February - 2017
36/36 pile, 23/23 piles, right side abutment, 2/2 pile shift, 8/20 girders completed, 15 girders casted.
1029
(OG)
140650-F/S, Design, Improvement & BT of Shingara Darra Road (8 Km) Dir Upper.
Dir Upper
01-07-15 - - 22-01-15 - 120 20 10 31.848 29.348 28.847 48.847 90 25% 41%
February - 2017
Length 8 Km - earth work, structure work in progress.
1030
(OG)
140902-F/S, Design & Improvement, Rehabilitation and BT of Hattan Darra Road, Dir Upper.
Dir Upper
01-07-15 - - 22-01-15 - 100 20 15 28.655 24.905 16.277 36.277 65 35% 36%
February - 2017
Length 5 Km - structure work on both side in progress.
1031
(OG)
140903-Construction of PCC Road Samang Gulwadai Dara - 10 Km, District Dir Upper.
Dir Upper
01-07-15 - - - - 166.565 20 5 5 3.75 3.75 23.75 141.565 15% 14%
February - 2017
Length 10 Km - earth, structure work in progress.
1032
(OG)
140905-Construction of PCC Roads at Usherai Dara (10 Km), Dir Upper.
Dir Upper
01-07-15 - - - - 166.99 20 50 47.5 35 35 55 96.99 42% 33%
February - 2017
Length 10 Km - structure work on both side, PCC road in progress.
1033
(OG)
140906-F/S, design and Widening & Rehabilitation of Nehagadra road (Phase-I) (27 Km) Dir Upper.
Dir Upper
- - - 11-02-15 - 380.856 66.7 10 10 7.5 6.567 73.267 304.156 20% 19%
February - 2017
Length 27 Km - earth work, structure work, sub base in progress.
1034
(OG)
140979-F/S & Design of (a) Improvement & Rehabilitatioin of Dodba to Sheringal Swany Road (15 Km) including 3 Nos Bridges (b) Construction of RCC Bridge at Kotkay UC Sultan Khel District Dir Upper.
Dir Upper
- - - 25-03-15 - 597.77 65.359 10 15.462 12.962 10.459 75.818 522.411 13% 13%
February - 2017
(a) 17 Km road (4 packages) - in progress in 13 Km. (b) 32/32 pile, 8 girders completed (Kotkay bridge).
1035
(OG)
150827-(a) Rehabilitaiton / Reconstruction of roads Ala Salamkot, Dobando Dara, Nasrat Dara, Darora Sharamkand & (b) Const of Maj General Sanullah Shaheed road at Dir Upper.
Dir Upper
- - - 02-11-15 - 279 3.75 5 45.965 44.715 44.215 47.965 270.25 3% 17%
February - 2017
5 units - work in progress.
PK-91
1036
(OG)
150829-Rehabilitation / Reconstruction of (a) RCC roads Kumrat, Badgoai & Jandrai Road (b) Doag Dara, Usorai Dara, Kadi Khel Dara Dir Upper.
Dir Upper
- - - 02-11-15 - 325.5 15 5 32.31 31.06 29.143 44.143 305.5 6% 14%
February - 2017
6 units - all in progress.
PK-92
1037
(OG)
150833-Rehab / Reconstn of Sultan Khail Dara (left & right), Roghano Darra & Karro Darra road (left & right), Lugman Banda via Adhokay and Safaray Qamar Tall Distt: Dir Upper.
Dir Upper
- - - 21-01-16 - 300 10 10 10 7.5 7.493 17.493 280 7% 6%
February - 2017
Out of 8 units, all in progress.
PK-93
1038
(OG)
150988-Construction of RCC Bridges at Swausar Kasai, Gulibagh & Sromanzai Dir Upper.
Dir Upper
- - - - Line Deptt 100 0 5 5 0 0 0 0 - -
February - 2017
Fresh directive issued for 3 bridges on 24/11/2016, summary submitted to CA for approval for enhancement of ADP cost. Summary will be re-submitted to CA for decision after receipt of mid year review meeting.
PK-91
1039
(OG)
151071-Construction / Rehabilitation of Dir Mattaka Road, Dir Upper.
Dir Upper
- - - 16-10-15 - 50 5 5 5 3.75 3.75 8.75 40 20% 18%
February - 2017
Length 25 Km - earth work, structure work in progress.
PK-91
1040
(OG)
151076-Construction of Nehag Dara Road (Phase-II) District Dir Upper.
Dir Upper
- - - 09-02-16 - 200 0 10 10 7.5 7.5 7.5 190 5% 4%
February - 2017
Earth work 90% completed.
PK-93
1041
(OG)
151082-Construction of Bridge on Patrak-Kumrat Road.
Dir Upper
- - - - - 24.712 0 10 10 0 0 0 14.712 40% -
February - 2017
Work order issued.
PK-92
1042
(OG)
70210-Construction of Khan Abdul Wali Khan By-pass road District Chitral.
Chitral
16-01-10 - - 18-05-11 - 788.857 686.114 40 40 30 20 706.114 62.743 92% 90%
February - 2017
Length 3.6 Km - substantialy completed..
1043
(OG)
70216-Improvement / Black Topping of Booni, Mastuj Shandoor Road (70 Km) at Chitral (PSDP Funded).
Chitral
02-05-08 - - 09-03-15 - 2323.914 204.101 10 5 2.5 0 204.101 2109.813 9% 9%
February - 2017
Federalization of road in progress.
1043
(OG)
70216-Improvement / Black Topping of Booni, Mastuj Shandoor Road (70 Km) at Chitral (PSDP Funded).
Chitral
02-05-08 - - 09-03-15 - 2323.914 204.101 250 250 2.5 0 204.101 1869.813 20% 9%
February - 2017
Federalization of road in progress.
1044
(OG)
90417-Widening & Carpeting of Booni Buzand Torkhow road (28 Km) District Chitral (PSDP Funded).
Chitral
01-06-10 - - 09-03-15 - 1108.42 199.774 10 15 12.5 10 209.774 898.646 19% 19%
February - 2017
Length 28 Km - earth work, structure work, road work in progress.
1044
(OG)
90417-Widening & Carpeting of Booni Buzand Torkhow road (28 Km) District Chitral (PSDP Funded).
Chitral
01-06-10 - - 09-03-15 - 1108.42 199.774 250 250 0 0 199.774 658.646 41% 18%
February - 2017
Length 28 Km - earth work, structure work, road work in progress.
1045
(OG)
140967-F/S, Design & Construction of (a) Chamtalai to Taroghai road District Swat (b) Garam Chashma to Kandujal Road, District Chitral (9 Km).
Chitral
- - - 11-02-15 - 130 5.142 5 7.5 7.5 2.5 7.642 119.858 8% 6%
February - 2017
RCC bridge in progress, 2 Km road work restarted.
1045
(OG)
140967-F/S, Design & Construction of (a) Chamtalai to Taroghai road District Swat (b) Garam Chashma to Kandujal Road, District Chitral (9 Km).
Provincial
28-10-15 - - 11-02-15 - 199.75 20.183 10 10 7.5 6.25 26.433 0 - -
February - 2017
Work in progress.
1045
(OG)
140967-F/S, Design & Construction of (a) Chamtalai to Taroghai road District Swat (b) Garam Chashma to Kandujal Road, District Chitral (9 Km).
Swat
HW
28-10-15 - - 11-02-15 - 69.75 12.183 3.75 3.75 3.75 3.75 15.933 53.817 23% 23%
February - 2017
Length 4.5 Km - earth work completed, sub-base and structure work in progress.
1046
(OG)
140984-F/S, Design and Construction of RCC Bridge at Ayun, Chitral.
Chitral
- - - 02-12-16 - 84.002 0 5 5 0 0 0 79.002 6% -
February - 2017
Tender invited from pre-qualified contractor on 15/03/2017.
1047
(OG)
150822-Realignment and Black Topping of Garam Chashma road from Shaghore to Mough including bridges District Chitral.
Chitral
- - - - Line Deptt 1293 0 5 5 0 0 0 0 - -
February - 2017
Scheme federalized. NHA started survey and DCE.
1048
(OG)
150824-Construction / rehabilitation / widening / completion of incomplete Molkoh road, Boni bridge to Boni Bazar via Bazar to Government Guest House in Tehsil Mastuj District Chitral.
Chitral
- - - 02-11-15 - 83.43 7.5 5 5 3.75 3.75 11.25 70.93 15% 13%
February - 2017
Out of 3 units, all in progress.
1049
(OG)
150844-Construction / widening of roads Varijun to Terich, Jinjarit to Jinjarit Koh and Kosht to Loan District Chitral.
Chitral
- - - 02-11-15 - 75.851 7.5 10 29.348 29.348 26.848 34.348 58.351 23% 45%
February - 2017
Out of 3 units, all in progress.
1050
(OG)
160636-Reconstruction of washedway Mozh Gole Suspension bridge and approach Mulkhow due to flood in July August 2015 District Chitral.
Chitral
- - - 12-05-16 - 19.8 0 5 5 3.75 3.75 3.75 14.8 25% 19%
February - 2017
Physically completed.
1051
(OG)
160638-Restroation of flood affected roads and bridge etc. due to torrential and thunderstorm rain during mid August September 2015, District Chitral.
Chitral
- - - 12-05-16 - 15.01 0 10 10 7.5 6.878 6.878 5.01 67% 46%
February - 2017
Physically completed.
1052
(OG)
160639-Restoration of Rehun Power House road damaged due to torrential rain / glacial lake outburst flood (GLOF) in July & August 2015, District Chitral.
Chitral
- - - 12-05-16 - 12.627 0 5 5 3.75 3.75 3.75 7.627 40% 30%
February - 2017
Physically completed.
1053
(OG)
50209-Construction, BT & Rehabilitation of 14 Km road in District Kohistan.
Kohistan
05-09-07 - - 25-03-15 - 406.458 137.892 10 20.924 18.424 17.25 155.142 258.566 36% 38%
February - 2017
Length 14 Km - 4 Km completed. Km-1, 2, 13, 14 - earth work in Km 3, and 12 in progress.
1) Bataira to Mirbat Road PK-62 (B/W 7 Km)
2) Palas Bridge to Mehreen Road PK-62 (B/W 7 KM)
1054
(OG)
130420-Construction of Pre Stressed RCC Bridge over Indus River from KKH to Seo village at Dassu Kohistan.
Kohistan
15-05-10 - - 29-05-14 - 322.534 169.881 40 40 30 7.992 177.873 112.653 65% 55%
February - 2017
35/48 piles, 6/9 girder, left abutment completed. Piling on right side in progress. Right approach rod earth work completed. 1/2 pier in progerss. High level meeting on 20/01/2017 decided to transfer the scheme to WAPDA for execution.
1055
(OG)
140916-F/S, Design & Improvement / Construction of Mahreen to Mehar Bat road, Barparo road & Kanisher roads, Kohistan.
Kohistan
- - - 17-11-15 - 100 0 10 10 7.5 2.133 2.133 90 10% 2%
February - 2017
Work in progress. Work re-startd on 26/12/2016
1056
(OG)
150874-Black topping / widening of road from KKH to Pattan Bazar road, Shingle road in rural areas and Construction of suspension Bridges, Bailey Bridges and Bridge on Sindh River in District Kohistan.
Kohistan
- - - 17-11-15 - 200 0 10 10 7.5 7.5 7.5 190 5% 4%
February - 2017
4 units - 1 land acquisition under process, 2 in progress, 1 work started.
1) Construction of shingle road Bar Paro 3 Km
2) Construction of shingle road Kunsher 3 Km
1057
(OG)
150875-Construction of road from Shaha to Sput Valley, Gabar Naala Road and Dong Naala Road District Kohistan.
Kohistan
- - - 10-09-15 - 80 3.75 5 7.5 3.75 2.501 6.251 71.25 11% 8%
February - 2017
3 units - 1 earth work 100% completed, 2 work order issued.
1) Construction of road from Soha to Sput 3 Km
2) Construction of Gabber Nullah road 2 Km
3) Construction of Dong Nullah road 2 Km
1058
(OG)
141025-F/S, Design and Construction of Road from Darman Tangay to Pashto Road, Battagram (5 Kms).
Battagram
25-05-15 - - 28-01-15 - 69.8 32.25 11 4.25 1.5 1.25 33.5 26.55 62% 48%
February - 2017
Length 5 Km - earth work, sub-base, base course, masonry work in progress.
1059
(OG)
150845-Construction / Improvement and Black topping of internal roads of Tehsil Battagram District Battagram.
Battagram
- - - 03-11-16 - 136 0 10 10 0 0 0 126 7% -
February - 2017
Tender opend on 13/12/2016. Stay order issued by PHC.
1060
(OG)
150873-Construction / rehabilitation / widening road Chata Bata, Landay road, Chilar Sokadr, Sarkheli Banda, Chapar Gram Markhani and Batangi road District Battagram.
Battagram
06-03-16 - - 10-09-15 - 80 10.59 5 11.75 10.5 10.5 21.09 64.41 19% 26%
February - 2017
6 units - earth work, PCC road, masonry work in progress.
1061
(OG)
150946-F/S and Design for improvement / Rehabilitation of Oghi Battagram Road and Construction of RCC bridge at Biari Khwar, District Battagram.
Battagram
- - - 03-11-16 - 249.995 0 20 20 0 0 0 229.995 8% -
February - 2017
Work order issud.
1062
(OG)
140670-F/S, Design & Construction / Improvement of (a) Kulhari Gharbi Road (2.5 Km) (b) PCC Road from GHSS Baffa to Kharah (Kulhari Sharqi) & (c) Kulhari Sharqi Baffa (1 Km), District Mansehra.
Mansehra
30-05-15 30-06-17 - 13-02-15 - 50 33.6 8 8 6 2.402 36.002 8.4 83% 72%
February - 2017
Length 4.8 Km - 2.5 Km completed.
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45