Communication and Works Department

Annual Development Review


Search With ADP Advance Search
Home Page


Progressive Review for the month(s) of : January - 2018,

Showing Page Number : 36 of 46

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks
984
(OG)
141016-F/S, Design and Construction / Rehabilitation of Road from Karak City to Rehmat Abad, Karak (6 Km).
Karak
30-11--1 30-11--1 - 30-11--1 - 84 67.779 8.721 8.721 6.541 6.541 74.32 7.5 91% 88%
January - 2018
Length 6 Km - 6 Km BT completed. Structure work in progress.
PK-40 Karak
985
(OG)
141017-Dualization of Road from Indus Highway Chowk to Karak City, Karak (4.225 Km).
Karak
30-11--1 30-11--1 - 30-11--1 - 390.218 231.545 40 41.883 41.883 29.2 260.745 118.673 70% 67%
January - 2018
Length 4.225 Km - 3.2 Km both lane BT completed.
Karak
986
(OG)
150858-Construction / Rehabilitation of Road from (a) Nari Panoos to Teri Chowk Banda Daud Shah (b) BT from Kando Khel to Faqir Abad and Construction of Bridge at Kandawo Algada UC Sabir Abad, District Karak (10 Km).
Karak
30-11--1 30-11--1 - 30-11--1 - 150 29.5 20 22.222 22.222 17.1 46.6 100.5 33% 31%
January - 2018
Length 5 Km - WBM completed, BT 1 Km completed.
Karak
987
(OG)
150859-Construction and Black Topping of Road from Sarki Lawagher to Alam Sheri, District Karak (12 Km).
Karak
30-11--1 30-11--1 - 30-11--1 - 150 65.087 60 61.544 61.544 51.3 116.387 24.913 83% 78%
January - 2018
Length 12 Km - 7 Km WBM completed.
Karak
988
(OG)
140913-F/S, Design and Construction of RCC Bridge at Ziarat Sheikh Allah Dad Chorlaki Nizampur Road, Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 76.737 58.625 10 26.563 26.563 25.161 83.786 8.112 89% 100%
January - 2018
Bridge 42 mtr - completed, approaches 80% completed.
Nizampur road Kohat PK-37 (length 1500 mtr)
989
(OG)
140990-F/S, Design and Improvement / Rehabilitation of Road from Gulshan Abad Chowk to OTS Chowk via Jungle Khel (5 Km), Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 260.114 256.411 19.636 12.864 12.864 3.686 260.097 0 100% 100%
January - 2018
Completed (5 Km).
PK-38 Kohat
990
(OG)
150855-Construction & BT of Roads (a) Bahadar Kot Road, Bazi Khel Road, Bazi Khel road, Paracha Town Road (b) UC Kharmatu (c) UC Chorlakii (d) UC Khushal Garh, District Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 100 14.991 30 25.65 18.15 10.65 25.641 55.009 45% 26%
January - 2018
Length 12 Km - 3 Km asphalt completed.
1) BT Road of Bahadar Kot (2 Km)
2) BT Road of Bazid Khel (3 Km)
3) BT Road of Paracha Town (1 Km)
4) BT Road of UC Kharmato (2 Km)
5) BT Road of UC Chorlaki (2 Km)
6) BT Road of UC KhushalGarh (2 Km)
991
(OG)
150857-Construction and BT of Roads from Jarma Bridge to Mosam Khan Banda, Zara Mela to Botan Shareef Bannu road to Surgul Kamar Dhand Road, Shahpur Road UC Shahpur Lachi to Tableeghi Markaz Road UC Lachi, Rehman Abad Road UC Rural-II Shahdardara, District Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 99.91 69.803 44.857 44.857 22.428 5.813 75.616 0 100% 76%
January - 2018
Length 9.56 Km - 7.5 Km completed. Rahamabad + Lachi to Tebleghi Markaz (1.5 Km) - work started.
1) Jerma Bridge to Mosam Khan Banda (2 Km)
2) Zara Melato Botan Shareef (2 Km)
3) Bannu Road to Surgul (1 Km)
4) Kamar Dhand Road (1 Km)
5) Shahpur Road UC Shahpur (2 Km)
6) Lachi to Tablighi Markaz Raod UC Lachi (0.67 Km)
7) Rehman Abad Road UC Rural-II Shakardara (6.665 mtr)
992
(OG)
150962-Construction of PCC Roads at Togh-I, Togh-II, Bazid Khel, Sheikhan, Bahadar Kot, Dhoda, Ghulam Banda, Shadi Khel, Daud Khel, Dan Banda-1, Gumbat, Bilitang, Pershai, Gul House Banda, Marchungi, Rahdi Dhoke, Kata Kani, District Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 100.1 21.75 30 33.333 33.333 23.005 44.755 48.35 52% 45%
January - 2018
Length 10.25 Km - PCC 5/17 components completed.
1) PCC Road Togh-I
993
(OG)
150968-Const & BT of Roads (a) UC Urban-1, Tanga to Kitab Ghar, Mian Khel Bazar, Bannu Bazar, Railway Station (b) UC Urban-2, Quresh Abad to Eidgah, Akbarabad, Noorabad, Habib Banda to Ambar Banda, Regi Shino Khel, Terah Bazar to Police Line, Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 40 33.582 9.169 10.877 10.877 4.585 38.167 0 100% 95%
January - 2018
Completed (6.40 Km).
994
(OG)
150970-Construction & BT of Roads (a) UC-Urban-6, Mir Ahamd (b) UC Mohd Zai, Ublan Camp Nawy Kaly, Nawy Kaly to Lal Mela, Mohd Zai to Mian Garhi (c) UC Nasrat Khel, Dr Banda to Hangu Road, Kaghazai to Ambar Banda rd, Nasrat Khel Village rd, Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 40 39.414 12.261 5.288 2.223 2.222 41.636 0 100% 100%
January - 2018
Completed (6.31 Km).
995
(OG)
150972-Construction of PCC Roads of UCs (a) Urban-1 (b) Urban-2 (c) Urban-3 (d) Urban-4 (e) Urban-5 (f) UC Mohd Zai (g) Nasrat Khel (h) Ali Zai & (i) Sherkot, Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 50 24.735 39.765 44.888 44.888 6.859 31.594 0 100% 63%
January - 2018
Length 8.41 Km (23 units) - 3.5 Km (8 units) completed (PCC).
996
(OG)
150973-Construction and Blacktopping of Banda Fateh Khan Road Darmalak road, Darmalak to Ghorzandi road, Darsha Khel Road Rehman Abad Pakka road, Krappa Shakardara road including bridge & PCC Roads in Ucs, Sodhal, Lachi Rural, Mandori District Kohat.
Kohat
30-11--1 30-11--1 - 30-11--1 - 249.927 100.204 89.723 98.687 98.687 30.954 131.158 60 76% 52%
January - 2018
Bridge at Tarali - piles 50/80 completed, girders casting in progress. Approaches 35 % completed. Road 7.29 Km - 6.5 Km asphalt completed.
997
(OG)
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km).
Hangu
30-11--1 30-11--1 - 30-11--1 - 532.754 468.715 31.261 31.261 31.261 10.511 479.226 32.778 94% 90%
January - 2018
18.5/20 Km BT completed, structure work in progress.
20 Km under jurisdiction of this division
997
(OG)
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km).
Kohat
30-11--1 30-11--1 - 30-11--1 - 440.41 420.179 19.032 19.032 19.032 0 420.179 1.199 100% 95%
January - 2018
Completed (22.35 Km).
1) Package-II (22.35 Kms) from Lachi side
997
(OG)
80668-Construction of alternate Road Lachi to Hangu-Thall-Parachinar Road (41.80 Km).
Provincial
30-11--1 30-11--1 - 30-11--1 - 655.054 866.716 14.014 31.014 27.511 0 866.716 0 100% 100%
January - 2018
Work in progress.
998
(OG)
140652-F/S, Design and Construction / Improvement of Hangu Samana Main Road (10 Kms), District Hangu.
Hangu
30-11--1 30-11--1 - 30-11--1 - 100 56 44 44 22 5.643 61.643 0 100% 62%
January - 2018
Length 6 Km - 4 Km BT completed. 500 m WBM completed. Structure work in progress.
Hangu
999
(OG)
140907-F/S, Design, Improvement and Widening of Doaba Tora Wari Road, District Hangu (4.5 Km).
Hangu
30-11--1 30-11--1 - 30-11--1 - 50.614 37.195 5 5 3.75 3.75 40.945 8.419 83% 81%
January - 2018
Length 4.5 Km - 4.5 Km BT completed. Liabiilty of contractor Rs.19.16 m.
Hangu
1000
(OG)
150860-Construction / Rehabilitation of Road from (a) Bangash Chapper Road, Link Road at Shanawari to Wrasta, Darr Makhadu Quba road (b) Mula Tabi Road Samana, Nawa Killay Samana Road, District Hangu.
Hangu
30-11--1 30-11--1 - 30-11--1 - 150 36.301 24.647 26.623 26.623 14.912 51.213 89.052 41% 34%
January - 2018
4 units - 1.5 Km BT completed. WBM in progress on rest.
1) Bangash Chapper road (4.50 Km - 12 ft) 2) Link road at Shanawari to Wrasta (1.10 Km - 18 ft) 3) Darr Makhadu Quba road Samana (2.10 Km - 21 ft) 4) Mula Tabi road Samana (1 Km - 18 ft) 5) Navai Killay Samana road (1 Km  - 12 ft)
1001
(OG)
140628-Rehabilitation of Road from Chamkani to PAF Camp Badaber District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 160.238 0 20 17.1 7.1 0 0 140.238 12% -
January - 2018
Work on drain and sub-base in progress.
Peshawar
1002
(OG)
140678-F/S, Design and Construction of (1) BT of Road from Takht Abad to Liaqat Bagh via Babu Zai Jadeed 2 Km (2) Bridge over Shah Alam River (3) Culvert at Kata Behram Khan, District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 49.933 31.173 18.01 18.01 13.508 13.508 44.681 0.75 98% 89%
January - 2018
Bridge 60 mtr - bridge structure work and base course completed.
Peshawar
1003
(OG)
140942-Construction / Rehabilitation of Roads (a) Urmar Payan towards Kaskai Warsak Canal (b) Urmar Miana to Warsak Canal (c) Urmar Payan via Qasim Ali Baig to GT Road and (d) Urmar Payan to Mashan Khel, Peshawar (10 Km).
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 95.896 61.962 33.434 33.434 33.434 27.056 89.018 0.5 99% 93%
January - 2018
Length 10 Km - 10 Km asphalt completed. Rs.5 m demanded for completion.
Peshawar
1004
(OG)
140943-F/S, Design, Improvement & BT of Road from Mustajab Ghari to Shahibala (20 Km), Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 188.067 83.021 50 71.433 71.433 63.203 146.224 55.046 71% 78%
January - 2018
Length 20 Km - 8 Km asphalt, 12 Km base course completed. Structure work in progress. Rs.81 m demanded for tempo of work.
1005
(OG)
140944-F/S, Design and Construction of Road from Nothia Stop to Kohat Road and from Nothia Phattak to Swati Phattak, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 149.907 79.284 70.123 70.123 35.062 35.062 114.346 0.5 100% 76%
January - 2018
Length 10 Km - 5 Km asphalt completed, drain both side in progress. Rs.7.9 m demanded for completion.
1006
(OG)
140949-F/S, Design and Construction / Improvement of 15 Km Roads in PK-01, District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 149.814 59 10 8.55 6.05 6.05 65.05 80.814 46% 43%
January - 2018
Length 13 Km - 10 Km asphalt completed. Rs.89 m demanded for completion.
1007
(OG)
140950-F/S, Design and Dualization of 16 Km Road from Jamil Chowk (Ring Road) towards Urmar Payan Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 1046 397.815 100 99.585 99.585 99.585 497.4 548.185 48% 48%
January - 2018
8 Km asphaltic base completed on 4 Nos bridges, in progress. Rs.250 m demanded for tempo of work.
1008
(OG)
140951-Construction / Rehabilitation of 10 Km roads in PK-05, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 109.326 71.75 42.826 62.826 41.413 41.413 113.163 0 100% 100%
January - 2018
Length 10 Km - 10 Km asphalt completed. Rs.1 m demanded for completion.
1009
(OG)
140997-F/S, Design and Construction / Rehabilitation of Roads (a) Dalazak to Jala Bela (b) Butai to Ranoo Ghari - Kandi Kalo Khel (c) Charsadda Road to Takhta Abad (d) Budni Road to Dalazak Road via Wadpaga Peshawar (20 Km).
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 195.896 107.803 25 29.058 29.058 21.449 129.252 63.093 68% 66%
January - 2018
Length 20 Km - 14 Km asphalt completed, on remaining base course, structure work in progress. Rs.75.50 m demanded for completion.
1010
(OG)
141006-F/S, Design, Construction & BT of Roads (a) Achini Ada to Janazgah Sangu (b) Hazrat Baba to Waliabad (c) Moh: Haya Khel to Ring Road (d) Insaf Road to Gharoor Abad (e) Bazi Khel road (f) Canal road to Merozai road Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 120 64.655 61.345 61.345 61.344 61.2 125.855 0 100% 100%
January - 2018
Length 11 Km - 10 Km asphalt completed and structure work in progress. Rs.6.045 m demanded for completion.
1011
(OG)
150779-Construction / Improvement of Hasanghari Sheri Jahngi road, Khalsa 2 and surrounding areas road Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 150 9.5 10 18.794 18.794 3.55 13.05 130.5 13% 9%
January - 2018
Length 10 Km - 1.7 Km WB completed. Rs.60 m demanded for tempo of work.
1012
(OG)
150791-Construction / Widening / BT of internal roads of UC-31, UC-32, UC-33, UC-34, UC-35, UC-36 District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 99.882 28.405 10 13.672 13.672 13.672 42.077 61.477 38% 42%
January - 2018
Length 10 Km - 1.4 Km asphalt completed, drain work on all packages in progress. Rs.65 m demanded for tempo of work.
1013
(OG)
150792-Construction / Rehabilitation of internal roads of UC-Tehkal, UC Shaheen Town, University Town, Malkandher District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 99.736 59.998 10 21.355 21.355 6.05 66.048 29.738 70% 66%
January - 2018
Length 10 Km - 9 Km asphalt completed and structure work in progress. Rs.31 m demanded for tempo of work.
1014
(OG)
150794-Construction / Rehabilitation of Deh Bahadar, Chalozan Colony, Achni Bala Pishtakhara Bala, Sufaid Dheri roads, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 99.81 23.655 30 35.894 35.894 34.879 58.534 46.155 54% 59%
January - 2018
Length 9 Km - 6 Km asphalt completed. Structure work in progress.
1015
(OG)
150796-Construction / Rehabilitation of (a) warsak road People Stop to Chagharmatti and in UC Mathra (b) Badizi UC Reggi and (c) Hindu Kasay UC Panam Dheri District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 99.91 21.386 30 30.772 30.772 18.15 39.536 48.524 51% 40%
January - 2018
Length 9 Km - 3.8 Km asphalt completed. Structure work in progress. Rs.52.500 m demanded for tempo of work.
1016
(OG)
150799-Construction and Blacktopping of roads from Yousafabad to Gohi Arat Mera road, Nasapa Bala road, Toda to Muslim Abad, Mandra Khel road, Landi Sarak, Choli to Khurasan road, District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 30 15 15 15 7.5 7.5 22.5 0 100% 75%
January - 2018
Length 4 Km - substanially completed.
1017
(OG)
150801-(a) Improvement / Rehabilitation of service roads from Northern bypass upto Akbar Pura and Jaba Daudzai village PK-09 to PK-13 (b) Const/Rehab. of Mian Gujar to Charsadda road via Damne Afgani, Kharakay and Shakarpura etc road, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 200 88 50 72.628 72.628 30.25 118.25 62 69% 59%
January - 2018
Length 17 Km - 9 Km asphalt completed and on remaining structure work, base course work in progress. Rs.69.500 m demanded for tempo of work.
1018
(OG)
150802-(a) Const / Rehab Adezay to Sherkera (Ithad Chowk) to Hameed Khan (Machine) road (b) Rehabilitation of internal roads of UC Badaber Maira Korizay and construction of Maryam Zai Deli Dher road alongwith RCC Bridge, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 250 170.351 67.649 67.649 67.648 55.6 225.951 12 95% 90%
January - 2018
Length 20 Km - 19 Km asphalt completed and on remaining base course, structure work in progress. Tender approval of balance work under process.
1019
(OG)
150804-Construction / Rehabilitation of Chua Gujar road, Musazai Main road, Adda road Musazai, Sheikhan road Musazai, Eidgah road Musazai Faqirabad Chowk Towards Aziz Market, Warsak Canal & Frontier road, Afridi Abad road Sheikhan, Sheikhan Main road, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 50 13.962 35.788 35.788 35.788 30.786 44.748 0.25 100% 89%
January - 2018
Completed (4.5 Km).
1020
(OG)
150950-Construction of road from Garhi Taj Muhammad to Garhi Mir Tayyab road, Tubewell Koroona road, Mamo Khatki to Bela Baramad Khel, Haryana Bala road to Garhi Sher Afzal, Maqsood Abad road, District Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 30 10 20 20 15 15 25 0 100% 83%
January - 2018
Completed (4 Km).
1021
(OG)
150952-Construction / Rehabilitation of Haji Jalndhar Graveyard towards Warsak Canal, Police Chowki Afridi Abad towards Speen Qabar, Zangli Nehr Towards Sheen Rang, Sheikh Muhammadi Main road Towards Kohat road Toheedabad, Warsak Canal towards Kagawal, Peshawar.
Peshawar
HW
30-11--1 30-11--1 - 30-11--1 - 50 15.212 34.538 34.538 34.538 26.19 41.402 0.25 100% 83%
January - 2018
Completed (4 Km).
1022
(OG)
140889-F/S, Construction & BT of Road i/c Bridge from Pir Qala to Major Qala and Shabqadar Bazar to Kangra, Charsadda (14 Km).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 401.195 251.365 60 67.663 67.683 30 281.365 89.83 78% 70%
January - 2018
Length 10 Km - 4 Km asphalt completed.
PK-22 Charsadda
1023
(OG)
140890-F/S, Design, Reconstruction and Rehabilitation of Roads (a) from Alladad Khel to Village Kani Teshil Shabqadar (b) from Ziam Rest House to Salgaray via Gud Killi Chowk Shamsabad (c) from Village Cheena to Dildar Ghari, Charsadda (12 Km).
Charsadda
30-11--1 30-11--1 - 30-11--1 - 120 84.506 40.44 34.576 24.466 14.356 98.862 0 100% 82%
January - 2018
Length 12 Km - 6 Km asphalt completed. Revised PC-I/DCE for Rs.250 m submitted to P&D.
1) Allah Dad Khel to village Kani Tehil Shabqadar
2) Ziam Rest House to Salgaray via Gud Killi Chowk Shams Abad
3) Village Cheena to Dildar Garhi Charsadda
1024
(OG)
150818-Construction / rehabilitation / widening of road (a) Umerzai Yakhkoi to Turangzai, (b) Damdam to Hayat Gul Kalli Dedar Abad UC Sarki Titara, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 90 43.835 45.905 45.905 34.428 27.772 71.607 0.26 100% 80%
January - 2018
Length 6 Km - 4.5 Km asphalt completed.
Charsadda
1025
(OG)
150820-Construction of road from Harichand to Hayat Khan Banda and Bashir Khan Banda to Said Imran Kalay and Shakoor to Pumbaoosha via Kirmu, Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 230.917 42.06 54.69 46.76 33.087 33.087 75.147 134.167 42% 33%
January - 2018
Length 7 Km - 4 Km asphalt completed.
Charsadda
1026
(OG)
150823-Construction and Blacktopping of roads (a) Jandai Pul to Kakakhelo Dheri U/C Umerzai (b) Jangai to Shaberra U/C Agra, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 125 135.06 13.75 13.75 6.875 4.881 139.941 0 100% 100%
January - 2018
8.5 Km - completed.
Charsadda
1027
(OG)
150825-Construction and Blacktopping of roads (a) Shabqadar Chowk to Matta including Bridge, (b) Haji Zai to Yaqhi Band via Tarkha and Masal Qila to road via Mian Essa, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 350 40 60 133.064 118.064 43.595 83.595 250 29% 24%
January - 2018
Length 7 Km - 2 Km asphalt completed.
Charsadda
1028
(OG)
150881-Construction of road from Sardheri to Dosehra road, Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 40.5 12.25 28 28 21 16.94 29.19 0.25 99% 72%
January - 2018
Length 5 Km - 3 Km asphalt completed.
Charsadda
1029
(OG)
150948-Reconstruction & Rehabilitation of roads from Haryana to Hajizai, Nazimabad to Gujar Kali, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 150 45.076 3.478 2.974 1.235 0 45.076 101.446 32% 30%
January - 2018
4 Km (original scope) - 4 Km asphalt completed. Revised scope - work order issued.
Charsadda
1030
(OG)
150954-Construction and BT of road (a) Peshawar road to Kodai UC Agra (b) Koachaki to Ajon Kallay via Hassanabad Kandaro Kally UC Shodag, Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 325 51.755 43.867 37.506 15.573 15.573 67.328 229.378 29% 21%
January - 2018
8.5 Km (original scope) - 8.5 Km asphalt completed. Revised scope - Work order issued.
Charsadda
1031
(OG)
150980-Construction of Sarwar Abad Umarzai Road and Road from Shakh No.4 to Shakh No.5 via Zarbab Ghari Maira Umarzai, District Charsadda.
Charsadda
30-11--1 30-11--1 - 30-11--1 - 188.669 36.598 43.152 36.895 26.107 26.107 62.705 108.919 42% 33%
January - 2018
6.5 Km - 3 Km asphalt completed.
Charsadda
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46