Progressive Review for the month(s) of : February - 2017,

Showing Page Number : 35 of 45

Code Scheme Name District of Location Commen. Comple. PC - I Status Status
Date
Where
Pending
Cost
Orignnal / Revised
PFY Expenditure Original
Alloc.
Revised
Alloc.
Releases Expenditure Acc. Expenditure Throw Forward Targets Achievements Remarks
917
(OG)
151069-Construction of Sro Kalay Road from Yaka Ghund Road to Subhan Khwar, District Charsadda.
Charsadda
- - - 18-11-15 - 20 3.75 5 5 3.75 2.5 6.25 11.25 44% 31%
February - 2017
2 Km WBM completed, 40% structure work completed.
918
(OG)
140672-F/S, Design and Construction of Bridge at Kabul River connecting Mohib Banda / Pashtun Gharai on Right Bank and Kheshki on Left Bank, District Nowshera.
Nowshera
HW
23-01-15 30-06-17 - 27-10-14 - 480.592 363.385 105.01 124.127 97.873 97.873 461.258 12.197 97% 96%
February - 2017
Length 450 mtr - bridge structure, approaches 60% completed.
919
(OG)
140935-F/S, Design, Improvement & Widening of Road from Akora Khattak to Manai - Dooran - Tarkhel i/c link from Shahab Khel to Guldheri, Sawarkhel-Pitao to Kaka Sahib Eidgah, Khwar Miangan to Khawryan via Bagh Gali to Bus Adda, Kaka Sahib, Nowshera.
Nowshera
HW
13-05-15 - - 23-12-16 - 600 252.5 200 178.93 134.462 129.433 381.933 147.5 75% 64%
February - 2017
Length 27 Km - earth work 95%, sub base 15 Km, WBM 15 Km, WC 12 Km, structure work 80%, PCC road 6 Km completed. 2nd Revised PC-I/DCE for Rs.910.279 m submitted to SOR on 10/02/2017.
920
(OG)
140936-F/S, Design and BT of internal roads Pirpiai - Azakhel Bala - Payan - Dagai - Banda Nabi, Badrashi, Nowshera. SH: Const of internal road in UCs Dagai-Banda Nabi, Pirpiai, Badrashi, Azakhel Bala & Payan, District Nowshera (Phase-II).
Nowshera
HW
30-03-15 - - - - 530 245 150 183.68 146.18 146.18 391.18 135 75% 74%
February - 2017
Length 25.6 Km - earth work 100%, sub base 14 Km, WBM 14 Km, WC 16 Km, structure work 95% completed. Revised (2nd) PC-I/DCE for Rs.862.500 m submitted to Chief Infra on 19/01/2017.
921
(OG)
140938-F/S, Design & Improvement / BT of Internal 16 Km road at Kheshgi Bala and Payan, Nowshera.
Nowshera
HW
23-03-15 - - 23-12-16 - 750 115 100 58.772 33.772 33.772 148.772 535 29% 20%
February - 2017
Length 16 Km - earth work 95%, sub base 14 Km, WBM 14 Km, WC 14 Km, structure work 95% completed.
922
(OG)
140939-F/S & Construction of (a) Bakhtai-Kottli Khurd-Kottli Kalan road i/c Bridges (b) road from Cherat road to Spinkhak Village, Nowshera.
Nowshera
HW
16-03-15 - - 19-11-14 - 199.992 131.67 20 37.332 32.332 32.32 163.99 48.322 76% 82%
February - 2017
Length 6.7 Km - earth work 100%, sub base 6.5 Km, WBM 6.5 Km, WC 6.5 Km, structure work 90% completed. Bridge (80 mtr) transum completed.
923
(OG)
140940-F/S, Design & Construction of RCC Bridge on Kabul River at Kashti Pul, Nowshera Cantt.
Nowshera
HW
- 30-06-17 - 28-01-15 - 166.812 32 134.812 134.074 100.371 0 32 0 100% 19%
February - 2017
Contract agreement sanctioned by CA. FWO mobilized. Piling/bore, girder casting in progress. Revised PC-I/DCE fpr Rs.364.807 m submitted to SOR on 25/01/2017.
924
(OG)
140992-F/S, Design & Rehabilitation / Widening of Road from GT Road to Khushal Khan Khattak Mazar, Akora Khattak, Nowshera.
Nowshera
HW
11-03-15 30-06-17 - 19-11-14 - 124.99 90 34.99 34.99 21.494 9.419 99.419 0 100% 80%
February - 2017
Length 8.3 Km - earth work 95%, sub base 6 Km, WBM 6 Km, WC 6 Km, structure work 90% completed. Land acquisition in progress (Section-6).
925
(OG)
141019-F/S, Design & Construction / Rehabilitation of Roads (a) GT road to Said Akbar Koroona (b) Ayub Abad to Essori Bala (c) Jehangira Kati Maina (d) Pitao Payan to Dargai village (e) GT road Khwar Mohallah Shen Bagh Koroona, District Nowshera.
Nowshera
HW
25-05-15 - - 28-01-15 - 194.551 125 30 49.112 41.612 41.612 166.612 39.551 80% 86%
February - 2017
Length 12 Km - earth work 90%, sub base 7 Km, WBM 7 Km, WC 7 Km, structure work 95% completed.
926
(OG)
141021-F/S, Design & Construction / Rehabilitation of Roads (a) Khair abad to Mandoo Khel Village (b) Camp Koroona Yousaf Abad Akora (c) Adamzai to Momond Ghari (d) Jehangira Chowk to Railway Station, District Nowshera (10 Km).
Nowshera
HW
08-06-15 - - - - 194.914 125.9 30 49.07 41.57 35.276 161.176 39.014 80% 83%
February - 2017
Length 10 Km - earth work, sub-base 7 Km, WBM 7 Km, WC 7 Km, structure work 90% completed.
927
(OG)
141024-F/S, Design & Construction / Rehabilitation of roads (a) Gajoo Khel Ameero road (b) Jabbi road (c) Piran Bala and Payan & (d) From Duran to Masamkhel via Malikhel Bala Payan, District Nowshera.
Nowshera
HW
07-03-15 30-06-17 - 03-12-14 - 135.674 123.899 19.775 35.275 30.329 20.908 144.807 0 100% 100%
February - 2017
Length 11 Km - earth work 8 Km, sub-base 8 Km, WBM 8 Km, WC 8 Km, structure work 95% completed.
928
(OG)
150807-Construction of drain, pavement of streets and internal roads of UCs Pabbi, Khan Sher Garhi, Chowki Mumraz, Akbar Pura & Taru Distt Nowshera.
Nowshera
HW
01-05-16 - - - - 250 30 70 108.193 88.693 88.693 118.693 150 40% 47%
February - 2017
Length 23 Km - earth work, sub base, WBM, structure work, street pavement in progress. Revised PC-I/DCE for Rs.492.382 m submitted to Chief Infra on 19/01/2017.
929
(OG)
150809-Construction / Pavement of roads / streets alongwith allied works in UCs Aman Kot, Mohib Banda, Nowshera.
Nowshera
HW
01-05-16 - - 23-12-16 - 350 40 60 116 99 99 139 250 29% 40%
February - 2017
Length 17.5 Km - earth work, sub base, WBM, structure work, street pavement in progress.
930
(OG)
150810-Construction / pavement of roads / streets in UCís Kheshgi Bala, Kheshgi Payan, Aman Garh and Gandheri, Nowshera.
Nowshera
HW
01-05-16 - - 23-12-16 - 350 62.5 60 114.772 97.772 97.772 160.272 227.5 35% 46%
February - 2017
Length 15 Km - structure work, street pavement in progress.
931
(OG)
150813-Construction / Rehabilitation of Road from Inzari to Hisartang and Shaidu Khwar to Shinwari Koroona via Eidgah District Nowshera.
Nowshera
HW
- - - 26-11-15 - 100 0 20 10 5 5 5 80 20% 5%
February - 2017
Earth, structure work in progress.
932
(OG)
150816-Const./Rehab. of Roads in Village Kotar Pam Village Bara Banda UC Bara Banda, GT Road to Fazal Gange and Hassan Abad Risalpur GT Road to Mohallah Hassan Abad Rashakai, Kandar, Risalpur to Ghala Dher, UC Zara Miana, UC Pir Sabak, UC Mughalky, Nowshera.
Nowshera
HW
01-05-16 - - 23-12-16 - 200 68.593 60 60.924 43.924 38.498 107.091 71.407 64% 54%
February - 2017
Length 8.5 Km - earth work, sub base, WBM, asphalt 5 Km completed, structure work in progress.
933
(OG)
150955-Construction of drains, pavement of streets and internal roads of Dak Ismail Khel, Shah Kot, Dak Besud, Balu, Spin Khak and Jalozai Distt Nowshera.
Nowshera
HW
01-05-16 - - - - 250 46.2 60 118 109.193 109.193 155.393 143.8 42% 62%
February - 2017
Length 18.5 Km - earth work, sub base, WBM, structure work in progress.
934
(OG)
150957-Construction of road from Jalozai to Kotli Kalan Distt: Nowshera.
Nowshera
HW
01-05-16 - - 09-02-15 - 136.789 2.5 20 45.924 40.924 40 42.5 114.289 16% 31%
February - 2017
WBM in progress.
935
(OG)
150958-Construction / Rehabilitation of Jehangira Bypass and Nizampur road to Charpani village, District Nowshera.
Nowshera
HW
- - - 26-11-15 - 99.999 0 20 20 15 10 10 79.999 20% 10%
February - 2017
Structure work in progress.
936
(OG)
151074-Construction / Pavement of roads / streets alongwith allied works in UCs Kurvi and Dheri Kati Khel, District Nowshera.
Nowshera
HW
01-05-16 - - 23-12-16 - 350 50 50 120.93 106.93 106.93 156.93 250 29% 45%
February - 2017
18 Km - earth work, sub base, WBM, structure work in progress.
937
(OG)
140695-F/S, Design and Rehabilitation of (1) Tor Dher-Alla Dher Road (2) Nawa Nehar Kund Park-Alla Dher Road, District Swabi.
Swabi
- - - 22-01-15 - 180 45.4 5 21.386 20.136 20.136 65.536 129.6 28% 36%
February - 2017
Length 18 Km - BT 3 Km sub-base 5 Km, base course 5 Km, structure in progress.
938
(OG)
140961-F/S, Design and Construction of road from Shewa Chowk to Shewa Village (6 Km), District Swabi.
Swabi
- - - 23-12-16 - 200 50.438 40 57.772 46.772 40.771 91.209 109.562 45% 46%
February - 2017
Length 6 Km - 5 Km asphalt completed.
939
(OG)
140962-F/S, Design & Construction of Road Dobian to Nazar and Tarkha (8 Km), District Swabi.
Swabi
- - - 27-01-17 - 250 40.657 40 61.848 51.848 41.69 82.347 169.343 32% 33%
February - 2017
Length 8 Km - 5 Km asphalt, 1.5 Km WBM, 2.5 Km embank completed.
1) Dobian to Nazar and Tarkha (8 Km)
2) Tarkha road to Shaheedan (2.60 Km) PK-33
3) Nazar Chowk to Ismaila (7 Km) PK-33
4) Mardan-Swabi main road to Ismaila (4 Km) PK-33
940
(OG)
141001-F/S, Design and Construction / Rehabilitation of Tor Dher to Allah Dhr Road (3 Kms) and Jalbai Road (2 Kms), District Swabi.
Swabi
- 30-06-17 - 08-01-15 - 54.735 54.5 2.5 0.25 0 0 54.5 0 100% 100%
February - 2017
Completed (5 Km).
Namenclature changed.
941
(OG)
141002-F/S, Design and Construction / Rehabilitation of Roads (a) Kunda Topi (b) Gar Mergoz (c) Zarobi Topi, Swabi (21 Kms).
Swabi
- - - 22-01-15 - 210 98.409 40 61.848 51.848 51.435 149.844 71.591 66% 71%
February - 2017
Length 12 Km - 10 Km asphalt completed, structure work in progress.
1) Kunda Topi 2) Gar Marghuz 3) Zaroobi Topi
942
(OG)
141005-F/S, Design and Construction of Bridge on Nuranji Nullah at Banr Karnal Sher Khan Kali Road, District Swabi.
Swabi
- - - - - 97.804 72.207 30 30 22.5 15 87.207 0 100% 89%
February - 2017
12/12 girders, 12/12 piles, 4 pile cap, piers completed. Transum completed. Lauching of girder, deck slab in progress.
943
(OG)
150849-Const / Reh / widening of road from (a) Shahmansoor Town to Sikandari (b) Govt Girls High School Manari Bala to Saleem Khan Chowk (c) Panjpir main road to Shaga Bridge (d) Qazi Abad to Aboo Banda, Swabi.
Swabi
- - - 10-09-15 - 100 25 5 5.625 4.375 4.375 29.375 70 30% 29%
February - 2017
Length 8 Km - embankment, WBM completed.
944
(OG)
150850-Construction / BT of roads (a) Shaheed Garnay Qadamay Dheri (b) Turlandi Shehram Tarskai (c) Turlandi Khawaja (d) Turlandi Kalu Dheri Lahor Lar (e) Tarakai Lar Managai (f) Sheikh Jana Pio Dher (g) Sheikh Jana Mansabdar (h) Sheikh Jana Ahmad Khel District Swabi.
Swabi
- - - 23-12-16 - 300 20 40 67.31 56.31 51.982 71.982 240 20% 24%
February - 2017
Length 9 Km - sub base 4 Km completed, WBM in progress.
945
(OG)
150851-Construction / BT of roads (a) Karizoo to Urmar Sadri road, (b) Palosai Khairabad, (c) Rohani Bazargay road, District Swabi.
Swabi
- - - 23-12-16 - 300 20 35 35 26.25 26.25 46.25 245 18% 15%
February - 2017
Length 8 Km - sub base, embankment, drain in progress.
946
(OG)
150852-Const / Reh of Roads Baka Lar Tordher, Zakarya Salah, Haryan Salah, Jalbai Main Dhand, Faroq Banda Jehangira, Balo Haryan, Swabi Interchange Service to Sherafzal Shah Banda Balo, Swabi University, Jalsai Tordhe, Lahor Janazgah, Beka Shakh Nabi, Swabi.
Swabi
- - - 10-09-15 - 280 40 5 18.109 16.859 16.859 56.859 235 16% 20%
February - 2017
Length 13 Km - sub base, WBM, structure work in progress. Revised PC-I/DCE for Rs.195.982 m submitted to Chief Infra on 14/12/2016. Deferred with the direction to submit summary to CA for approval.
947
(OG)
150853-F/S, Design & Constructioin / rehabilitation of roads (a) Boko to Tashkand road (b) Jhanda Pajaman road (c) Bada Check Post via Mangal Chai to Gabasni (d) Marguz Yousafi road (e) Pabani road (f) Zarobi road (g) Kalabat Khazana road, Swabi.
Swabi
- - - 10-09-15 - 250 44.152 5 53.321 52.071 48.701 92.853 200.848 20% 37%
February - 2017
Length 16 Km (10 units) - sub base, WBM, structure work in process.
948
(OG)
150854-Construction of Road (a) Gabaie Panawal road (b) Leron Amarai Bala road (c) Chanai road, District Swabi.
Swabi
- - - 10-09-15 - 80 20 10 10 7.5 7.5 27.5 50 38% 34%
February - 2017
Length 6 Km - sub base, WBM, structure work in progress.
949
(OG)
150888-Construction / Rehabilitation / Restoration of Access road from Swabi Interchange to Tourism related project at Hund, Swabi.
Swabi
- - - 10-09-15 - 99.696 24.5 5 5 3.75 3.75 28.25 70.196 30% 28%
February - 2017
Length 5 Km - widening/structural, embankment work in progress.
950
(OG)
150959-Construction / BT of roads (a) Parmoli Bypass road (b) Permoli Sabar Wand Lar (c) Sher Dara road (d) Speen Kany Bandi Oba (e) Speen Kany Bande Oba Dojangi road (f) Speen Kany Aman Kot Lar PCC road, District Swabi.
Swabi
- - - 23-12-16 - 300 20.482 20 53.848 48.848 48.848 69.33 259.518 13% 23%
February - 2017
Length 8 Km - PCC, base course, structure work, sub base in progress.
951
(OG)
150960-Construction / BT of roads (a) Yar Hussain Shaheen Abad road, (b) Kas Koroona to Adena road, (c) Main road Shergaharri Asmela road, District Swabi.
Swabi
- - - 23-12-16 - 300 10 20 41.848 36.848 36.848 46.848 270 10% 16%
February - 2017
Length 8 Km - sub base, embankment completed.
952
(OG)
150961-F/S, Design and Const of roads, Gara Jehangira 1 Km, Jalsai Jaganat (2 Km), Jalsai Dhok (1 Km), Doba Lar (1 Km), Zakriya Khel (1 Km), Batlasai Naray Lar Ambar (1 Km), Hayatabad Azim Garhi (1 Km), Jehangira Mera Dhab (1 Km) Swabi.
Swabi
- - - 02-11-15 - 149.63 10 5 5 3.75 3.75 13.75 134.63 10% 9%
February - 2017
Length 8 Km - embankment completed, sub base in progress.
953
(OG)
160497-(a) Construction and BT of Mian Essa Chowk to Jehangira Road 1 Km (b) Constn of PCC road of Mian Essa to Police Chowk and Mohalla Awan Jehangira Road (0.8 Km), District Swabi.
Swabi
- - - 14-10-16 - 27.838 0 5 5 0 0 0 22.838 18% -
February - 2017
Work started.
954
(OG)
140666-F/S, Design and Construction of road from (a) Qasim Ahmed Abad to Chattaley Maira (b) Garhi Doulatzai and Jehangali Lar at UC Gumbat Maira, District Mardan (9 Km).
Mardan
HW
22-06-15 - - 22-01-15 - 128.475 41.95 10 42.772 40.272 36.425 78.375 76.525 40% 61%
February - 2017
Length 9 Km - sub base completed, base course 6 Km in progress. Drains in progress.
1) Qasim Ahmad Abad to Chattaley Maira PK-25
2) Ghari Doulatzai and Jehangli Lar at UC Gumbat Maira (9 Kms) PK-25
955
(OG)
140669-F/S, Design and Construction of Bridge and Approach Roads on Khan Gari Kalpani Nullah to Arbi Banda U/C Jehangir Abad and Sari Bahlol (5 Km including Bridge), District Mardan.
Mardan
HW
21-10-15 - - 22-01-15 - 85.614 34.599 10 23.655 21.155 16.473 51.072 41.015 52% 60%
February - 2017
5 Km/Bridge - test pile 1/1, load test 1/1, working pile 34/34, pile cap 5/5, girder 16/16 completed. Approcahes (sub-base) in progress.
5 Kms including bridge PK-26
956
(OG)
140925-F/S, Design, Construction & BT of (a) Chiragh din Killy to Fazle Abad UC Maday Baba & (b) Safi Abad to Dheri Killy Hathian, Mardan.
Mardan
HW
- - - 23-12-16 - 130.656 38.752 5 15.924 14.674 13.424 52.176 86.904 33% 40%
February - 2017
Length 7.5 Km - base course, BT 2.9 Km completed.
1) Chiragh Din Killi to Fazle Abad UC Maday Baba PK-27
2) Safi Abad to Dheri Killi Hatthian PK-27
957
(OG)
140929-F/S, Design & Construction of roads (a) Katlang to Qadar Village (b) Kot Ismailzai (c) Shahand Maqbara to Kareem Abad (d) Toot Killy Nehar to Babanay & (e) Toot Killy Nehar to Chaghzau village, Mardan.
Mardan
HW
01-08-15 - - 11-02-15 - 155.359 85 10 42.31 39.81 33.524 118.524 60.359 61% 76%
February - 2017
Length 8.5 Km -6.8 Km BT, sub-base, WBM completed. Dobai Adda, Gaddar road completed.
1) Main Katlang road to Gadar village (1.950 Kms) PK-30
2) Kot Ismailzai (1.700 Kms) PK-30
3) Shaheedano Muqbara to Kareem Abad (1.100 Kms) PK-30
4) Toot Killi road to Babaney village (1.200 Kms) PK-30
5) Toot Killi Nehar road to Chaghrzau road (0.800 Kms) PK-30
6) Construction and Black topping of Dobai Adda to Gul Abad 1.5 km.
958
(OG)
140931-F/S, Design & Construction (a) Battagram Nehar to Zai (b) Katlang to Kudi Noor (c) Dubi Ada to Srekh (d) Katlang to Qaziabad (e) Bakhshali Dheri to Jangirh (f) Gazi Shek Babuzi (g) Charsada to Dheray Baba (h) Pir Gari (i) Fatima to GGPS (j) Main to Bala Gari (k) Muhib to Husain Madrasa, Mardan.
Mardan
HW
13-06-15 - - 11-02-15 - 110.647 30.877 10 53.108 50.608 37.338 68.215 69.77 37% 62%
February - 2017
Length 7.5 Km - sub base, WBM, drain 868 mtr, pipe culvert, toe wall 220 mtr completed.
1) Battagram Nehar to Daulatzai road (1.700 Kms) PK-30
2) Katlang road to Khudai Noor village (1.500 Kms) PK-30
3) Dubai Adda to Sreekh village road (1.200 Kms) PK-30
959
(OG)
140933-F/S, Design & Construction of bridge on Naranji drain on Garhi Ismail Zai Kandar area near Panjbir Baba, Mardan.
Mardan
HW
- - - 06-03-15 - 28.317 0.973 5 2.5 1.25 0.973 1.946 22.344 21% 7%
February - 2017
Test pile 1/1 completed. Change of site involved CM directive already issued reagrding shifting of site. Rev DCE approved in DDWP on 03/03/2017. AA awaited subject to approval of summary.
PK-25
960
(OG)
140991-F/S, Design and Construction of Roads (a) Shatoo (b) Murad Koroona to Khana Dher and (c) Jalakai road to Shurkh Dheri, Mardan.
Mardan
HW
- - - 22-01-15 - 82.537 35.502 15 34.117 30.367 29.715 65.217 32.035 61% 79%
February - 2017
Length 5.5 Km - 5.11 Km completed except WC.
PK-29
961
(OG)
150230-Construction of Mardan Bypass Road from Rashakai Interchange to Jalala (Missing links 8 Kms), Mardan (including land).
Mardan
HW
01-01-16 - - 21-01-16 - 1078.85 405 100 121.848 121.848 121.848 526.848 573.85 47% 49%
February - 2017
Length 12 Km - Pack-I (4 Km) in progress, Bridge No. 1 & 2 in progress. Pack-2 (8 Km) - work in progress.
962
(OG)
150826-Construction / rehabilitation of internal roads of UC Toru Maira and UC Maho Dheri road, District Mardan.
Mardan
HW
01-04-16 - - 02-11-15 - 129.829 3.75 5 37.772 36.522 27.522 31.272 121.079 7% 24%
February - 2017
Length 5.82 Km - sub base 100%, WBM 100% completed except wearing course.
963
(OG)
150828-Construction / Rehabilitation of road (a) Kandary to Chatlay, Kombat to Qasam Kalay (b) Haspital road Qumbat from Dheki to Chunkay Bara Qadar Naseer road, Mardan.
Mardan
HW
11-07-16 - - 10-09-15 - 100 0 10 10 7.5 7.5 7.5 90 10% 8%
February - 2017
Length 6.5 Km - RW, drain completed.
a) Gumbat Chungay to Dhaki Killi (5.500 Kms)
b) Bara Qadar Naseer Killi road (1 Km)
964
(OG)
150830-Construction and Rehabilitation of Almas Killi to Shahmorpul, Gujar Garhi to Halki Killi road, Saidahed to Jungari Killi at Bridage, Pati to Shahnoor Pul, Sharmakhano to Depty Killi ring road, Mardan.
Mardan
HW
- - - 10-09-15 - 90 7.5 10 10 7.5 7.5 15 72.5 19% 17%
February - 2017
Out of 5 components, 5 in progress.
965
(OG)
150832-Construction BTR from main Malakand road to Tekhar Chowk via Vill Patai, Patai Chowk to Swat-Ways CNG, Rawani to PTC Company deptt, main Malakand road to Khattak Killi Distt. Mardan.
Mardan
HW
- - - 10-09-15 - 75 0 10 26.386 26.386 22.552 22.552 65 13% 30%
February - 2017
All 4 units in progress.
966
(OG)
150847-Construction and Pavement of internal roads, in UCís Machi, Rustam, Bazar, Chargali, Palo Dheri, Jamal Garhi, Sawal Dher, Kati Garhi, Katlang-I, Katlang-II,, Mardan.
Mardan
HW
- - - 10-09-15 - 126.05 0 10 26.386 23.886 23.886 23.886 116.05 8% 19%
February - 2017
4/5 units in progress. 1 unit shifting of site involved.
Pages : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45